TGm Power Management DG Discussion Mar. 10, 19:00-22:00 2009-03-09IEEE 802.16m-09/0015r1.

Slides:



Advertisements
Similar presentations
November 13, 2003IEEE Albuquerque Plenary Session 1 Moving Forward Robert D.Love LAN Connect Consultants C /113.
Advertisements

GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
M2M Study Report: Status Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0008 Date Submitted:
1 Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0029 Date Submitted:
With Mr. Tyler $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
1 Sleep Cycle Configuration for Sleep Mode Operation Document Number: IEEE C802.16m-09/0972 Date Submitted: 2009/04/27 Source: Chung-Hsien Hsu, Yih-Shen.
Report – SeON WG GISFI #8 GISFI # 08, Mar 26-28, 2012, Patna Chair: Parag Pruthi (NIKSUN) Chair-Delegate: Ashutosh Dutta (NIKSUN) Vice-Chair: Debabrata.
UL Control Drafting Group Report Document Number: IEEE C80216m/09_0376r1 Date Submitted: Source: Jong-Kae (JK) Fwu TGm UL Control Drafting Group.
Ajay Rajkumar, Chair Joint Opening Plenary IEEE Session #7 Media Independent Handover Services Atlanta, Georgia Ajay Rajkumar
Proposed TGm Plans for Upcoming Sessions & Work Plan Updates IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1646.
NATIONAL INFORMATION AND COMMUNICATIONS TECHNOLOGY AUTHORITY In-country Preparatory Meeting 4 th June 2015, NICTA HQ WRC-15 Issues WRC 15: PNG Preparatory.
LBS Drafting Group Session #63 Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/2136 Date Submitted:
1 E-MBS DG Opening Report Document Number: IEEE C80216m-09/2121 Date Submitted: Source: Kaushik Josiam, Yan-Xiu Zheng
Relay DG Report (for TGm Closing Report) IEEE Presentation Submission Template (Rev. 9) Document Number: C80216m-09_2134 Date Submitted:
Ajay Rajkumar, Chair WG Joint Opening Plenary IEEE Session #12 M edia Independent Handover Services Hawaii, USA Ajay Rajkumar
IEEE n-11/ Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0002.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
Welcome to the Young Statisticians Writing Webinar 1 We will start at 4pm GMT Your chair is Sofya Gorelova Statistician at HMRC and Young Statisticians.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the.
Synchronization Drafting Group Schedule Document Number: IEEE C802.16m-09/0379 Date Submitted: Source: Paul Cheng
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
LBS Drafting Group Session #63.5 Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/2209 Date Submitted:
802.16m Closing Report September 16, 2010 St. Petersburg, Russia Session # IEEE m-10/0030r1.
DC RG Report Document Number: IEEE C802.16n-11/0088 Date Submitted: Source: Ming-Tuo Zhou, Sungcheol Chang DC RG.
1 Security Drafting Group Session #62 Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1650 Date Submitted:
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Report January 18, 2016 doc.: /0132r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 18 January 2016 Authors:
Minutes Document March 2006 Terry Cole, AMDSlide Editor’s Best Practices Terry Cole, AMD WG Technical Editor & Simon Barber, Devicescape.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 E-MBS DG Report (for TGm Closing) Document Number: IEEE C80216m-09/2148 Date Submitted: Source: Kaushik Josiam, Yan-Xiu Zheng
Value in Webinars ID: Andrea Hildreth Client: Walden University, Capstone Project.
With Mr. Tyler $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission November, 2007 Slide 1 EC Update on LMSC Policy and Procedures Date: November 12 th, 2007 Author:
802.16m Opening Report May 10, 2010 Bangalore, India Session # IEEE m-10/0013r1.
802.16m Closing Report July 16, 2009 San Francisco, CA Session # IEEE m-09/0035r1.
Doc.: IEEE /0509r3 Submission May 2008 Vinko Erceg, BroadcomSlide 1 LB124 PHY Ad Hoc Comment Resolution Status Date: Authors:
TG 1 March Session Closing Report
802.16m Interference Mitigation DG Opening Report
Opening report of Connection Management and QoS DG
Project Planning Committee (PPC): Report
IEEE Presentation Submission Template (Rev. 9) Document Number:
HO DG Meeting Minutes Document Number: IEEE S802.16m-09/0752
Sept 3, 2009 Jeju Island, Korea Session #63
July Meeting Report Date: Author: July 2010 July 2010
May 10, 2010 Bangalore, India Session #67
July 13, 2009 San Francisco, CA Session #62
July 13, 2009 San Francisco, CA Session #62
Aug 31, 2009 Jeju Island, Korea Session #63
September 13, 2010 St. Petersburg, Russia Session #69
March 9, 2009 Vancouver, BC, CA Session #60
March 9, 2009 Vancouver, BC, CA Session #60
IEEE P802.22b May 2014 Plan & Report
May 4, 2009 Cairo, Egypt Session #61
Options for TGaa Proposal Selection Procedures
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Orientation and Title I Info
TGn Chair’s Status Update
Session # n GRIDMAN TG Closing Report
November 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: f Task Group Closing Report for.
Report from Network Entry and Ranging Ad Hoc Group
November 11, 2010 Dallas, Tx Session #70
November 8, 2010 Dallas, Tx Session #70
IEEE P802.22b May 2014 Plan & Report
July 12, 2010 San Diego, USA Session #68
EC Update on LMSC Policy and Procedures
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: March 2014 closing report Date Submitted: March.
IEEE MEDIA INDEPENDENT HANDOVER
IEEE aj May Closing Report
Presentation transcript:

TGm Power Management DG Discussion Mar. 10, 19:00-22: IEEE m-09/0015r1

Sleep Mode (2 hours) – 11 contributions were presented and discussed. Contribution list is in attachment. One straw poll on variable sleep cycle: the 1 st option below will be used as the baseline in 1 st draft, and the 2 nd option will be in bracket text. – Sleep cycle is doubled every new sleep cycle: 9 – Sleep window is doubled every new sleep cycle : 0 – Sleep Mode draft AWD outline was decided. See attachment. – Initial baseline text was already sent out. Member are welcome to send your cmt to the DG chair. DG chair will update the baseline text considering the cmts. Idle Mode (1 hours) – 8 contributions were presented and discussed. Contribution list is in attachment. – Idle Mode outline and baseline was decided to be same as the latest version of c80216m-09_

Future plan (~20 minutes) – DG Chair will try to minimize number of conference calls (CC). If needed, the following time in Beijing time (GMT +8:00) will be selected for CC and rotated each time. 9:00 AM to 11:00AM 9:00 PM to 11:00PM – The schedule of first round drafting was decided: First draft: – DG chair will address the cmts (if any, in the following two days) from DG members into the first draft and send out to DG list ( list is to be built by end of session #60) on Mar. 18 AoE; Reply to the 1 st draft: – DG members are welcome to send your modifications and cmts to the DG list by Mar. 24 AoE; – During the time Mar. 18 to Mar. 24, offline harmonization is encouraged to accelerate the drafting process. Conference call: – The first conference call is scheduled on Mar.27, 9:00 AM to 11:00AM, Beijing time. Meeting invitation will be sent out before the CC. – The cmts on the 1 st draft will be discussed during the CC. – The future working timeline will also be discussed during the CC, according to the progress we get from the 1 st round.