Small cryotrap – control rack Nov 2013. Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

HWg-Juno HW group is a manufacturer of IP-based sensors from Prague, Czech republic. HWg delivers remote monitoring & control solutions.
TIS Climate Control Course 20 Minutes Test 10 Minutes TIS Training Program 2012, Rev 1.1
The Gas Laws Section 16.3 Pressure = force =N aream 2 1N/m 2 = 1 pascal kPa = 760 mmHg = 1atm (normal atmospheric pressure) Because gas particles.
Total HVAC Control from anywhere Easy control that can save a fortune
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
Futera III Wiring Diagram Presentation G.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Chapter 8 Output Modules.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
I Pag 1 Microchiller 2. I Pag 2 I Pag 3 Information on the display.
Settings & Adjustments. Settings & Adjustments.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Continue The information provided in this training module covers the schematic flow charts for all ovens and ranges that utilized a preheat board, Self.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
Linac Marx Modulator Update Trevor Butler 5/20/2015.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
Applied Systems News FWEC*A Rudolf BARET HEISSIG.
Engineer Training UV Electrical Cabinet (1-15) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 1-15)
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Service Section Technical Training December 2005.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
the compact air control solution
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Installation of the T600 at Fermilab CSN2, September 22,
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
Air condition installation
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Installation of the T600 at Fermilab Fermilab, February 15,
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
S A Griffiths CM42 June 2015 Electrical & Control.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
NEW RMC Rack Multi Control.
Installation of the T600 at Fermilab
Recent developments in the Vacuum Control Software
352MHz Klystron Control for the 3MeV Linac test stand
November technical stop activities:
Periodical meeting about the 'control system ‘
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Teleconference ACS – FREIA 19th June 2017
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Small cryotrap – control rack Nov 2013

Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready

Small trap P2 Ge4 Ge3 Ge1 Ge1IB P1 G22 V22 V23 V1 VPRcryo VIBcryo Ge1PR T1 T2 T3 T4 T5 T6 T7 T8 Ge2 LEVEL BAKING SYSTEM

Control system functions 1/2 Interlock valves: forbid opening if the pressure is higher than a selectable threshold (1 mbar) and automatic closing (conditions on vacuum, inner P, temperature, compressed air lack). HW wired (maxigauge, temp driver, pressostat) a table will be prepared

Functions 2/2 Integrate the racks among the others ones of LAL= communicate with other PLCs for future auto actions Readout statuses (temperatures, pressure, level, vacuum, valves) and send them to DAQ Possibility to operate the two vacuum valves in local mode Display in local mode the temperature, valve status and LN2 level SW supervisor, integrated in the general one. Display status, possibility to close the 2 vacuum valves by remote. No automatic actions/loops required for the supervisor. Heating jacket: thermoregulator could be read by remote and in case stopped: included in the control system? Racks env. noise: 24V power supply thoroidal type, normally no fans Procure a driver for the PT100 with alarm Implement the last version of the Virgo+ refill automatic procedure (2 auto valves + transfer line to external tank?) per accelerare la rigenerazione utilizzare un riscaldatore interno al 'dewar Consider a KEY in the loacl panel, to enable valves (opening authorized)

NOTES: 1) A local display would be very useful for the operator during refills, could be connected with a cable to the rack, installed about 10m far from the cryotrap 2) Some components to purchase: PLC (Giulio/Martin), Temperature sensors (Antonio), cabinets +relays + cablings (Roberto/Beatrice), Maxigauge + sensors (Luca), Level meter (American Magnets, Antonio/Luca), Baking system (Roberto/Beatrice/Antonio), Temperature readout with alarms (Roberto/Beatrice) Riscaldatore interno al tank LN2 (Roberto/Beatrice/Antonio … 3) Documents related to Small Cryotraps