Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, 2005. Sn. Environmental Specialist. Lasse.

Slides:



Advertisements
Similar presentations
The World Banks Carbon Finance Business: Joint Implementation Experience Benoît Bosquet, World Bank Carbon Finance Business UNFCCC JI Workshop Moscow,
Advertisements

Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
Financing ERPAs: A Case Study of the Nova Gerar Landfill Gas Project Bruce Usher, CEO EcoSecurities Group Limited Carbon Finance Risk Mitigation Workshop.
UNFCCC Secretariat SBL submission options Landfill sector: methane destruction + energy generation Karla Solís Team Lead Regional Collaboration Centre.
Cross-Border Infrastructure: A Toolkit Clean Development Mechanism ( CDM ) Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Florida Department of Environmental Protection Offset Protocols and Florida’s Greenhouse Gas Cap-and-Trade Program Kelly Stevens Meteorologist Division.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka Presented.
CDM PoA Development Case Study: Morocco Municipal Solid Waste.
Emissions Trading (Cap and Trade) Kate Macauley. 1. Economics of emissions trading 2. Overview of the EU Emissions Trading Scheme (ETS)
Group H Carbon Credits Business Case. About Carbon Credits Carbon credits are certificates issued to countries that reduce their GHG emissions One credit.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
Overview of BioCF ERPA terms December 15, 2005 The World Bank, Washington, DC.
CARBON CREDITS.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Onyx Gas Capture and Flaring ProjectOnyx Gas Capture and Flaring Project Alexandria, Egypt Amr Abdel-Aziz,
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Carbon Finance Instrument to Improve Coastal Zone Solid Waste Management MEDITERRANEAN WORKSHOP ON INTEGRATED COASTAL ZONE MANAGEMENT (ICZM) POLICY Alghero,
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Carbon markets An international tool for cost-effective GHG mitigation.
SESSION 3: Climate Change Financing Opportunities.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Harnessing the carbon market to sustain ecosystems and alleviate poverty BioCarbon Fund Overview BioCarbon Fund Overview BioCF Project Training Seminar.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
Carbon Finance at the World Bank Workshop on Large Project Finance Maputo, Mozambique 31 May & June 1, 2007 Antonio Nucifora, Senior Economist, World Bank.
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
....innovating clean energy solutions…. Glenn S. Hodes UNEP Risø Center CARBON FINANCE.
Power Sao Paulo, December 7 th, 2006 International CDM Market Dr. Manuel Fuentes.
Carbon credits - origination to commercialisation© 2006 EcoSecurities Group plc CleanTech and Carbon in the Pacific Northwest Seattle, WA November 8, 2007.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
3 – Clean Development Mechanism Introduction to Climate Change Wim Maaskant BGP Engineers – The Netherlands
Implementation of the Kyoto Protocol: what does it mean for bioenergy and C sequestration? Implementation of the Kyoto Protocol: what does it mean for.
Harnessing the carbon market to sustain ecosystems and alleviate poverty BioCarbon Fund Overview BioCarbon Fund Overview BioCF Project Training Seminar.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
TRANSACTION TYPES and FINANCING Architecture of CDM transactions By Steve Thorne SouthSouthNorth Addis Ababa 21 st October 2003.
Innovative Sources of Funding for SLM:
Carbon Finance Strategy the World Bank Carbon Finance Strategy the World Bank CHARLES CORMIER Sept 2005.
Non-CO 2 Greenhouse Gas Offset Projects: Basic Considerations Karl H. Schultz Climate Mitigation Works International LLC Panel Three: Design Issues RGGI.
CD4CDM National Workshop, Accra, Ghana February 2006 Glenn S. Hodes UNEP Risø Center CARBON FINANCE.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
Controlling Methane Emissions from Landfills in the Developing Countries Seminar on Climate Change Impacts on Bangladesh: Global Responsibilities Vancouver,
EcoSecurities Group Ltd CONFIDENTIAL Carbon Finance and Oil and Gas Context Paul Soffe – Senior Adviser Africa Oil and Gas Conference April 2004.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
THE WORLD BANK World Bank Experience in Landfill Gas and Prospects for Indonesia Dr. John Morton Environmental Specialist The World Bank East Asia and.
PELANGI Solid-Waste Management and Financing: With Special Focus on CDM Agus P. Sari Managing Director Pelangi – Ecosecurities Alliance on Climate and.
Progress with Portfolio Development Prototype Carbon Fund July 2002.
El Gallo Hydroelectricity Project PDD Analysis
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Alain David, P.Eng. National Office of Pollution Prevention Environment.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
Portfolio of Biomass Projects in the Czech Republic David Viduna BTG Central Europe s.r.o. San Salvador, March 28, 2003.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Challenges and Opportunities for Addressing Global Climate Change February 2006.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Fiji Islands Promoting CDM in Pacific Island Countries- Experiences and lessons from UNEP (Manasa Katonivualiku) CDM Project Coordinator, Climate Change.
Seite 1 Seite Seite 1 CDM in Egypt Potentials and Projects Presentation by Dr. Paul H. Suding, GTZ MENA Carbon Forum 2009 Cairo,
John Davis Mojave Desert and Mountain Recycling Authority.
How to Develop Landfill Gas CDM Projects with Local Municipal Authorities? Kok Kee Chow, Managing Director, Sustainable Technology Resource Centre STREC.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology
Presentation transcript:

Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, Sn. Environmental Specialist. Lasse Ringius. World Bank

Overview of Presentation - Kyoto Protocol/CDM - Baseline and monitoring methodologies - CDM project cycle - Overview of global carbon market

Kyoto Protocol: Industrial countries must reduce GHG emissions by 5.2% compared to 1990 levels in the period

Current Kyoto gaps

Annex B Non-Annex B How to close the gap? Joint Imple- mentation Emissions Allowance Market Clean Development Mechanism

Clean Development Mechanism (CDM) Project-based mechanism Projects in developing countries earn “credits” for reducing additional CO 2, CH 4, N 2 O emissions Verified GHG emission reductions have become an internationally tradable commodity  Seller: Project investor  Buyer: OECD governments and companies facing GHG mitigation targets under the Kyoto Protocol

World Bank Carbon Finance Funds Italian Carbon Fund. $15 million (open to Italian participation). Italian Multi-shareholder. Multipurpose. Netherlands Clean Development Facility. $180 million. Netherlands Ministry of Environment. CDM energy projects. BioCarbon Fund. $46.3 million (open). Multi-shareholder. JI and CDM LULUCF projects. Community Development Carbon Fund. $128.6 million (closed). Multi-shareholder. Small-scale CDM energy projects. Prototype Carbon Fund. $180 million (closed). Multi-shareholder. Multi-purpose. Total funds under management: ~ US$ 875 mill. Netherlands ECF Netherlands European Carbon Facility. $60 million with IFC. Netherlands Ministry of Economic Affairs. JI projects. Spanish CF Spanish Carbon Fund. $200 million (open to Spanish participation). Spanish Multi-shareholder. Multipurpose. Danish CF Danish Carbon Fund. $64 million (open to Danish participation). Danish Multi-shareholder. Multipurpose.

How Indonesia can benefit from the CDM Electricity $$ Power Purchase Agreement Certified Emission Reductions $$ Emission Reduction Purchase Agreement LFG to Energy Project

Organic methane (CH 4 ) Forms when organic material decomposes under anaerobic conditions Avoidance of CH 4 emissions through:  Prevention  Capture & Combustion When CH 4 is avoided, CO 2 is emitted But: CO 2 originating from the decay of organic material is considered neutral to the atmosphere

ER estimation The amount of credits that can be earned from LFG projects is dependant upon several factors:  Amount of waste;  Waste composition (organic fraction);  Waste management practices (e.g landfill covering, compacting of waste, depth of landfill);  Moisture;  Age of the landfill site;  Efficiency of LFG collection system; and  Amount of LFG collection mandated by law

A back-of-the-envelope-calculation* Methane generation potential of 1 ton of waste ranges from less than 100 to more than 200 m 3, depending on the waste composition (IPCC Good practice guidelines 1996) With weight of methane equaling kg/m 3 : 150m 3 of CH 4 = 0.1 tons of CH 4 At a collection efficiency of 70%, 0.07 tons of CH 4 can be recovered Multiplied with the GWP for CH 4 (i.e., 21), one ton of waste yields 1.47 t CO 2 e emission reductions (ERs) * based on gas yield methodology

Example: Carbon revenues from LFG recovery and methane destruction 1 mio. tons of waste 6 mio. m 3 LFG/yr 2,140 ton CH 4 /yr 1,500 ton CH 4 recovered/yr 31,500 tCO 2 eUS$ 140,000/yr * Underlying assumptions: - 1 m 3 LFG contains 357 g methane - 70% collection efficiency - US$ 4.50/t CO2e

Opportunities in the MSW sector CH 4 is 21 times more potent than CO 2. The “methane kick” significantly improves project economics. Projects which reduce CO 2 or CH 4 emissions against the baseline are eligible, e.g.  Landfill gas recovery and utilization  Composting  Biodigestion

LFG methodologies

Approved LFG methodologies ProjectReferencePresented by Salvador da Bahia (VEGA), Brazil AM0002ICF Consulting Durban, Africa del Sur AM0010PCF Nova Gerar (NCDF) AM0003NCDF / Ecosecurities Onyx, BrazilAM0011 CERUPT ABIL, IndiaAM0012PCF / IDFC Biodigester

Elements of consolidated LFG methodology ACM0001 Builds on approved methodologies for landfill projects Does not replace previously approved methodologies Applicable to both flaring-only and gas utilization projects

Elements of ACM Baseline Baseline is release of gas to the atmosphere, considering gas captured for other reasons (safety, regulations, contractual requirements) If no regulations apply, an Adjustment Factor shall be used and justified based on project context Approved additionality tool applies  Step 2: Investment analysis: For flaring projects: a straightforward investment economics test For electricity generation projects: compare levelized electricity costs with least cost option in the system or show that IRR is below standard returns in the market.  Step 4: Common practice test can feed into Adjustment Factor

Elements of ACM Monitoring LFG projects allow for direct monitoring of emission reductions following the simple rationale that all methane captured would have been released in the absence of the project ER = (methane captured – x%) * 21 with x = Regulations or Adjustment Factor Monitoring variables include: LFG recovered / flared through flow meters, methane content of LFG (continuous gas analyzer or periodic samples), flare efficiency, flare availability, electricity generation, etc. Furthermore: monitoring of regulations and adjustment of baseline scenario if regulations tighten

Which methodology to choose? MethodologyElectricity generation? Baseline Salvador da Bahia (VEGA) noMandated collection in concession contract (20% eff) Durban (PCF) yesExisting safety curtain wells (7% eff., declining) + monitoring of regulations Nova Gerar (NCDF) yes, but not credited Collection efficiency in bidding documents + safety margin (20%) Onyx (CERUPT)yes, but on-site use only Coll. mandated by law or economically attractive (0%) Consolidated Methodology yesExisting Regulations or Adjustment Factor + monitoring of regulations

MSW Project Examples in the Bank Durban LFG-to-energy, RSAA. Sanghvi Nova Gerar LFG-to-energy, BrazilW. Kornexl Shanghai LFG-to-energy, ChinaM. Anderson Mexico LFG-to-Energy UmbrellaW. Vergara Teheran LFG-to-Energy, IranA. Rotman Olivarria LFG capture and flaring, Argentina H. Terraza Liepaja Energy Cell, LatviaA. Halldin ABIL Biodigester, IndiaD. Hoornweg