March 2008 – DRAFT 1 Progress since Oct 2007 Third Party Greg Stadler and Jean Samuel.

Slides:



Advertisements
Similar presentations
What is Business Architecture?. Overview Agility matters today more than yesterday Previous methods for managing change were designed for the needs of.
Advertisements

Project update: Dec 2009-June 2010 Sally Baden, Project Manager, June 28.
HL7 EHR-S FM Child Health Functional Profile Project Overview HL7 Pediatric Data Standards Special Interest Group April 2007.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Action Programmes KAG / HoPS / PAD Workshop 3 rd March 2014.
Convergence Workshop, March 2013 The goals and expected outputs of the convergence initiative Dipak Kalra EuroRec.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
1 Femto Cell System Overview S.P Status Update to CDG and Femto Forum Fukuoka, Japan, September 2010.
Content Introduction Standard Templates 1.1 Background / Overview
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Principles of Project Management Case Study - Programme Management: Developing a Blueprint Graham Collins University College London (UCL)
Professional Behaviour
Welcome to Dorking PISCES Workshop 4. Introductions.
Financial Model ‘An integrated model for STFC’ Draft Blueprint Design v0.1 Project Manager: Mark Affonso Project Champion: Jane Tirard.
S&I Data Provenance Initiative Presentation to the HITSC on Data Provenance September 10, 2014.
Contents Introduction Public protection
Risk Based Asset Management in Capital Works Delivery Vito Albicini Former Director Infrastructure Services Bill Sharpe Manager Sustainable Asset Management.
The Crown and Suppliers: A New Way of Working People & Security15:35 – 16:20 Channels & Citizen Engagement Social Media ICT Capability Risk Management.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
ISO 9001:2015 Revision overview - General users
Software as a Medical Device (SaMD) Application of Quality Management System IMDRF/WG/N23 Proposed Document (PD1)R3.
Smart Meter Texas (Draft) Help Desk SMT Help Desk The Help Desk receives, fulfills and closes end user requests for service, incidents, resolution of problems,
ICT 1 Towards an Integrated Approach to Access Control to Health Information Presented by: Inger Anne Tøndel SINTEF Co-authors: Per Håkon Meland SINTEF.
The Code and Revalidation For everyone’s protection.
EHR Integration – Project Charter slide 1 Goals  Support specification of the already started service specification within HL7 RCRIM –going to ballot.
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
Surveyors Conference Project Update for the as of March 2007 Right of Way Data Management System (RWDMS)
1 Council Preparations Mark Hoolahan Learning & Development Team.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
SacProNet An Overview of Project Management Techniques.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
SIM- Data Infrastructure Subcommittee March 5, 2014.
The Leeds Joint Health and Wellbeing Strategy Explaining the approach to creating the refreshed Joint Health and Wellbeing Strategy for Leeds and.
NSDI Strategic Plan Update NGAC Meeting September 4, 2013.
Lunch & Learn – PMO Feb – March 2014 Summary March 31 st 2014.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
Integrating the Healthcare Enterprise IHE Plans for Multi-domain Testing and Demonstrations Steve Moore Technical Project Manager (ITI, Rad)
PHE portal update Anne Brice Mahesh Patel. PHE portal Progress so far Relationship between AKM and Online Services workstreams Engaging with content users.
Project Management Framework SEEA Experimental Ecosystem Accounts SEEA Extensions and Applications Alessandra Alfieri United Nations Statistics Division.
Tom McBride.  This report on the PPIR Project proposes a way of defining and formally recognising how professional engineers interact with, and respond.
Water.europa.eu CIS Ad hoc activity on WFD Economic Issues -Progress Update Strategic Coordination Group Meeting, 23 February 2010 DG Environment, European.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Design and buildTestShadowGo live Oct 15Nov 15Dec 15Jan 16Feb 16Mar 16Apr 16May 16Jun 16Jul 16Aug 16Sep 16Oct 16Nov 16Dec 16Jan 17Feb 17Mar 17Apr 17 Oct.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Home Care Support Provision Outcome Based Framework Workshop 5 th November 2009.
1 Home Care Support Outcome Based Specification Workshop 26 th November 2009.
Virtual Team Project and IBM Connections WRIT 340 Prof. Walker WRIT 340 Prof. Walker.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Plans for Multi-domain Testing and Demonstrations Steve.
Delivering eHealth Ireland | Office of the Chief Information Officer IHI Infographic Office of the CIO | Delivering eHealth Ireland.
Data Analysis in the Water Industry: A Good-Practice Guide
Regional SDGs Indicator Framework Development
Information Sharing for Integrated care A 5 Step Blueprint
The International Plant Protection Convention
GEOSS Data Sharing Principles
National Dental Core Training projects April 2016 update
EMERGENCY PLANNING GUIDANCE FOR RAIL MARSHALLING YARDS
Implementing Equitable Services Requirements
ESF Evaluation Plan England
GDPR Dashboard General Data Protection Regulation 06/02/2018
WG GES: Decision review progress
Water Directors’ Meeting Working Group D (Reporting) activities
GDPR Dashboard General Data Protection Regulation 06/02/2018
Next Steps on the §309 Regional Technical Support Document April 2003
Scene setter European Commission DG Environment
NICE has many methods and processes
Ad-hoc Task Group on Hydromorphology
4th Meeting of the Expert Group on the Integration of Statistical and Geospatial Information (UN EG-ISGI) – Nov 2017 Summary of progress Martin Brady,
Presentation transcript:

March 2008 – DRAFT 1 Progress since Oct 2007 Third Party Greg Stadler and Jean Samuel

March 2008 – DRAFT 2 Third Party EHR 2 Third Party concept to differentiate: 1.Third party acting as an “honest” gate keeper between the data holder and anyone wanting to use the data, primarily to protect privacy (Trusted Third Party - TTP) 2.The Third Party acting as an information broker, in which various data sources are integrated and then made available via a single point of contact for those wishing to do medical research with it; sort of an information clearing house (Information Broker – IB) Progress to date focused on no. 1 above, in breakout to follow we’ll have time for both.

March 2008 – DRAFT 3 Objective - TTP  Develop clarity regarding the likely remit, role and responsibilities of a TTP and where such a third party organisation would fit into the EHR Clinical Research model.  Scope includes: –Identification of the rules and governance and behavioural characteristics with which EHR TPs must demonstrate. Governance: Knowledge maintenance Knowledge operationalisation Model contract Identification of the technical infrastructure and data management tools needed for EHR TPs to operate Appreciation of conflicts of interest

March 2008 – DRAFT 4 Progress - TTP  1 Feb 2008 – TeleConf to refine and agree project Charter  10 Feb 2008 – 1 Day workshop with representative experts from TTP service providers, Industry, Management Consultants and EuroREC. –Reviewed case studies showing current examples of TTP services provided today (IBM, Custodix) –Brainstormed Services required in an ideal TTP engagement –Aligned the ideal service provision to real life Clinical Research scenarios and mapped intersection –Reviewed high level governance –Reviewed high level example model contracts –Reviewed and documented obvious conflicts of interest  14-29/2 participants provide draft inputs from various sections. Jean Samuel and Greg Stadler pulled together the first draft document which was circulated to you all last week.

March 2008 – DRAFT 5 Conclusions and Next Steps  The first pass TTP Guidance document is very high level, very rough, but a good start!!  Next steps: –Circulate the draft to a wider audience, gather input, refine – Workshop 11 March –Finalise draft before end April 2008 –Decide where the document should be hosted, who should own it and where should it be published to maximise the value from it. –Publish by end June 2008.