1 TSG Leadership Process Recommendations Inclusions and Exclusions +1 469 360 8500.

Slides:



Advertisements
Similar presentations
Robert E. Kondziolka Salt Lake City, Utah May 6-7, 2007 WECC JGC Leadership Training Expectations of WECC Leadership.
Advertisements

European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 12a 1 All you always wanted to know about.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
3GPP2 TSG-SX Restructuring Source: TSG-S Vice Chair; Jane Brownley With thanks to: TSG-C Chairman; Ed Tiedemann, TSG-A Chairman; Xiaowu Zhao, TSG-X Chairman;
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 1 All you always wanted to know about.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: IEEE Down Selection Process Date Submitted: January 18, 2005.
GNSO Policy Development Process. “The PDP is broken”….. Photo credit: 2013 NYCitywoman.
360Exchange (360X) Project 10/25/12. Reminders / announcements Mission / scope review Workgroup updates Implementation sites 1 Agenda.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Project Work and Administration
Applied Software Project Management 1 Introduction Dr. Mengxia Zhu Computer Science Department Southern Illinois University Carbondale.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 2 1 All you always wanted to know about.
3G.IP/ R1 3G.IP 2002 Charter. 3G.IP/ R1 2 3G.IP Mission Statement u Actively promote a common IP based wireless system for third generation.
Trusted IT Group. The challenge: 40 active, concurrent IT projects  Unsatisfactory Project Delivery.
Policy WG NIH policy proposal. Goal: Incorporating global access licensing as one of the additional review criteria Question 1: Should we propose this.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
How to Run an Effective Regional Board Meeting. Self-paced version Whenever possible, answers and explanations are interjected in yellow Select “Slide.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
#ICANN49 Standing Committee on Improvements Implementation (SCI) Activities Update to the GNSO Council ICANN Singapore Meeting 22 March 2014.
1-2 Training of Process FacilitatorsTraining of Coordinators 6-1.
A National approach to Cyber security/CIIP: Raising awareness.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Training begins in… 15:00 minutes Training begins in… 14:00 minutes.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
How to Run an Effective Regional Board Meeting. Self-paced version Use mouse click to advance the slides.
Advocacy: Influencing Facility Development in Public Parks and Recreation Departments Tennis advocacy should occur year round through informal communications.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Standardization Management Board Decisions How They Affect Your TAG! Jim Matthews Vice President & SMB Chairman.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Doc.: IEEE COEX-01/004r0 Submission July 2001 Jim Lansford, Mobilian CorporationSlide 1 IEEE Coexistence Study Group Recommendations to create a Coexistence.
Doc.: IEEE /0203r1 Submission March 2012 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
1 Pioneer Investments Legal and Compliance System Assessment Weekly Status Update June 23, 2005.
NGN Management Focus Group (December 2004) - 0 3GPP TS Flow-based charging requirements Title: 3GPP Overall high level functionality and architecture.
Steering Committee Meeting 7/15/15 0. Draft Agenda 1.Updates 2.NRCS Emergency Watershed Protection Program 3.Governance 1.
Public Health Practice Council Meeting January 31, 2007.
Doc.: IEEE /0203r0 Submission March 2012 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®
Minutes Left:
Teamwork Skills Building Successful Teams Working in a Team Training & Leadership.
3GPP2 Restructuring Source: TSG-A Chairman; Xiaowu Zhao TSG-C Chairman; Ed Tiedemann TSG-S Chairman; Nick Yamasaki TSG-X Chairman; Marvin Bienn Copyright.
TSG-S Comments to TSG Chairs Regarding Proposed 3GPP2 Restructure Nick Yamasaki Chair, 3GPP2 TSG-S
March 2004 Brian Mathews – AbsoluteValue Systems IEEE doc: IEEE / Submission Bonneville Team Brian Mathews, TK Tan, Bruce Kraemer,
3GPP2 TSG-SX Structure & Working Procedure Source: TSG-SX Chairman: Xiaowu(Frankle) Zhao TSG-SX Vice-Chair: Yuezhen Wang/Mike Dolan, Copyright Notice 3GPP2.
#ICANN50 Standing Committee on Improvements Implementation (SCI) Activities Update to the GNSO Council ICANN-50 London Meeting 21 June 2014.
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
VIA Telecom PROPRIETARY 3GPP2 Directions Ed Tiedemann Chair TSG-AC 13 November 2013 Copyright Notice 3GPP2 and its Organizational Partners claim copyright.
Contents Major issue states and transitions Tools.
20 September 2004 C R4 0 Proposed Process for TSG-C Work Items Source Alberto Gutierrez Motorola
802.16m Closing Report July 16, 2009 San Francisco, CA Session # IEEE m-09/0035r1.
NR workload management
Pre-Investigational New Drug (pre-IND) Meeting with FDA
Motorola Mobility, Lenovo, …
IEEE Coexistence Study Group
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
IEEE Coexistence Study Group
IEEE MEDIA INDEPENDENT HANDOVER DCN:
GEME WG Kick-off meeting
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
Are you measuring what really counts?
Essential Freshwater.
Presentation transcript:

1 TSG Leadership Process Recommendations Inclusions and Exclusions

2 Goals of the TSG Leadership Analysis Goals: – –Find ways to streamline the 3GPP decision making process – –Reduce company/delegate frustration Recommendations are fine-tuning of the existing processes – –3GPP processes overall work pretty well – –Key consideration: Do no harm Does not address any restructuring – –Much frustration due to overload of some groups – –Handovers between groups not always efficient

3 Issues Addressed Consensus and Voting – –How to prevent blocking by a small minority – –Do rules for last minute voting and voting list composition need clarification? WorkItem creation – –Can and should we raise the bar for WID and SID creation? Improved Workplan and Release Planning Running meeting more efficiently and fairly – –See ARIB/TTC contribution Miscellaneous – –Tools – –Workflow between Stages – –Training

4 Issues Not Addressed TSG or WG Organization –Out of ScopeTSG or WG Organization –Out of Scope Partitioning of work between WGs – Out of ScopePartitioning of work between WGs – Out of Scope Prioritization of Work – Out of ScopePrioritization of Work – Out of Scope Top Down Release Planning – Out of ScopeTop Down Release Planning – Out of Scope Reducing Architectural Divergence – Out of ScopeReducing Architectural Divergence – Out of Scope Meeting Schedule – Already Discussed Many TimesMeeting Schedule – Already Discussed Many Times Meeting Structure/Agenda – Already Discussed Many TimesMeeting Structure/Agenda – Already Discussed Many Times Meeting Venues – Already Discussed Many TimesMeeting Venues – Already Discussed Many Times Voting on other than Yes/No Questions – Issue proposed too lateVoting on other than Yes/No Questions – Issue proposed too late Unclear rules for liasing with ITU – Issue proposed too lateUnclear rules for liasing with ITU – Issue proposed too late