1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Walls crates cables gas chambers electronics CERN adb.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Xenon Detector Installation schedule Satoshi MIHARA.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
The LHCb Installation Story
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
Tropical cyclones movement
February 2007 Note: Source:.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule

2 Full-scale prototype Construction completed: no major problem with construction procedure or with jigs ready to go for final design Presently studying gas purity and window configuration. Only inner window glued. Outer window attached with masking tape.

3 Full-scale prototype 200 l/h N 2 flushing Single window 50 micron thick is not enough Can reach less than 10 ppm water within couple of weeks. need a few weeks to complete the window studies and decide on configuration: - single window of ~100  thickness - 2x50  window without N 2 flushing - 2x50  window with N 2 flushing

4 Acceptance |  | ≤ 0.45  = 135 o |  | ≤ 0.36  = 104 o

5 Light source test GOAL: direct measurement of N 0.  Trigger counters installed and aligned.  DAQ OK  Detector vessel, radiator and detector module with CsI photocatode sent from WI to BNL.  CsI measured at BNL and found consistent with measurement at WI  Gas system and transmission through radiator  Urgently need of glove box for detector assembly

6 Schedule: 1. Detector construction  Goal: Detector ready for Run-6.  Working hypothesis: Run-6 is delayed, starts Jan  HBD construction: A. WI: - Detector and jigs design: 2m start May 1 st  end June - Vessel construction: 3m start June 1 st  end August. - Framing and pretest of GEM foils: schedule dictated by foil delivery from CERN scheduled to start May 1 30 foils/month  assume total delivery time of 4m. Work start June 1 st  end September. Shipping to SBU start July 1 st  end October. B. SBU: - Set-up of assembly and test facility should be completed by July 1 st. - CsI evaporation and module test proceed in parallel in assembly line fashion. Work start July 15  15 November. - Final detector assembly and test November – December. - Full detector ready for installation Jan Critical items: - freeze acceptance and GEM size - freeze design and produce motherboards

7 Schedule: 2. Electronics Pre-amplifier production: - First batch of 200 pre-amps already produced - Production start July, complete in 1-2 months FEM production: - FEM prototype ready end of May 3m test  end August - FEM production: begin September 2005  February FEM test and installation Gas system: - Construction start after Run-5, complete in 2 months Monitoring systems: - 4m delivery time, ready in September Infrastructure (gas pipe, HV, LV): - start after Run-5 Schedule: 3. Gas, monitor, infrastructure