Thomas Jefferson National Accelerator Facility SensL 6-Oct-2008 1CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.

Slides:



Advertisements
Similar presentations
Introduction. November 2002 Good News House Senate.
Advertisements

Overview of the GlueX Tagger and Photon Beamline..
12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
Collimation and tagging instrumentation for the GlueX photon beamline Richard Jones Igor Senderovich, Anne-Marie Carroll University of Connecticut APS/DNP.
June Yong Yang, Nuclear physics site Mentor : Dr. Richard Jones.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Thomas Jefferson National Accelerator Facility Hall D Tagger Magnet Review July 10, 2009 Hall D Tagger Infrastructure Presented by Tim Whitlatch Hall D.
7 Oct 2011 Fall 2011 GlueX Collaboration Meeting Jefferson Lab Newport News, VA 1 Tagger Microscope (Top View) Tagger Magnet Photon Beam e - Beam.
Elton S. Smith University of Virginia October 25, Overview Bremsstrahlung Tagging Spectrometer and Photon Beam Review Elton S. Smith Jefferson Lab.
Accelerator hall of the S- DALINAC – electron energies from 2 to 130 MeV available – cw and pulsed beam operation possible – source for polarized electron.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Jefferson Lab Presentation to Teacher Education Program November 8, 2006 Subatomic Particles: What do we study at Jefferson Lab? Dr. Allison Lung 12 GeV.
Experiment HUGS 2011 – Jefferson Laboratory Hussein Al Ghoul Department Of Physics Florida State University ᵠ.
10 July 2007 Collaboration Meeting 1 Photon physics at JLab: Status and prospects ?? Daniel Sober The Catholic University of America.
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
Where is Williamsburg ? Williamsburg, Virginia A tourist destination for American history – Williamsburg was the capitol of Virginia at the time of the.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Thomas Jefferson National Accelerator Facility
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Overview of the GlueX Tagger and Photon Beamline..
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Swapan.
Thomas Jefferson National Accelerator Facility Page 1 IPR June 26-28, 2007 Tagger microscope R&D: silicon photomultiplier tests integrate pulsesintegrate.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
The GlueX Detector in Hall-D at Jefferson Lab February 16, 2010 David Lawrence, Jefferson Lab (for Curtis A. Meyer, Carnegie Mellon University) July 7,
Jefferson Lab’s Enabling Technologies: A Call for Strategic Planning W. OREN JLAB Engineering Division 9 February 2012.
Hall A Installation Review John J. LeRose 2/25/2009.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Hall-D and the GlueX Experiment at Jefferson Lab Simon Taylor / JLAB Exotic Mesons The 12 GeV Upgrade Hall D GlueX Outlook.
Cost Optimization Models for SRF Linacs
Jefferson Lab High Power Beam Dump Refurbishment
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Renuka Rajput Ghoshal John Hogan Ruben J. Fair Probir K. Ghoshal
Collimation and tagging instrumentation
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Jefferson Lab Reliability Task Force and Initiatives
Alignment of the 12 GeV CEBAF Accelerator
Masses, Forces, Higgs and Gluons
Upgraded Injector Test Facility
Introduction to Jefferson Lab
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
The 12 GeV Jlab Upgrade Project
The 12 GeV Upgrade of the CEBAF Accelerator at Jefferson Lab
View from Lab Management HPS Collaboration Meeting
AC Power for a Super-B Factory
Jefferson Lab Users Group Meeting Start of the 12 GeV Era
SOLID Collaboration Meeting
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Physics Plans for CEBAF at 12 GeV
Presentation transcript:

Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities in existing Halls The JLab 12GeV Upgrade Add 5 cryomodules cryomodules Add arc

Thomas Jefferson National Accelerator Facility SensL 6-Oct JLAB Today N Existing Experimental Halls Hall D Complex A C B JLAB in 2011

Thomas Jefferson National Accelerator Facility SensL 6-Oct Rendering of Hall D Complex – Overhead View Hall D Counting House Cryo Plant Service Building Existing Facilities N

Thomas Jefferson National Accelerator Facility SensL 6-Oct Tagger Area w/ Electron Beam Dump Photon Beam Dump N Hall D Counting House Cryo Plant Service Building Hall D Complex

Thomas Jefferson National Accelerator Facility SensL 6-Oct Truck Access to Hall D Hall D Complex – Site Plan from Drawings Photon Pipe (10” concrete encased pipe) (10” concrete encased pipe) Connection to existing tunnel Tagger Area Hall D Complex Drawings A001 Hall D Collimator Enclosure Electron Beam Dump Truck Access to Tagger Area Service Building (Power Supplies, LCW equipment) Cryogenics Plant Counting House

Thomas Jefferson National Accelerator Facility SensL 6-Oct-2008 Photon beam and experimental area East arc North linac Tagger area Hall D Electron Beam dump Page 6 Top View 75 m Tagger Area Experimental Hall D Electron beam / dump Coherent Bremsstrahlung photon beam Solenoid- Based detector Collimator Photon Beam dump Counting House Radiator PairSpectrometer Collimator Cave