FLAO_08 FLAO System Shipping Plan Document 646f010a Richard Demers, Guido Brusa, Armando Riccardi, Daniele Galieni FLAO system external review, Florence,

Slides:



Advertisements
Similar presentations
W Unit Opto-Mechanical Acceptance Test Specifications A.Tozzi, E.Pinna, S.Esposito FLAO system external review, Florence, 30/31 March 2009 FLAO_03 (CAN:
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
The adaptive secondary mirror. Current technology for MMT/LBT A. Riccardi 1, G. Brusa 1, C. Del Vecchio 1, P. Salinari 1, R. Biasi 2, M. Andrighettoni.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
FLAO Interface Control Document
Chapter 13 Sequential File Processing. Master Files Set of files used to store companies data in areas like payroll, inventory Usually processed by batch.
LBT672 opto-electro-mechanical specification overview Presented by A. Riccardi A. Riccardi, G. Brusa, R. Biasi, D. Gallieni FLAO system external review,
FLAO commissioning with InfraRed Test Camera (IRTC) S. Esposito, G. Brusa, A. Riccardi FLAO system external review, Florence, 30/31 March 2009.
Telescope Control System Paul J. Lotz. Scope 2 TCS components 3.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Telescope Integration and Tests Tuesday Afternoon.
LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 LBT672 ADAPTIVE SECONDARY UNITS Current status, acceptance test plan and specifications.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
1 Asset Disposal Project Rebuild Proposal For Mobile Equipment.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Topic 6 Managing stage boundaries
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
21/5/2007Thomas S. Bauer - Nikhef1 Input Mode Cleaner Update LIGO-G Z.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
Report to the SSC Jan 10, Report to the SSC-Jan 10/02Page 2 Key Dates Nov 13-14/01Preship Review Jan 4/02Final review before disassembly Jan 7Start.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
ITIL Project Change Management Workshop 7 February 2007
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
GLAST Large Area Telescope:
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Planning for Proto-DUNE PD Installation and Cabling at CERN
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
TABLE OF CONTENT INTRODUCTION OVERHAUL PROCESS DOCUMENT REQUIRED
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Completion of the MICE-US construction project
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
UK RFD Pre-Series cryomodule
Daresbury ESS In-Kind Contributions
UPDATE on SVN & MANTIS Upgrade
Magnet, Support and Infrastructure
as a prototype for Super c-tau factory
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

FLAO_08 FLAO System Shipping Plan Document 646f010a Richard Demers, Guido Brusa, Armando Riccardi, Daniele Galieni FLAO system external review, Florence, 30/31 March 2009

2 1. Objective & Scope Objective – –Design a procedure for disassembly, packing and shipment of all hardware from Arcetri to LBTO –Ensure hardware safety –Conform to the program schedule Scope – –Point of origin for all hardware is OAA –Delivery to LBTO basecamp or Sunnyside facility –Does NOT include transportation to summit All containers must withstand transport from basecamp to summit on un-paved roads The plan development is work in progress and will be completed soon enough to meet the program shedule

FLAO system external review, Florence, 30/31 March Objective & Scope, cont’d Previous experience – –Thin shells Disassembly Packing Transatlantic shipment Customs go-between –SM Disassembly Shipment within Italy –AGw Disassembly Shipment within Europe

FLAO system external review, Florence, 30/31 March Summary of hardware sub-systems Key dates Shipment of AO System 1 – Nov 2-27, 2009 Shipment of AO System 2 – Jul 28-Aug24, 2010

FLAO system external review, Florence, 30/31 March AGw Disassembly and packing procedure is under development Chassis to be shipped in custom container w/ passive shock absorbers Components to be packed in separate containers from the chassis –WFS board –CCD heads –Pyramid prism(s) –FSM –Camera lens positioner w/ PZT –Beam splitter cube from auxiliary bench –Pupil rotator (pending method to recover alignment of rotator axis) Ref documents –646f010a –TBD

FLAO system external review, Florence, 30/31 March Secondary Mirrors Disassembly and packing sequence 1Dismount SM unit and transport to cleanroom 1 2Dismount thin shell from SM unit 2 3Invert the thin shell 3 4Protect the SM unit from contaminants 5Separate the hexapod and surrogate hub from the remaining unit 6Pack the hexapod + telescope hub on its transport frame in shipping Crate n.1 7Pack the remaining SM unit on its transport frame in Crate n.2 8Pack all supports, lifting frames, cranes, tooling and RRH in Crate n.3 Ref documents 1.646f006 (reverse procedure) 2.646a f009a

FLAO system external review, Florence, 30/31 March Thin Shells Disassembly and packing sequence 1 1Invert the thin shell (already completed for the previously integrated shells) 1 1Exception – replace the cleaning tray with the shipping tray 2Must modify the lateral restraint on the TS 2Install thin shell on lower shipping tray 2 1Exception – Will not apply protective coating (Opticote) on the convex surface due complex magnet topography 2Application of on the concave surfaces is TBD 3Pack the thin shell in the inner box 4 4Pack the inner box in the outer box (shipping container) 5 Ref documents 1.646s202b 2.646f009a 3.646s085d 4.646s120a 5.646s123a b

Remaining work Create implementation schedule Develop details in AGw part of the plan Provide final container requirements to ADS and agree on schedule for delivery Make changes to the TS inversion procedure documents FLAO system external review, Florence, 30/31 March

RESERVE SLIDES FLAO system external review, Florence, 30/31 March 2009

Thin Shell Inventory FLAO system external review, Florence, 30/31 March