SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.

Slides:



Advertisements
Similar presentations
MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
SNuMI: Phase I & Phase II Nancy Grossman Phase I: $33.4M FY06$ (no contingency, no G&A) 41% contingency Phase II: $53.7M FY06$ (no contingency, no G&A)
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
1 "On PD-->SNuMI-->PP2-->NoVA transition" {VS} Bob Zwaska Accelerator Physics Department Meeting Jan. 10, 2007 ≠
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting,
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
PAC Meeting, December 12, Prebys 1 The Problem.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
WEEK 3 Project Planning.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Status of the MICE Construction Project
East Hall under construction
News and brief overview of Beamline plans for the next few months
Presentation transcript:

SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction Status –Funding Profile Status & Fund Types Cost Accounts –GPP (New Start and Funding) SNuMI Status –Strategy – Comparison Table [Nancy] –Campaign/MIE Project/Line Item Project? [All]

SNuMI 2 Outline Notes: 1.The individuals shown with responsibility on subprojects are matrixed to Proton Plan 2. 2.Line management for safety is through the subproject departments within AD and TD. 3.PM: Project Manger 4.RSC: Radiation Safety Coordinator Org Chart 4 December 2006

SNuMI 3 FY07 Budget FY07 Budget from Bruce: $1.2M (M&S only) Civil outside work for FY07came in significantly over estimate – Working on a compromise (do less design work in FY07 than wished) Beamline being optimized: –1 less kicker prototype?, a new Lambertson magnet?, less mirror magnets?

SNuMI 4 FY07 Budget – FY08 Shutdown Need shutdowns for PP2 civil construction work for: –Excavation & installation of penetrations at MI14/39 tunnel locations –Excavation & installation of building foundations within or near shielding envelope –Installation of utilities (ICW, comm/power ductbanks, power cable) across berms Desirable to do all this during FY07 shutdown, but –to minimize FY07 M&S and spread schedule risk during shutdown over more time, –would like to do cable installation, particularly from MI8 to MI14, during FY08 shutdown. Need to know how to plan work in order to properly write GPP CDR for approval in January.

SNuMI 5 Overall cost Reduction Status Done, but not checked: –Nearly done separating out spares Need to check and sum costs (with and without spares) –Replaced new quads in NuMI beamline with existing ones Added new profile monitors –Made NuMI items more “realistic” - New items replaced with minor modifications to existing equipment Saves M&S Minimizes radioactive components needed to store Increases work required during the shutdown as must remove component, then modify in the workcell, then re-install vs. simply replacing with a new component This increased work is probably not real as if we made new modules, we would have a lot of work compacting and removing the old modules

SNuMI 6 Overall cost Reduction Status In progress or still to do: –Changes due to beamline optimization Need to verify/review changes first One less kicker prototype A new Lambertson magnet Less mirror magnets? Have not gotten spares to roll up separately in the schedule yet –Should be done in the next day or two –Once we see the bottom line, we will have a good idea of how much further we have to go –Too many cost changes (both ways) to be able to guess at this point. I am hopeful we will get close to $17M M&S

SNuMI 7 Funding Profile Have more or less sufficiently delayed tasks from FY07 to FY08 Delaying M&S tasks from FY08 to FY09 –Mostly done – needs checking –Fixing links, clarifying tasks (mostly in the NuMI portion) –Changing WBS structure at lower levels Balancing management WBS structure vs. cost accounting WBS structure Once we settle the M&S FY08 to FY09 delays, will look at FY09 to FY10 delays of M&S –Mainly NuMI Will need to then look at labor profiles too and see re-level Probably only get the M&S delays done and QA’d a bit for the January profile –We will only have had a chance to look at the labor profile a bit at that point and not get to level too much, depending on when in January this is needed

SNuMI 8 Funding Profile for DOE Developing funding profile based on these DOE fund types that relate to Fermilab Service Types Assumed to include labor and M&S Need goal date by which this is required Would like input as to how this profile is going to be used SERVICE TYPEDOE FUND TYPE OP-EXST PRGM OP-ACCELOperating (general studies, analysis, decommissioning) EQ-EXST PRGM SUPP-ACCELGeneral Equipment (includes design, fabrication & installation) PL-EXST PRGM SUPP-GPPPlant (civil work) OP-EXST PRGM OP R&D-ACCELR&D (prototype design, fab., test) OP-INV-SPARESInv (is this req’d since spares are off the campaign?)

SNuMI 9 Other Budget Items For items like NuMI Module modifications where the modifications are ~$100K (most likely what we will do) and a new module (may have to do) is ~$350K (M&S): –Do we put in a huge contingency to cover this possibility? –Hard to say how likely the new module option is at this point –How is this handled? Working with Ann and Barbara to set up cost accounts –Goal is late January GPP (New Start and Funding) Discussion

SNuMI 10 SNuMI Status SNuMI Alternatives –Talked to Dave M. about NuMI alternatives, outcome of discussion: –He will write a document that compares and contrasts the technical merits and difficulties of the three different options for providing beam powers greater than 1 MW for a 120 GeV proton beam Slip stacking 18 batches in the Recycler Momentum stacking in the Accumulator Proton Driver. –Ioanis will help –Will get input on the Proton Driver from Proton Driver management (most likely Bob Webber). –Goal to complete the document by the end of the year (2006). Campaign/MIE Project/Line Item Project? [All]

SNuMI 11 SNuMI Timeline as Project (Line Item) Line Item Project: Complete 12/12