GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
THEMIS Mission Assurance
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 DAQ/Electronics PDU: -Completed handoff of 1 st PDU (GLAT1898) to I&T -2 nd PDU scheduled for delivery from Aeroflex in December GASU: -1 st GASU completed vibration testing -CCAs for 2 nd GASU still in assembly at Aeroflex SIU: -Completed environmental testing on proto-flight and first two flight boxes New vibration testing facility used for GASU and 2 SIUs -Primary vendor (Wyle Labs) had equipment problems -Quanta Labs (Santa Clara) was used to maintain test schedule -QA survey was conducted prior to hardware testing; no QA issues -Quanta Labs engineering support and test equipment capabilities is superior to that of Wyle

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 DAQ/Electronics QA issues with hardware built at Aeroflex: -Returned backplane (GLAT 2418) after observing flux residue on cPCI connector pins and discoloration/contamination in areas of conformal coat -Aeroflex received board yesterday and will evaluate for cleaning/rework -Expect rework to complete by next week -cPCI X-ray evaluation -NCRs have been generated when solder touch up is required -GSFC also reviewing X-rays of soldered connectors for solder void/fill evaluation -Will schedule MRB to discuss any differences between GSFC and SLAC evaluations -Continue to receive timely in-process and pre-ship inspection reports for each board from SLAC source QA at Aeroflex, so workmanship issues and rework are clearly tracked -LAT QA also supporting twice weekly status telecons with Aeroflex -Workmanship issues with Aeroflex boards have not been completely eliminated, but have been greatly reduced and have not resulted in scrapping of CCAs

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 DAQ/Electronics RAD750 boards -Spectrum/Astro reported particulate contamination (electrically conductive epoxy) on their two RAD750 boards (S/N 16 and 24) following rework at BAE -SLAC RAD750 boards were also reworked; five flight boards (S/N 12, 14, 15, 17, 18) in-house at SLAC were inspected and did not show contamination levels observed on S/A boards; no additional cleaning was required -SLAC received sixth flight board (S/N 13) yesterday; will inspect for contamination -S/A to investigate cause of contamination on their boards and possibilities for cleaning

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 RAD750 board contamination SLAC and Spectrum Astro observations S/N 018 (SLAC Board) Fine particulates observed lightly dispersed in localized regions (magnification 20X) S/N 024 (S/A Board) High density of particulate contamination. (magnification 30-40X)

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 RAD750 board contamination SLAC and Spectrum Astro observations S/N 018 (SLAC Board) Area around processor leads is visibly clean. Typical of majority of S/N 018 surface (magnification 25-30X) S/N 024 (S/A Board) Area around processor shows heavy particulate contamination (magnification 30-40x)

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 Integration and Test -Supported completion of 16 Tower integration and 16 Tower testing -Supporting inspection of parts and hardware still being received -Continue to lead weekly MRBs to work through I&T NCRs for closure

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 Tracker -Supported successful preship review of final Towers delivered -Supported Tracker team in addressing some specific INFN NCRs as requested by GSFC Product Assurance: -Identify Tower locations of TMCMs that incorporated silicone masking tape during assembly -Identify Tower locations of trays that incorporated epoxy encapsulant on MCM to SSD wire bonds -Cause of observed wire bond breakage on Tower A heavy trays -Cause of noisy channels observed in some trays -Cause of wire bonds shorting to SSDs in Tower 1 trays -Response to these questions has been completed by Tracker team; plan on reviewing these issues with GSFC this week or next -Finalized qualification test plan for Parlex and Pioneer flex cables -Plan has been approved by SLAC, GSFC and cable vendors -Will use qty = 10 bare flex cables from each vendor for qualification -Trace Labs (Hunt Valley, MD) will conduct the same qualification testing on Parlex and Pioneer cables -Goal is to successfully complete qualification testing before LAT ships to NRL

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 Mechanical Systems X-LAT Plate -Delivered to SLAC in July; reviewed acceptance data package from Lockheed Martin. Still have not received final data package -Need to repeat proof load test on lift fixture -Cracked welds observed after first proof load test -Fixture was reworked; needs to be retested/inspected Radiators -Received 9/30/05 -Identified open items in acceptance data package -LM has not yet completed data package Static Load test (Grid #2) -Supported Test readiness review with vendor (NTS) -Delta TRR scheduled for tomorrow to close remaining issues -LAT QA plans to witness and support static load test

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Status October 2005 FSW QA -Completed first successful formal dry run of test scrip and procedure -Completed audit of Build B0-5-1 (one finding, two observations) -Supported V&V of LATTE Release R Continued support of FSW Test Script development, dry runs and LICOS development -Participated in Quality Requirements Management Process assessment with GSFC SW QE (R. Worden). -No findings were noted by GSFC during the assessment

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 SubsystemOpen NCRs Closed NCRs last 30 days NCRs Open 30 days or more NCRs open 90 days or more NCRs ready to close (disposition complete; need final QA review to close) DAQ Tracker Mechanical21111 CAL00000 ACD*10*0700 I&T * includes 5 open ACD PRs and PFRs from GSFC LAT NCR Metrics 11/3/05

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 Issues and Concerns Flex Cable Qual Testing -Need to complete qual testing of Parlex and Pioneer flex cables. Goal is to complete before LAT ships to NRL Final data packages and lift fixture from Lockheed Martin -Open items in data package are identified; need LM support to close -X-LAT Lift fixture needs to successfully pass second proof load test and inspection Continued focus on addressing and closing NCRs

GLAST LAT ProjectMonthly Status Review – Nov. 3, A P&SA – Planned Accomplishments November 2005 Support testing of electronics CCAs and boxes Support formal dry runs of FSW test scripts/procedures Continue to work closely with Aeroflex to minimize workmanship issues Support and monitor results of flex cable qual testing Support Grid static load testing Work with Lockheed Martin to complete documentation packages and have remaining hardware delivered

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 Cost Report

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 Cost Variance Explanation Why overrun/underrun? -Overrun due to higher FTE required for support than budgeted. Continue to show lower overall FTE. What will be done to correct? -FTE will continue to decrease. One SLAC QE (Richard Gobin) left program in October. Can reduce FTE as final subsystem hardware production is completed

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 FTE Report (DOE/NASA-funded only)

GLAST LAT ProjectMonthly Status Review – Nov. 3, 2005 FTE Variance Explanation Why overrun/underrun? -Needed to continue higher than budgeted level of QE support at SLAC. What is the impact? -FTE continues to decrease. Will saee decrease of approx 1 FTE in October (SLAC QE left project) What will be done to correct? -Further reduction of FTE at SLAC expected in December as hardware production ends