ANL CRAB CAVITY JEFFERSON LAB LHC-CC08 BROOKHAVEN FEBRUARY 25, 2008 LARRY TURLINGTON.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Resource management the basics.. some ideas…  what are resources?  how many engineers does it take to change a light bulb?  the baby-making conundrum.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Dr G Burt (CI), Dr R. Rimmer (Jlab), H. Wang (Jlab) & B. Hall (CI)
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Refurbished Booster RF John Reid December 12, 2012.
Calendar for 2011 Months of the Year with Holidays.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
June 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday Indianapolis Indians.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Twenty Questions Subject: Months of the year By Judy Mutzari.
© Hamilton Trust Keeping Up Term 3 Week 3 Day 3 Objective Count up to find a difference between four-digit numbers.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
NON-ACADEMIC POLICY TIMELINE For February 2010 Policies of great importance or policies that relate to a University regulation may need to go to the BOT.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Half cells for SCRF Cavity - shape ~ 900 mm End cellIntermediate cell.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
26 October 2010IIFC meeting, RRCAT Indian Institutions and Fermilab Collaboration Activities at IUAC Presented by D. Kanjilal Inter-University Accelerator.
Complementary ISTC Projects #3888, 3889p
SC spoke cavity for China-ADS 3~10MeV injector
Diffuser status October 2017
Cost reduction activities in cavity fabrication at MHI
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Year 2 Autumn Term Week 12 Lesson 1
HIE-LINAC status report
Potential Milestones A timeline to finish in one year
NATA Foundation Building Blocks Process
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Year 2 Autumn Term Week 12 Lesson 1
Teacher name August phone: Enter text here.
Circle Chart Template Process Name.
Tropical cyclones movement
February 2007 Note: Source:.
NC Accelerator Structures
MONTHS OF THE YEAR January February April March June May July August
LCLS Vacuum System Plans (July 07)
McDonald’s calendar 2007.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Ward Park Restroom Timeline
JLEIC SRF update SRF team
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

ANL CRAB CAVITY JEFFERSON LAB LHC-CC08 BROOKHAVEN FEBRUARY 25, 2008 LARRY TURLINGTON

ANL CRAB CAVITY

ANL CRAB CAVITY FABRICATION When I saw the drawing for the Crab Cavity I wanted to have a part in the fabrication. After building numerous elliptical, round Cavities I saw a challenge in fabricating this Cavity. I’m a member of the Special Project group within the SRF Division. Personnel used in the fabrication of the Crab Cavity: Myself, Senior Engineering Associate Bob Rimmer, Director of SRF Institute Peter Kneisel, Senior SRF Physicist

ANL CRAB CAVITY FABRICATION Haipeng Wang, Accelerator Engineer-RF Structures Gary Slack, Machinist Steve Manning, Electron Beam Welder Bill Clemens, Electron Beam Welder Jim Henry, Senior Designer You can see we had a lean efficient project. Jefferson Lab has all the facilities and personnel for rapid prototyping and testing.

ANL CRAB CAVITY FABRICATION TIMELINE Received initial design late June 2007 Cost estimate early July 2007 Die and fixture drawings finished late August 2007 Project approved early September 2007 Dimensions and models finalized early October 2007 Drawings revised early October 2007 Die and fixture contract awarded mid October 2007 Nylon male and female Die CNC test pieces received late October 2007

ANL CRAB CAVITY FABRICATION TIMELINE Fabrication dies and fixtures received early November 2007 Parts deep drawn and machined late November 2007 EBW complete early December 2007 Cavity complete December 12, 2007 First Cryostat test Mid December, 2007 Total time for fabrication was a little over three months which included three weeks of modeling time Jefferson Lab’s management provided the necessary support to complete this project in a timely manner

ANL CRAB CAVITY MODELS Received from ANL

ANL CRAB CAVITY DRAWINGS Received from ANL

ANL CRAB CAVITY 3-D MODEL Provided to Machine Shop

ANL CRAB CAVITY 2-D LAYOUTS

ANL CAVITY FORMING DIE

ANL CRAB CAVITY FORMING DIE

ANL CAVITY MACHINING FIXTURE

ANL CRAB CAVITY MACHINING FIXTURE

ANL CRAB CAVITY HALF CELLS AND CELL BLANK

ANL CRAB CAVITY ALUMINUM DUMB BELL For RF Measurements

ANL CRAB CAVITY HALF CELL + BEAM TUBE AND FLANGE

ANL CRAB CAVITY EBW

ANL CRAB CAVITY AFTER EBW

ANL CRAB CAVITY EBW SAMPLE SMOOTH UNDER BEAD 50KV, 42 18”/Minute

ANL CRAB CAVITY SETUP FOR BEAD PULL

ANL CRAB CAVITY FUTURE PLANS & SUMMARY Multi Cell Copper Cavity with End Groups when End Group models are complete. End Groups are planned to be machined from copper plate to reduce fabrication cost associated in developing Dies and Fixtures. Adding stiffeners. This Cavity presented few problems in fabrication and went as planned. We thought the biggest problem would be the 3-D EBW which proved to be no problem at all.

THANK YOU