SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Control Software Integration German Schumacher T&S Software Lead.
Data Management Subsystem: Data Processing, Calibration and Archive Systems for JWST with implications for HST Gretchen Greene & Perry Greenfield.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Language(s) We plan to develop CALCOS using Python and C Another programming language?
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
DIABETES AND SCIENCE EDUCATION IN AMERICAN INDIAN SCHOOLS: Time Line Lawrence Agodoa, M.D. Director, Office of Minority Health Research Coordination National.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA WFC3 and StarView
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
Constellation Space Transportation Planning Office July 30, 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Development Report Engineering Node August 2006
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA HMEP Grant Program ~ Administrative Requirements NASTTPOAnnualConference.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
SPF MAG Quarterly Report – Feb 2015
GLAST Large Area Telescope
APPLICATIONS Received by SANTE/F: – MDR 7 – IVDR
Mammoth Caves National Park, Kentucky
Sentinel-2 Status Update
WFC3 Pipeline Critical Design Review October 16, 2001
Irregularities in DoRIS
GOMACTech-04 Technical Program Committee Timeline
Epic Roadmap July-Dec 2019 Non Linux Platform Support July-Dec 2018
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Irregularities in DoRIS
2014 Advantage Program Timeline Guide *** Progress Visits ***
Births as per Civil Registration System,
GLAST Large Area Telescope
2017 Advantage Program Timeline Guide
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001

COS Pipeline CDR Agenda – 1 23 July 2001 IntroductionM. McGrath 9:00 Data system SM4D. Swade 9:10 COS File Structure OverviewT. Keyes 9:25 COS Keywords & AssociationsD. Swade 10:00 BREAK 10:15 Science Data Processing J. Rose10:45 DADS ingest and distributionA. Farris11:00 On-the-Fly-Reprocessing (OTFR)M. Swam11:15 COS and StarViewN. Gaffney11:30 Thermal Vac supportR. Henry11:45

COS Pipeline CDR Agenda – 2 24 July 2001 IntroductionM. McGrath 9:00 Coding EnvironmentP. Greenfield 9:05 Coordination with IDTT. Keyes 9:45 CALCOSP. Hodge10:00 Schedule & resources M. McGrath 10:30

COS PIPELINE CDR 24 July 2001 Space Telescope Science Institute 4  Preliminary Design Review held 7 December 2000  PDR Review panel: Kriss (chair), Brownsberger, Kutina, Shaw  18 Request For Actions filed: 13 closed, 5 submitted to panel but not yet officially closed  PDR presentation and RFAs on COS calwg web page  CDR package in same location

COS PIPELINE CDR 24 July 2001 Space Telescope Science Institute 5 COS Pipeline CDR Review Panel Ray Kutina – Chair Tom Brown Ken Brownsberger Paul Goudfrooij Richard Shaw RFA forms available in front of room

COS PIPELINE CDR 24 July 2001 Space Telescope Science Institute 6 – Nov 2001Ops bench component data from Ball – Mar 2002 Ops bench integrated instrument data from Ball – TV-2mo OPUS beta version to IDT – June 2002 (Ball) or Thermal Vac Oct 2002 (GSFC) ? Oct 2002 (GSFC) ? – Dec 2002 ? SMGT – Jan 2004 ?SM4 Lanuch Primary Schedule Drivers

COS Pipeline CDR Agenda – 1 23 July 2001 IntroductionM. McGrath 9:00 Data system SM4D. Swade 9:10 COS File Structure OverviewT. Keyes 9:25 COS Keywords & AssociationsD. Swade 9:45 BREAK10:15 Science Data Processing J. Rose10:45 Data ingest and distributionA. Farris11:00 On-the-Fly-Reprocessing (OTFR)M. Swam11:15 COS and StarViewN. Gaffney11:30 Thermal Vac supportR. Henry11:45

COS Pipeline CDR Agenda – 2 24 July 2001 IntroductionM. McGrath 9:00 Coding EnvironmentP. Greenfield 9:05 Coordination with IDTT. Keyes 9:45 CALCOSP. Hodge10:00 Schedule & resources M. McGrath 10:30