Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.

Slides:



Advertisements
Similar presentations
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Advertisements

Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
Alan Hamlet Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington March, 2001 CIG Water Resources.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
Announced Coal Unit Retirements: Effect on Regional Resource Adequacy Council Meeting January 16, 2013 Portland, Oregon Boardman Centralia 1.
Hydro Power 102. Hydroelectric Models in the Northwest.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Interim and Long-term Approaches for Assessing Wind’s Contribution to Capacity Adequacy PNW Resource Adequacy Steering Committee Meeting July 21, 2008.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Wind Power Capacity Assessment Mary Johannis, BPA, representing Northwest Resource Adequacy Forum Northwest Wind Integration Forum Technical Working Group.
2010 Work Plan Steering Committee January 29, 2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Resource Adequacy Perspectives PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Out of Region Market Assumptions
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
GENESYS Current Functionality
Capacity Analysis in the Sixth Plan
Technical Committee Meeting March 18, 2016
Technical Committee Meeting March 18, 2016
Progress on Resource Adequacy Assessment for 2017
Presentation transcript:

Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007

PNW Resource Adequacy Technical Committee 2 Pilot Capacity Adequacy Standard Planning reserve margin (PRM), which is the surplus generating capability over expected peak load during the peak load hours for each month in units of percent, where: Generating capability is defined as the sustained peaking capability from: –All non-hydro resources –Uncontracted in-region Independent Power Producer (IPP) resources: 100 percent in winter 1,000 MW in summer –Hydroelectric capability over sustained peaking period Firm hydro capacity to meet 1 in 2 loads under critical hydro Hydro flexibility: 2,000 megawatts in winter and 1,000 megawatts in summer –Out-of-Region spot market resources: 3,000 MW in winter 0 megawatts in summer –The net of firm imports and exports into and out of the region Expected peak load is defined as the average load over the peak load hours (10 hours per day over 5 days = 50 hours), based on normal temperatures.

June 20, 2007PNW Resource Adequacy Technical Committee 3 Suggested Change to Capacity Metric: Revise Sustained Peaking Period Define sustained Peaking Period as 6 Maximum Load hours over 3 or 5 days Reasons for Revised Metric: –Ten highest Consecutive Load Hours can Miss Peaks in the Winter –MWa over ten highest consecutive load hours resembles Energy Available over Heavy Load Hours  this can disguise “Peakiness” of Resources needed to meet Regional Loads –Six hour Metric is more comparable with WECC One hour Metric than the current Ten hour Metric

June 20, 2007PNW Resource Adequacy Technical Committee 4 Suggested Change to Capacity Metric: Revise Sustained Peaking Period Consistent with Sustained Capacity & Load Duration Curves –Comparison of Hydro Capacity & Load Duration Curves indicate similar slopes for 6 hour sustained peaking duration for Winter and Summer Months  Sustained Peaking Hydro Capacity sufficient to Cover Load –Steeper Slope for Hydro Capacity Duration Curve Compared to Load Duration Curve in 10 to 12 sustained Peaking Period is of no Consequence because Hydro Flexibility not needed as much during Trough Hours

June 20, 2007PNW Resource Adequacy Technical Committee 5

June 20, 2007PNW Resource Adequacy Technical Committee 6

June 20, 2007PNW Resource Adequacy Technical Committee 7 Hydro Capacity Assessment Decision PILOT CAPACITY ADEQUACY STANDARD: Regional Hydro Capacity is assessed in Two Components: –Firm Hydro Capacity, i.e. Hydro Capacity available under Critical Water Conditions (Traditional Definition) –Hydro Flexibility available to meet 1 in 20 year temperature event, still assessed under Critical Water Conditions (2,000 MW Winter & 1,000 MW Summer estimate of Hydro Flexibility = CONSERVATIVE) SUGGESTED REVISED STANDARD: –Critical Hydro Conditions plus 1 in 20 Temperature Event is too rare of an event to which to plan Hydro –Combination of Water Condition and High Loads should simulate a 1 in 20 year event, or a P5 event, as Nexus to LOLP analysis:

June 20, 2007PNW Resource Adequacy Technical Committee 8 Hydro Capacity Assessment Decision FCRPS Example: –Feb 1989 Temperatures and Median Water is most Constrained P5 Event Are Runoff and Temperatures Independent Variables? –Based on limited data points, analysis indicates YES –Comparison of Jan-Jul Runoffs and Cold Snaps with 3-day load center averaging 10.5 °F or less MAF

June 20, 2007PNW Resource Adequacy Technical Committee 9 Hydro Capacity Assessment Decision Of the 78 years of record that we have for Jan-Jul Runoff at the Dalles, 19 out of 78 are below 85 MAF  24.4% of the years are dry In the cold snap years listed above, 1 out of 7 years, 14.3%, is below 85 MAF Conclusion: Cold snap Temperatures are not necessarily Indicator of a low volume year Temperatures & Runoff Conditions are quasi- independent Variables and can be multiplied together to yield combination probability events

June 20, 2007PNW Resource Adequacy Technical Committee 10 Comparison of FCRPS Capacities* FCRPS Installed Hydro Cap= 21,500 MW 1 Hour Sustained Cap= 17,200 MW 10 Hour Over 1 Day Sustained Cap= 16,200 MW Sustainable Operational Cap= 11,200 MW Sustained Peaking Capacities White Book 6 Hour Over 1 Day Sustained Cap= 16,700 MW *Based on historic winter day assuming available generating capacity, stream flows and BiOp requirements

June 20, 2007PNW Resource Adequacy Technical Committee 11 Capacity Metric

June 20, 2007PNW Resource Adequacy Technical Committee 12 Capacity Metric