LAr Week 21-25 Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.

Slides:



Advertisements
Similar presentations
22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.
Advertisements

Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Dec
TOWN OF EDENTON NEW POLICE DEPARTMENT.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
Cryostats for superconducting magnets
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Jan 2016 Solar Lunar Data.
Timeline Roadmap Template
Common Projects Status

News about the WA104 Programme
Flexible lines production and planning
SCHEDULE Nov 1st - Assembly Table Complete
Far Detector Activities Late 2017 – Early 2018
Parts exchange for HL-LHC AUP Q1&Q3
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Average Monthly Temperature and Rainfall


Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Step 3 Step 2 Step 1 Put your text here Put your text here
Jan Sun Mon Tue Wed Thu Fri Sat
2018 Advantage Program Timeline Guide

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Electricity Cost and Use – FY 2016 and FY 2017

Omnibus IV Contract Overview Elieen Emond Contract Specialist
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Teleconference ACS – FREIA 19th June 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
UPPSALA UNIVERSITY_GERSEMI PROJECT
Globus-M2 will be constructed by the end of 2015
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed core price & service spec L1 product milestone 31 Dec 2019
2016 Advantage Program Timeline Guide
Presentation transcript:

LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test Station  Fully operational since Fall 98 Models and Prototypes  Model done in 98  Prototype with dismountable flange done in 99  Insertion model done in Dec 99  TIS pressure test vessel done by Feb 00 (Delivererd to CERN)  Full prototype done in Jan 00 (constructed, under tests) Welding  Welding Plan completed in Dec 99  Agreement with TIS finalised in Dec 99 (SSR written)  Qualification of welder done by Feb00 (Done, TIS tests under way) Production of Feedthrough Units  First feedthrough unit done in May 00  Production of 25 units plus 3 spares by Jun 01  Shipment and testing at CERN: Jan 01 - Jun 01  Installation on cryostat : May 01 - Jul 01  Production of 25 units plus 3 spares by Apr 02  Shipment and testing at CERN: Nov 01 - Apr 01  Installation on cryostat : Mar 02 - May 02 Updated from Jan 00

LAr Week Feb 2000 M. Lefebvre Milestones and Schedule Mechanical Components LowInclusion Steel (Timkin)  P.O. out in Jul 99  Reception started in Oct 99 and resumed in Dec 99 Pin Carriers (Glasseal)  P.O. out in Jun 99  Reception started in Oct 99 (26 received and 24 tested) Cold and Ambient Flanges (EBCO)  P.O. out in Nov 99  Reception in Mar 00 (some have been machined) Funnel Parts and Bolts Rings (SICOM)  P.O. out in Nov 99  Reception completed in Mar 00 (some have been machined) Funnel Assemblies (Specefic Mechanics)  P.O. out in Jan 00 (Done)  Reception to start in Apr 00 Seal and Cuff Rings for Bellows (SICOM)  P.O. out in Nov 99  Reception completed in Feb 00 (March 00) Bellows Assemblies (BOA)  P.O. out in Jan 00 (Done)  Reception to start in Apr 00 Other Components  RF Gasket, Pipe fittings, Insulation, Pigtail restraint, Heaters  Reception to start in Jan 00 Updated from Jan 00

LAr Week Feb 2000 M. Lefebvre Milestones and Schedule Electrical Components Vacuum Cables  RFQ reply from STC and FCI-Berg during fall 99  STC cables passed qualification  FCI-Berg cables qualification finalised Dec99 - Jan 00  Final contract to be awarded in Jan 00 (Done, FCI-Berg)  Reception to start in Apr 00 (March 00) Pigtail Cables (Axon via Orsay)  MOU with Orsay signed in Dec 98  Reception at Orsay started in Nov 99  Reception in Victoria to start in Jan 00 (nothing received) Other Cables (Axon)  RFQ reply received  P.O. out in Jan 00 (Done) Heaters  Design finalised before Apr 00 Updated from Jan 00