Omniran-13-0058-01-ecsg 1 OmniRAN EC SG August 7 th, 2013 Conference Call 2013-08-06 Max Riegel (OmniRAN SG Chair)

Slides:



Advertisements
Similar presentations
Omniran Wireless SDN BoF March 20, 2014, Beijing, China Acting chair: Max Riegel, NSN.
Advertisements

Omniran ecsg 1 OmniRAN EC SG October 10 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG September 27 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Omniran TG 1 IEEE OmniRAN TG December 16 th, 2014 Conference Call Max Riegel, Nokia Networks (OmniRAN TG Chair)
Privecsg ecsg 1 IEEE 802 EC Privacy Recommendation SG 802 Plenary Meeting March 9-13, 2015 Juan Carlos Zuniga, InterDigital Labs (EC SG Chair)
Omniran TG 1 IEEE OmniRAN TG February 10 th, 2015 Conference Call Max Riegel, Nokia Networks (OmniRAN TG Chair)
Omniran ecsg 1 OmniRAN EC SG December 11 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG October 4 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Doc.: IEEE /1005r0 Agenda September 2015 Jim Lansford, Chair (Qualcomm)Slide 1 WNG SC Agenda Date: Authors:
Omniran TG 1 IEEE OmniRAN TG September 2014 F2F Meeting Max Riegel, Nokia Networks (OmniRAN TG Chair)
Omniran ecsg 1 OmniRAN EC SG October 4 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda January 2013, Vancouver, BC Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG October 10 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides September 2013, York, UK Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG June 20 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda February 28 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Privecsg ecsg 1 IEEE 802 EC Privacy Recommendation Study Group September 2 nd, 2015, Conference Call Juan Carlos Zuniga, InterDigital Labs (EC.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides September 2013, Nanjing, China Michael Montemurro (Blackberry) acting on behalf.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides March 2014, Beijing, China EC SG Chair Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides September 2013, Nanjing, China Michael Montemurro (BlackBerry) acting on behalf.
Omniran TG 1 IEEE OmniRAN TG March 2015 F2F Meeting Max Riegel, Nokia Networks (OmniRAN TG Chair)
Privecsg ecsg 1 IEEE 802 EC Privacy Recommendation Study Group October 21 st, 2015, Conference Call Juan Carlos Zuniga, InterDigital Labs (EC.
Omniran ecsg 1 OmniRAN EC SG May 2 nd, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda February 28 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides July 2013, Geneva, CH Max Riegel (OmniRAN SG Chair)
Doc.: IEEE /0114r1 Agenda January 2013 Clint Chaplin, Chair (Samsung)Slide 1 WNG SC Agenda Date: Authors:
Omniran TG 1 IEEE OmniRAN TG April 29 th, 2014 Conference Call Max Riegel, NSN (OmniRAN TG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides March 2014, Beijing, China EC SG Chair Max Riegel, NSN.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel (ECSG Chair)
Omniran ecsg 1 OmniRAN EC SG February 26 th, 2014 Conference Call Max Riegel (OmniRAN SG Chair)
Omniran TG 1 IEEE OmniRAN TG November 2014 F2F Meeting Max Riegel, Nokia Networks (OmniRAN TG Chair)
Doc.: IEEE /0491r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /1515r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: January 2016.
Doc.: IEEE /0217r7 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: May 2016.
Omniran TG 1 IEEE OmniRAN TG April 16 th, 2015 Conference Call Max Riegel, Nokia Networks (TG Chair)
Doc.: IEEE /1230r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: November 2015.
Omniran TG 1 IEEE OmniRAN TG September 29 th, 2015 Conference Call Max Riegel, Nokia Networks (TG Chair)
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides September 2013, York, UK Max Riegel (OmniRAN SG Chair)
Omniran TG 1 IEEE OmniRAN TG September 4 th, 2014 Conference Call Max Riegel, Nokia Networks (OmniRAN TG Chair)
IEEE OmniRAN TG December 13th , 2016 Conference Call
IEEE OmniRAN TG November 2016 F2F Meeting San Antonio, TX
OmniRAN EC SG Agenda April11th, 2013 Conference Call
OmniRAN EC SG June 20th, 2013 Conference Call
IEEE OmniRAN TG October 25th , 2016 Conference Call
OmniRAN EC SG May 2nd, 2013 Conference Call
IEEE OmniRAN TG September 2016 F2F Ad-hoc York, UK
OmniRAN EC SG August 7th, 2013 Conference Call
IEEE OmniRAN TG December 12th, 2017 Conference Call
OmniRAN EC SG Agenda May 2013, Waikoloa, HI
IEEE OmniRAN TG July 30th , 2018 Conference Call
IEEE OmniRAN TG June 21st, 2016 Conference Call
OmniRAN EC SG Agenda May 2013, Waikoloa, HI
OmniRAN EC SG Agenda April11th, 2013 Conference Call
IEEE OmniRAN TG April 19th , 2016 Conference Call
IEEE OmniRAN TG July 2014 F2F Meeting
IEEE OmniRAN TG February 27th, 2018 Conference Call
IEEE OmniRAN TG April 13th , 2018 Conference Call
WNG SC Agenda Date: Authors: November 2015 July 2013
IEEE OmniRAN TG October 21st, 2014 Conference Call
OmniRAN EC SG Agenda February 28th, 2013 Conference Call
IEEE OmniRAN TG May 31st , 2019 Conference Call
OmniRAN EC SG Agenda March 2013, Orlando, FL
OmniRAN EC SG Agenda and Meeting Slides July 2013, Geneva, CH
IEEE OmniRAN TG October 21st, 2014 Conference Call
Presentation transcript:

omniran ecsg 1 OmniRAN EC SG August 7 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)

omniran ecsg 2 Meeting Wednesday, August 7 th, 2013, 10:00-11:00 AM ET Conference Call: Call-in number: 1-(972) (US) Global numbers: Conference Code: # WebEX Meeting Number: Meeting Password: omniran NNmZiYTEyNjVihttps://nsn.webex.com/nsn/j.php?J= &PW= NNmZiYTEyNjVi

omniran ecsg 3 Guidelines for IEEE-SA Meetings l All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. l Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. l Don’t discuss specific license rates, terms, or conditions. l Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. l Technical considerations remain primary focus l Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. l Don’t discuss the status or substance of ongoing or threatened litigation. l Don’t be silent if inappropriate topics are discussed… do formally object If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. This slide set is available at

omniran ecsg 4 Resources – URLs Link to IEEE Disclosure of Affiliation – Links to IEEE Antitrust Guidelines – guidelines.pdfhttp://standards.ieee.org/resources/antitrust- guidelines.pdf Link to IEEE Code of Ethics – _ethics.htmlhttp:// _ethics.html Link to IEEE Patent Policy – slideset.ppthttp://standards.ieee.org/board/pat/pat- slideset.ppt

omniran ecsg 5 Meeting Etiquette IEEE 802 is a world-wide professional technical organization Meetings are to be conducted in an orderly and professional manner in accordance with the policies and procedures governed by the organization. Individuals are to address the “technical” content of the subject under consideration and refrain from making “personal” comments to or about the presenter.

omniran ecsg 6 LMSC Operations Manual 4.3 Study groups Study group operation Progress of each Study Group shall be presented at the closing Sponsor meeting of each IEEE 802 LMSC plenary session by the appropriate WG, TAG, or ECSG Chair. Study Groups may elect officers other than the Chair, if necessary, and will follow the general operating procedures for WGs specified in the IEEE 802 LMSC WG P&P. Because of the limited time duration of a Study Group, no letter ballots are permitted Voting at study group meetings Any person attending a Study Group meeting may vote on all motions (including recommending approval of a PAR). A vote is carried by 75% of those present and voting “Approve” or “Disapprove.”

omniran ecsg 7 Agenda Wednesday, August 7th, 10:00–11:00am ET Reports –Result of EC closing meeting –Ongoing discussions with –Preparation for York F2F Documentation of OmniRAN EC SG results so far External communications Extension of EC SG plan until Nov ‘13 Meetings and conference calls –York F2F on September 2-6 –Nanjing wireless interim on September –Scheduling of conference calls until November 11 th Agenda for York F2F PAR and 5C template AOB

omniran ecsg 8 Business#1 Call Meeting to Order –Meeting called to order by chair at 10:02am ET Appointment of recording secretary: –Juan Carlos will take notes of the call Roll Call NameAffiliationNameAffiliation Max RiegelNSN Juan Carlos ZunigaInterdigital Antonio de la OlivaUC3M Paul CongdomTALLAC Networks Roger MarksConsensii Walter PienciakIEEE SA

omniran ecsg 9 Business #2 Approval of agenda –approved without objections Reports Geneva meeting minutes completed until end of this week. –Result of EC closing meeting slides were presented by chair explaining outcome of Geneva meeting –Ongoing discussions with initial discussion took place on service selection on further discussion will be invited on mailing list to prepare for the discussions in the York F2F –Preparation for York F2F One meeting on Wednesday, Sept 4 th, for PAR &5C discussions Additionally at least 2 discussions with on gaps (‘ptp links over bridged infrastructure’ and ‘service discovery and selection’)

omniran ecsg 10 Gap Analysis Defining a simplistic network reference model, a couple of use cases were investigated: –3GPP Trusted WLAN Access to EPC TS V ( ) –ZigBee SEP2 Smart Grid Use Case ZigBee docs zse –SDN-based OmniRAN Use Case Initial investigations show missing functionalities in some IEEE 802 specifications regards the investigated use cases. –Sharing of findings in progress with the related working group and investigations will continue directly together with working groups. Main issue was, that it was less than obvious how the pieces of IEEE 802 are fitting together –There is need for better documentation how IEEE 802 protocols work together to create access networks for particular deployments –There is no consistent way how IEEE 802 handles the IEEE 802 information elements going over IP protocols Access Ctrl Interne t R1 R3 Terminal R2

omniran ecsg 11 Topics for Standardization in IEEE 802 Establishing a common approach of specifying ‘external’ control into IEEE 802 technologies would require: –a specification describing the Network Reference Model and listing the DL and PHY control functions required for access networks and SDN To be addressed by a PAR developped by OmniRAN EC SG –a specification on the usage of IP protocols for the transport of IEEE 802 attributes Topic for the joint IEEE 802 – IETF coordination group –specifications of the control attributes for the individual IEEE 802 technologies by their working groups Should go into annex of related specifications to ensure consistency Gaps within IEEE 802 technologies may be discovered but should be addressed by the related IEEE 802 WGs

omniran ecsg 12 OmniRAN EC SG proposes to Develop a PAR and 5C for an IEEE 802 Recommended Practice by Nov ‘13 –Potential title: ‘Network Reference Model and Functional Description of IEEE 802 based Access Networks’ Similar to a ‘Stage 2’ specification Suggest the best home for the project.

omniran ecsg 13 Business #3 Documentation of OmniRAN EC SG results so far –correct liaison slides in #53 (no reference to #54) –create conclusion slides based on #48r4 merging in conclusions in the closing EC plenary on Jul 19 th –provide comprehensive presentation to in Nanjing Chair asking for extension of call by about 30 minutes until 11:30am ET to complete business No objections to extension of call External communication –Group agrees to present OmniRAN results to ONF –Chairs will take care of presentation in electronic meeting –Document#50 approved for presentation to ONF –Roger will introduce OmniRAN EC SG chairs to ONF by Extension of EC SG plan until Nov ‘13 Meetings and conference calls –York F2F on September 2-6 Roger asking for remote participation in the OmniRAN EC SG session Chair offered to take care and provide possibility for remote participation. –Nanjing wireless interim on September –Scheduling of conference calls until November 11 th Meetings as listed on slide 15 agreed. Chair will send out announcements and meeting details.

omniran ecsg 14 OmniRAN Plan and Timeline Initial meeting JanFebMarAprMayJunJul F2F meeting Conf Call Draft Use cases document Call for comments on Use cases document Use cases contributions Classification of functional requirements Gap analysis to existing solutions Socializing of gap analysis Refine scope of EC SG (crisp words) Use cases document finalization Functional requirements within scope of IEEE 802 Jul’15 Mar’21 Potential standardization topics for IEEE 802 Apr’11May’2Jun’20

omniran ecsg 15 OmniRAN Meetings until November 2013 Wed, Aug 7 th, 2013, 10-11am ET: Confcall Wed, Sep 4 th, 2013, F2F Meeting York, UK w/ remote participation Tue, Sep 17 th, am ET/ Nanjing, F2F session w/ remote participation Fri, Sep 27 th, 2013, 09-11am ET: Confcall (Fri, Oct 4 th, 2013, 09-11am ET: Confcall) ??? Thu, Oct 10 th, 2013, 09-11am ET: Confcall Fri, Oct 11 th, 2013, CoB: Submission deadline for PAR to EC list Mon, Nov 11 th, am CT: EC Opening Meeting Dallas F2F

omniran ecsg 16 Business #4 Agenda for York F2F –Approval of minutes ? –Reports discussions with communication with IETF communication with ONF –Content of ‘Stage 2’ document legacy guidance WiMAX NWG Stage 2 initial draft ToC of IEEE 802 ‘Stage 2’ –PAR & 5C texting –AOB PAR and 5C template – content.docxhttps://mentor.ieee.org/omniran/dcn/13/omniran par-5c-table-of- content.docx –Working group section has to be filled with the information of the working group taking over the project –Roger recommends to check that PAR form has not been changed the past months. AOB –no other issues were brought up Adjourn –meeting was adjourned at 11:33am ET