Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.

Slides:



Advertisements
Similar presentations
Ian Kirkman and Graham Cox July 29 th EMMA commissioning shifts so far June 21 st, 22 nd, 23 rd and July 12 th, 13 th, 14 th, 15 th “Analogue” BPM.
Advertisements

Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
XFEL 2004 at SLAC m. ferianis Synchronization and phase monitoring: recent results at ELETTRA Synchronization experiment using light sources currently.
Output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,
Timepix Studies: Medipix Collaboration Summary and More Timewalk Plots Alessandra Borgia Marina Artuso Syracuse University Group Meeting – Thursday 20.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Chopper Testing 8/3/06. Chopper Information We chose to use the Thorlabs chopper with two 7-slot wheels offset to give approximately 728μs (18.7º) of.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
Announcements Assignment 6 due on Friday Project ideas due today
 Popular instrument to show time, voltage both DC and AC. Shows Volts / Time.  Display waveforms. Spectrum scope shows volts to Frequency  Cathode (-ve.
Range Measurement Unit Messenger Mercury Laser Altimeter Basic Familiarization.
The TIMING System … …as used in the PS accelerators.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
Ground Plane Pulser 1. Introduction The TPC uses a pulser system to calibrate the FEE electronics, check for bad channels, and correct for slight variations.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
MIT runs syn no label No Label was not connected TTL trigger from delay box CH A to syn.
ENEE 440 Chapter Timer 8254 Register Select The 8254 timer is actually 3 timers in one. It is an upgraded version of the 8253 timer which was.
DMP Product Portfolio Femtosecond Lasers Trestles Ti:Sapphire lasers …… fs; nm, mW Mavericks Cr:Forsterite lasers
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Berkeley Nucleonics Instrumentation Since 1963…. Management Team David Brown, President 15 Years, BA Management Mel Brown, Director of Finance 45 Years,
PIT Programming Examples Working with the modes of PIT.
3-CELL TEST RESULTS & 9-CELL PLAN Howie Pfeffer 11/13/13.
CTF3 Collaboration meeting – CERN, January 2007 Laser system schematic 22 44 1.55  s 200  s, 5-50 Hz 15 kW 10  J 270  s ~2332 pulses 370.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
The PITZ Timing System Frank Tonisch DESY - Zeuthen.
Shutter Inspection and Testing for new Teflon coated blades.
Why we need adjustable delay? The v1495 mezzanine card (A395A) have a signal transmission time about 6ns. But we need all the signals go into the look.
8114A Overview. 8114A Overview 10-Feb-04 Page A Overview 1) Specifications and Applications 2) Operational Overview 3) Block Diagram.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
Parity Quality Beam (PQB) Study Injector Group September 2008.
DEPT OF MODERN PHYSICS, USTC Electronics System of MC IHEP, Beijing ___________________________________________ Muon Group, USTC, Hefei.
Sp09 CMPEN 411 L18 S.1 CMPEN 411 VLSI Digital Circuits Spring 2009 Lecture 16: Static Sequential Circuits [Adapted from Rabaey’s Digital Integrated Circuits,
Oscillator stability & ASE Reduction
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting June 5, 2001.
Workshop for advanced THz and Compton X-ray generation
#3205 Summary 6 th Nov 2012 Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
575 Features Overview. Existing Features ► System Modes ► Independent Channel Modes ► System Gating ► Channel Gating ► External Trigger ► Channel Multiplexing.
Data Acquisition System for NPDGamma Nadia Fomin April 4 th, 2008 Bon Appetit!
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
Seth Schwiethale James Crosetto James Ellison.  square pulse of ms, repeats every 20 ms  It is the same for both steering and acceleration 
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
Module 8 Tutorial  An 8086 system is used for controlling the speed of a motor. The motor can operate at 5 different speeds (1- 5).  The speed.
Date of download: 9/18/2016 Copyright © 2016 SPIE. All rights reserved. Schematic of the OPCPA laser system at Sandia National Laboratories. A stretched.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
BC2 Commissioning Parameters
UITF MPS system requirements
Electrical System P09045: Membrane Characterization Test Stand
SYEN 3330 Digital Systems Chapter 7 – Part 1 SYEN 3330 Digital Systems.
Kansas Light Source Laser System J. R. Macdonald Laboratory
Beam Beam electronics Block diagram disc gated disc gate disc gated
UITF Conduct of Operations Review
FAN3180 Single 2-A Gate Driver with 3.3-V 15-mA LDO
Presentation transcript:

Chopper wheel Rotates at 100 Hz and contains a timing photodiode to signal position on each turn. A slot cut in the disc passes a 130  s laser pulse train every turn. Stanford DG535 (Repetition Rate) This unit sets the macropulse repetition rate by inhibiting the 100 Hz timing signal from the chopper wheel Quantum Composer 8-Channel timing unit This unit is triggered by the Repetition Rate DG535, and takes a clock input from the MHz RF reference. On triggering, it waits for the next RF clock cycle, then cascades trigger signals to the Mechanical Shutter (selecting a specific macropulse), and to the Macropulse Length DG535 to set the macropulse length. Additional trigger signals are provided to the rack room and the TW laser. Mechanical Shutter The mechanical shutter selects specific macropulses from the 100 Hz macropulse train to define the 1, 2, 5, 10 or 20 Hz repetition rate Stanford DG535 (Macropulse Length) This unit provides trigger to the Pockels cell driver to define the macropulse length AΠBAΠB

Quantum Composers Timing Unit Settings Sync.ChannelWidthDelayPolOutputMode Wait PulsesDriving Alternative for ‘other’ chopper sensor location T0T0 'A'140 us20.31 ms Act highTTL/CMOSNormal0Main RF trigger (via roof feed-through channel #1) ‘A’'B'4 ms24.0 ms Act highTTL/CMOSNormal0Mechanical shutter4.5 ms / 4.0 ms T0T0 'C'150 us0 Act highTTL/CMOSNormal0Not used (suspected faulty) T0T0 'D'150 us26.37 ms * Act highTTL/CMOSNormal0Trigger to DG ms / 150  s T0T0 'E'100 us26.41 ms ** Act highTTL/CMOSNormal0Feed to rack room (via #7 on roof feed-thru box) T0T0 'F'100 us7.01 ms Act highTTL/CMOSNormal0EMMA RF System Trigger T0T0 'G'10 us20.00 ms Act highTTL/CMOSNormal0BPM Trigger (via roof feed-through channel #2) T0T0 'H'95 ms1.1 ms Act highTTL/CMOSNormal0Macropulse repetition rate (setting for 10 Hz) Gate: Mode (Chan Menu) – Level V Clock:Source Ext. w/PLL; Rate MHz; Level V; Ref. out - To pulse; Ext. Opt. - Force OFF; T 0 clock rate Trig: Mode – Triggered; Level – 1.00 V; Edge – Rising Edge * = Value changed from ms to ms on May 23 following shutdown work. ** = Value changed from ms to ms (noted on 28/8/12 – not sure when change was actually made) New timing settings established to drive EMMA RF correctly using timing sensor located on the left-hand side of the chopper wheel, set

DG535 Unit Settings: Macro Pulse Length (Pockels Cell) ChannelDelayDriving 'A'A = T Trigger onset delay 'B'B = A Macro Pulse length (example shows 10 ns) 'C'C = A – 'D'D = C Trigger to Pulse picker Pockels cell T0T0 Trigger to PC for PCO camera or streak camera Trig: Ext.; Threshold = V; Slope (+/-) = +; Trigger term = High Z Output: AB; AB & -AB Loads = High Z; AB: TTL Values correct, as of April 21 st, 2015 Channel ‘A’ adjusted slightly to capture beam following shutdown work

DG535 Unit Settings: Burst Generator Settings ChannelDelayDriving 'A'A = T 'B'B = A 'C'C = T 'D'D = C T0T0 Trig: Ext.; Threshold = V; Slope (+/-) = +; Trigger term = High Z Output: AB; AB & -AB Loads = High Z; AB: TTL Values correct, as of March 20 th, 2015