Status Report #1 Autonomous GPS Vehicle Brendon Balouch Vernal Garcia Brian Gonzalez Kim Pham January 29, 2006 Purpose: To implement a fastest route algorithm.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
January 6. January 7 January 8 January 9 January 10.
Real time vehicle tracking and driver behavior monitoring using a cellular handset based on accelerometry and GPS data Kevin Burke 4 th Electronic and.
DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Wireless Telemetry System for Solar Vehicle Scott Cowan Elliot Hernandez Tung Le March 14, 2011 Scott Cowan Elliot Hernandez Tung Le March 14, 2011 School.
GPSBot08 System Overview.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
Team BAKE Bryan Schoen Ashish Bablani Kelby Penney Evan Schurr
Team GPS Rover Critical Design Review Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Coordinate Based Tracking System
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Status Report #01 Automated Vehicle Tracking System AVTS David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
Design Review: RoboSiM Robotic Surveillance in Motion

Taitong para Govt. primary School
Savings and Investment Unit Project Student Name.
Staffing Calculations Presented by Ed Talley, Manager, Northern Arizona University Postal Services Office: Cell:
{ Lost Object Locator Status Report #2, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Status Report #7 Wireless GPS-Navigated Autonomous Vehicle April 9th, 2007 Purpose: To implement a fastest route algorithm in a GPS enabled vehicle. Prepared.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Status Report #2 Autonomous Lawnmower Team 5 April Fowler Jose Manzanares Ranjith Raghunath Christopher Gerhardt 5 Feb 07 To design and implement an autonomous.
Jason Holmes Matt Wickesberg Michael Piercy Matt Guenette Team 12 – Super Tank February 15, 2012.
1 © 2008 RoboRubik ECE 477 Final Presentation Team 11 – Spring 2008 Tyler Heck Dave Bukiet Erik Carron Casey Kloiber.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #5 March 3, 2010.
EECS 541/542 Rebekah Patterson Ty Hayden Paul Bennett.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
1 4-Integrating Peripherals in Embedded Systems (cont.)
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Energy Conservation System (ECS) Status Report #4 James Sturdivant Ionel Taflan Juan Tamez Susan Austin.
The Surveyor By: Randy Direen, David Cox, Ali Abali, Leonardo Carrasco, Lisa Prince Preliminary Design Review January 25, 2005.
1 4-Integrating Peripherals in Embedded Systems (cont.)
Status Report #2 GPS-Navigated Autonomous Vehicle February fif, 2007 Purpose: To implement a fastest route algorithm in a GPS enabled vehicle. Prepared.
Agenda MC Aug 13.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
Computer Fundamentals
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
The SAT will be given at ECHS on the dates below!
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
The U.S.S.E Status Report #3 February 16th, 2009
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
Star Benchmark Percentile Ranking Name:
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Status Report #1 Autonomous GPS Vehicle Brendon Balouch Vernal Garcia Brian Gonzalez Kim Pham January 29, 2006 Purpose: To implement a fastest route algorithm in a GPS enabled vehicle

 Overall Need:  Project Milestones:  Establish communication between GPS and microprocessor  Build a steering control circuit  Build a drive train control circuit  Write our fastest route algorithm.  Integrate all pieces into a single package

Task Completions  Communication established between GPS and microprocessor  RS-232 8N1 protocol successfully programmed for the ATMEL AT91 processor  GPS NMEA data sentences successfully decoded and converted to calculable integers.

Task Completion Dates  PWM Motor Driver Schematic  February 9 th, 2007  H-Bridge Steering Controller Schematic  February 9 th, 2007  Preliminary Fastest Route Algorithm  February 23th, 2007  Project Synergy  March 16 th, 2007

Projects Which Will Begin  PWM Motor Control Circuit  H-Bridge Steering Control Circuit  Fastest Route Algorithm  Programming of Processor to Support Peripheral Devices

Recently Completed Tasks  Vehicle Purchased  December 29 th, 2006  Processor Obtained  October 10 th, 2006  GPS Purchased  November 18 th, 2006