Project Name IN-PROCESS REVIEW MEETING

Slides:



Advertisements
Similar presentations
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Advertisements

Module 8: Government Required Reports
SWE Introduction to Software Engineering
MSD 11209: WOCCS: Long-Range RF Module Meet the Team Danelle Grabski- Electrical Engineering Jacky Ng- Electrical Engineering Josh Doolin- Electrical.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Spring 2007 Team : CSE 498, Collaborative Design.
Project Support Function PM Planning Organizing Staffing Monitoring Controlling and Leading Project Support Functions Monitoring Controlling.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management “…a huge topic.” See Part 6, “Management”, Chaps.
COMP4710 Senior Design Richard Chapman. Outline What is Senior Design? What is Senior Design? Course Structure Course Structure End of Cycle Binder End.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Introduction Project Management Erol İnelmen Makro.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Release Management and Rollout A very brief overview.
Other Planning Processes: Final Planning Touches
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Proposed MITHI Concept Paper
(8/21/2015) Program Independent Assessment (PIA) Joe Kusick SAS Senior Manager, Program Independent Assessment Chairman, Raytheon EVMS Council.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
Project Management Application in Health IT Farrokh Alemi, Ph.D. Geff Garnhart, PMP.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
A Good Beginning Makes For A Good Ending Old English Proverb.
Steering Committee Meeting For Period Ending: > Presented By: > Date: > >
Project Status Report Presenter Name Presentation Date.
Supply Chain Integration February 24, 2014 Jason Cox Chief Technical Officer Cox Machine, Inc.
Seminar 3 IT511: Information Systems Project Management Seminar 3 IT511: Information Systems Project Management Instructor Chad McAllister, PhD.
-1- Project Name Project Name Weekly Project Report Project Manager : __________________ Date : ___________________.
Project Name POST-MORTEM MEETING
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Manager Core Competencies The core competency.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
Project Demonstration Template Computer Science University of Birmingham.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
Test/Support Synergy Forest Weld Director of Quality Assurance and Support Arxan Technologies, Inc.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Quotations Support Calls Engineer Scheduling Engineer Location Maintenance Contracts Web Access Reporting INTEGRATION About SD Pro Customers Contact Us.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
Project Manager:PATS Project Manager Estimator:Peter Project Manager Start Date:1/1/2010 PATS Software PATS Project Team.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Commonwealth of Massachusetts Executive Office of Health and Human Services EOHHS Infrastructure Consolidation and Rationalization October 2008.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Project Schedule & Gantt Chart Unit 4 – Virtual Project.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
* Project Name Progress Report 2 Date Presented by:
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Fall 2010 Software Planning Guidelines.
A six-pack of major RFP problems
Project Management.
Software and Systems Integration
Meeting Agenda Go over A.L. Play with apparatus
technical-service/ technical-service/
Systems Engineering Project Management
[Project Name] STEERING COMMITTEE UPDATE [Date]
[Project Name] Project Report
FAE Group Annual Meeting 2015
Project Management Methodology Documentation Chart
Project management Lecture 9
Program Status (Chart 1)
[Project Name] Project Report
Project Management Process Groups
*Tentative and subject to change*
CSE 498, Collaborative Design
PPT3: Project planning and management
10.7 Tests Concerning Differences Between Means for Small Samples
Technical Communication
Information technology
Meeting Agenda Raw materials all here yet? – Piotr, Meka, Shayne
Presentation transcript:

Project Name IN-PROCESS REVIEW MEETING It is not necessary to generate new viewgraphs for each review. Use of “red-line” mark-ups is encouraged Project Name IN-PROCESS REVIEW MEETING Project Manager: __________________ Date: ___________________

In-Process Review Agenda TOPIC Action Items from Previous Review Project Performance versus Schedule Project Organization Technical Performance Schedule Performance Issues and Concerns Risk Analysis Lessons Learned Concluding Comments The agenda chart provides an overview of the project status along with relevant opinions and details. The basic thought process for this agenda organization is that the project plan has been discussed, evaluated, and approved at the kickoff meeting. The plan, once approved, is the presumed path to success. This review consists of four elements: PLAN, TRACK, ANALYSIS OF VARIANCE (including Issues and Concerns), and REPORT.

Action Items from Previous Review Include all open action items from previous reviews or the Kickoff Review and any closed action items from the last review.

Project Performance Status Trend Technical (Past/Present/Future) Schedule (Past/Present/Future) Cost (Past/Present/Future) Customer Satisfaction (Past/Present/Future) This chart is designed to capture project status in technical, schedule, cost, and customer satisfaction. In the actual report, “Status/Trend” are each replaced by colors: Red, Yellow, Green. “Status” reflects the current condition, “trend” is the expected status at the time of the next review. Color codes are: RED - signifies a significant issue, concern, problem, or failure to meet performance requirements. YELLOW - is a cautionary sign, a potential significant issue. GREEN - indicates things are proceeding according to the plan. Include comments supporting the bullet colors.

Project Organization (example) Project Manager _______________ Contracts _____________ Procurement _____________ QA & Test System Engineer _____________ _______________ Project Controls _____________ Chief System Engineer _______________ Software Engineer Hardware Engineer Integration Test Etc. _____________ _____________ _____________ _____________ _____________ The organization chart allows us to evaluate the experience, training, and responsibility levels of the project team. It also allows us to make some organizational common sense tests: Does QA report outside the project? Is the system engineering function represented? Is there a Project Controls function? Finance? Contracts? Procurement and subcontracts? Are there staffing issues? If so, be specific. What is the issue or the position to be filled? Who has the responsibility for completing the action, and what is the estimated completion date (ECD) for closure? Staffing Need Actionee ECD ACD

Project Schedule Gantt Chart Example A summary Gantt chart should be included in the presentation package showing actual performance against plan. Schedule slips from the plan must be clearly shown.

FOR EACH STEP INCLUDE: ACTION, ACTIONEE, ECD, ACD (WHAT, WHO, WHEN) Issues & Concerns Concern: (provide 2 sentence explanation): ____________________________________ ____________________________________ Resolution Plan: Concerns of the project team regarding the project’s success. These charts, Issues and Concerns, are designed to facilitate the free expression of any significant concerns. State the concern or issue in the top section and then state the resolution steps appropriate to resolve the concern. For each step, identify what the step is, who is responsible for the action, and when the step will be completed (the Estimated Completion Date, or ECD). When the step is completed add the Actual Completion Date (ACD). Leave the ECD so we can determine how close the ACD matches the ECD. For a typical project, the Project Manager might have two to four significant issues or concerns. Members of the project team who may also present (the Chief Engineer, the Software Manager, etc.) may have one or two issues and concerns. Each issue and concern must be listed on a separate page. FOR EACH STEP INCLUDE: ACTION, ACTIONEE, ECD, ACD (WHAT, WHO, WHEN)

Lessons Learned Since Last Review What did we do well? What did we do poorly? Where were we lucky? Where were we unlucky? If we were to do it again what would we do differently? Lessons Learned are an important part of the review and the final project report. Do not include the lessons learned from the previous report. The charts become the input for the lessons learned report required at project completion. Note: Do not include old/previous Lessons Learned on this sheet.

Concluding Comments This chart allows the project team to comment on any topic not already covered in the review.