New Audit Structure Illinois Radon Stakeholders Meeting April 24, 2015 Melinda Lewis IEMA Radon Program.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

District Record Keeping Or How to Keep the Department of State Happy and Ohio-Erie Exchanging Students.
District Record Keeping Or How to Keep the Department of State Happy and Ohio-Erie Exchanging Students.
LABORATORY CERTIFICATION & DATA QUALITY MICHAEL W. MILLER, Ph.D. NJ-DEP Office of Quality Assurance
Compliance Monitoring Orientation. Monitoring Components Focus Site Review/Fiscal Monitoring SPAM.
Arizona Department of Homeland Security SAA Site Monitoring 6 th Annual Homeland Security UASI Conference May 2012 May 2012 Governor Janice K. BrewerDirector.
HIPAA Regulations What do you need to know?.
Revenue Audits Returns processed in a “non-judgemental” manner Revenue Audit of selected returns. Objective is to promote voluntary tax compliance. Audit.
Quality Assurance System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
DATABASE INTRO What is it? What does it do? Information Technology University of Massachusetts at Boston ©2009 William Holmes 1.
Quality Assurance/Quality Control Policy
5.2 Personnel Use competent staff Supervise as necessary
Permitting, Fees, and Reports Cal Poly Lecture Tour Ron Scholtz Analog Devices, Inc.
Hallmark Certification. Agenda Ten Year Certification  Term of Certification Background 1.4 year term of certification 2. 8 year term of certification.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Field Analysis Quality Control
TELECARE CORP HIPAA AND THE AMENDMENT PROCESS Updated 11/17/09.
Authorization and Inspection of Cyclotron Facilities Inspections.
1 Effective Safety & Health Assessments: Audits and Inspections Disclaimer: These safety materials, resources and PowerPoint ® presentations are not intended.
Module 4 Assuring the Quality of Testing: A Systems Approach to Quality (ISO 15189:2012) Assuring the Quality of Laboratory Testing: A Systems Approach.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
MODULE I Close-Out Visit/Monitoring Reports Jane Fendl April 24, Versions: Final 24-Apr-2010.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
Tracking / Monitoring the IDP Tracking and monitoring are essential to ensure the success of the plan. In performing such duties, the case manager must.
1 Public Administrator/ Guardian/Conservator’s Office (PAGC) Internal Controls Audit Public Administrator/ Guardian/Conservator’s Office (PAGC) Internal.
QA/QC and QUALIFIERS LOU ANN FISHER CITY OF STILLWATER, OK
Monitoring IRB Monitoring of Clinical Trials. Types of Monitoring Internally Internally Externally Externally.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Management Systems Part II.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
HIPAA PRACTICAL APPLICATION WORKSHOP Orientation Module 1B Anderson Health Information Systems, Inc.
College Reviews An Overview Presented by Howard Lutwak, CIA Director of Internal Audit January 2004.
Laboratory Certification Update Part 2 Common Findings KWWOA Louisville April 15, 2015 Presented by Frank Hall, Laboratory Certification Coordinator.
BPHC Infectious Disease Bureau, Education & Outreach Site Visit.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
Internal environmental audit procedure Purpose: To ensure that the environmental management system is used and is effective Scope: The entire environmental.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Forum FM308: Policy Changes Tuesday June 5 10:00 a.m. AIHA Laboratory Accreditation Policy Changes—ISO “How Do Changes Affect My Laboratory?” “What.
Illinois Radon Program Review Illinois Radon Stakeholders Meeting April 24, 2015 Melinda Lewis IEMA Radon Program.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Stability Through Engagement Program STEP. STEP is a Housing First Program It is offered without preconditions, such as employment, income, mainstream.
WHAT IS THE CHEROKEE NATION? Cherokee Nation Air Quality Data Management Concepts for Quality Data Collection Ryan Callison.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Lesson 8 How can you provide quality assurance and quality control?
Confidentiality and Ethics. Knowledge and Skills Required Maintain confidentiality of clients’ records and information “Confidentiality and ethics are.
IFTA BALLOT #3 Overview of changes. Overview of Changes The new Language in Ballot #3 introduces 5 new requirements and defines “should” as a conditional.
CM&C Inspections The Pre-Approval Inspection (PAI) in the US 27 May 2010.
Scientific data storage: How are computers involved in the following?
Illinois Emergency Management Agency Illinois Radon Program Updates Illinois Radon Stakeholders Meeting March 4, 2016 Melinda Lewis.
Pennsylvania’s Radon Program- Certification, Fees, and Regulations September 21, 2016 San Diego, CA Denise S. Bleiler Radiation Protection Program Supervisor.
Pennsylvania’s Radon Program- Certification, Fees, and Regulations September 21, 2016 San Diego, CA Denise S. Bleiler Radiation Protection Program Supervisor.
Illinois Radon Program Certification, Fees, and Regulations
EDUCATION SERVICES Compliance Survey APRIL 18, 2013.
Standard Operating Procedure
Proposed Radiological Health Rulemaking
Illinois Radon Program
1. Open any Office 2016 app, such as Word, and create a new document.
Illinois Emergency Management Agency
4.5 Checking and Corrective Action Monitoring and Measurement
Training Appendix for Adult Protective Services and Employment Supports June 2018.
Presented by : Susie Neal Goodrich Corporation
Illinois Radon Program Certification, Fees, and Regulations
Topics in Microbiology Quality Assurance Project Plan Essentials
Background First ERP written in 1991 Revised in 1998
Research and Test Reactor Decommissioning Inspections
Chapter # 5 Supporting Quality Devices
TNI 2016 – Internal Audits BACWA Lab Committee ~ August 8, 2018.
Risk Management NDS Forum June 23rd 2010.
Compliance Manual Update Staff Requirements Check
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

New Audit Structure Illinois Radon Stakeholders Meeting April 24, 2015 Melinda Lewis IEMA Radon Program

General Measurement Specific Mitigation Specific New Audit Structure

New General Audit Items You have to come to us You have to bring everything to us

4 New Measurement Audit 1. Complete measurement files (residential AND commercial) for the date range of DATE - DATE. 2. Records of all duplicate tracking and control charts for the last 5 years from the date of this letter in accordance to 32 ILAC a). 3. *IF APPLICABLE* Records of all background measurement (blanks) tracking for the last 5 years from the date of this letter in accordance to 32 ILAC a). 4. *IF APPLICABLE* Records of all known radon measurement (spikes) tracking for the last 5 years from the date of this letter in accordance to 32 ILAC a). 5. *IF APPLICABLE* Records of all cross check measurement tracking for the last 5 years from the date of this letter in accordance to 32 ILAC a). 6. *IF APPLICABLE* Continuous radon monitor AND/ OR electret reader calibration records for the last 5 years from the date of this letter. This includes records for each piece of equipment being used in accordance to 32 ILAC a). 7. Records of all worker protection exposure tracking for the last 5 years from the date of this letter. 8. The total number of measurements performed in the calendar years DATE, DATE, DATE. Procedure IEMA calls licensee to set date IEMA sends notification letter outlining what to bring Licensee bring everything to our office on agreed upon day and time IEMA sends letter with any corrective actions required Licensee provides IEMA corrective action documents IEMA closes audit

5 New Measurement Specific What are we looking for? o Is everything required by in the file? o Is the measurement result reported as required? o Does the measurement report given to client contain all required pieces? Floor Plans Mitigation System Information/ Tag Numbers

6 New Measurement Specific What are we looking for? o Quality Assurance Records (5 years worth!!) Duplicate Charts Records of Spikes Records of Blanks Records of cross-checks Calibration Records o Worker Exposure Tracking (5 years worth!!) o Annual Reporting Accuracy (Specified Years)

7 New Mitigation Audit 1. Complete mitigation files for the specific addresses listed. 2. Records of all worker protection exposure tracking for the last 5 years from the date of this letter. 3. The total number of mitigations performed in the calendar years DATE, DATE, DATE. Procedure IEMA sends complimentary compliance inspection letters to addresses of completed mitigation systems IEMA performs inspections on multiple systems licensee installed IEMA calls licensee to set audit date IEMA sends notification letter outlining what to bring Licensee bring everything to our office on agreed upon day and time IEMA sends letter with any corrective actions required Licensee provides IEMA corrective action documents IEMA closes audit

8 New Mitigation Specific What are we looking for? o Did inspected systems meet all requirements of ? o Is everything required by in the file? o Does the mitigation work proposal given to client contain all required pieces? o Is there a building investigation/ floor plan? Contain all required pieces?

9 New Mitigation Specific What are we looking for? o Is there a post-installation checklist included? Does it contain all required pieces? o Are all required pieces of client information package provided to client after installation? o Exposure Tracking (5 years worth!!) o Annual Reporting Accuracy (Specified Years)

10 Questions? Melinda Lewis (217)