SiD Workshop Highlights May 8, 2007 John Jaros. Jim Brau WWS Detector Roadmap SiD Workshop, Fermilab April 9, 2007 Keeping up with Machine: Motivation.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012.
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
White Papers, Framework Proposals, FOA’s, and LCDRD John Jaros SiD Meeting Oregon ALCPG March 23, 2011.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.
SiD and the Roadmap for ILC Detectors SLAC Users Organization Annual Meeting June 7, 2007 John Jaros.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
September 9, 2002David Rubin/ Cornell 1 UCLC Briefing UCLC Briefing to the US LC SG Accelerator Review Committee September 9, 2002 David Rubin Cornell.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
IDAG Tracking Review  Groups have not yet submitted LOI  Avoid ‘temptation’ to regard as a Technical Design Review  Rules Specified –leave groups to.
Status of SiD PFA Development Lei Xia (ANL – HEP) What tools do we need What tools do we need Where are we now Where are we now Future plan Future plan.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
Albrecht Wagner, Report from ICFA, LP 2007 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA and the ILC 4.Other activities of ICFA Albrecht.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
ILC Detector R&D at DOE High Energy Physics SiD Workshop Apr. 11, 2007 Paul Grannis DOE Office of High Energy Physics 1.
W. Morse May 15, Colliding 5nm Beams at the International Linear Collider William Morse Brookhaven National Lab.
1 + DOE/NSF ILC Detector R&D Review June19-20, 2007 At Argonne National Laboratory Paul Grannis Jim Whitmore.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
ILC Detector R&D at DOE High Energy Physics SiD Workshop Apr. 11, 2007 Paul Grannis DOE Office of High Energy Physics.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
CHARGE TO THE 2007 LINEAR COLLIDER WORKSHOP Jim Brau University of Oregon DESY Hamburg May 30, 2007.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
PFA Jet Energy Measurements Lei Xia ANL-HEP. June 19, 2007 Lei Xia 2 ILC requires precise measurement for jet energy/di-jet mass At LEP, ALEPH got a jet.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
F. Richard LAL/Orsay What has happened end of 2007 for ILC and the consequences? F. Richard LAL/Orsay First ILD workshop Berlin, Germany, Jan 14-16, 2008.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
How to Get Involved in SiD Richard Partridge Brown / SLAC LCWS 07.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
W. Morse GamCal1 GamCal: a Beam-strahlung Gamma Detector for Beam Diagnostics William M. Morse Brookhaven National Lab.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Status of the DCR Detector Chapter International Linear Collider (ILC) Workshop ILC-ECFA and GDE Joint Meeting in Valencia 7 November 2006 Detector Concept.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
William Morse ILC R&D April 19, ILC Detector R&D William Morse Physics Dept., BNL.
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
FCAL Munich October W.M. Morse 1 U.S. FCAL Efforts William Morse - BNL.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
LumCal, BeamCal and GamCal
Preparations for the SiD Workshop at Fermilab, April 9-11
The SiD Detector Outline Overview
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
SiD and the Next Steps for ILC Detectors
The Silicon Detector Design Study European Kickoff Meeting
Presentation transcript:

SiD Workshop Highlights May 8, 2007 John Jaros

Jim Brau WWS Detector Roadmap SiD Workshop, Fermilab April 9, 2007 Keeping up with Machine: Motivation for Roadmap progress on machine side must be followed by detectors – technology decision – GDE formed – baseline configuration – reference design –2009 or so - engineering design similar engineering effort is only possible if support is combined to two efforts, rather than addressing >2 engineering designs

Jim Brau WWS Detector Roadmap SiD Workshop, Fermilab April 9, 2007 Shin-ichi Kurokawa, ILCSC Chair Albrecht Wagner, ICFA Chair Subject: Letter to WWS Co-Chairs 26 February 2007 To: Co-Chairs of the WWS International Organizing Committee From: ILCSC The realization of the International Linear Collider has taken major steps forward in recent years. This could not have happened without the leadership taken coherently by the particle physics community, within the framework of ICFA. Unprecedented collaborative steps have been necessary, and the community has adapted successfully to what, in some regions, required major redirections of traditional accelerator R&D effort. Two major milestones, the selection of the main-linac RF technology and the GDE’s announcement of the RDR budget and associated design choices, keep the GDE on pace to complete a construction-ready engineering design for the ILC accelerator- complex by Maintaining this momentum requires also that the equivalent strategic decisions and the level of technical maturity for the two ILC detector proposals keep pace with the accelerator schedule. Major progress in this regard is ongoing under the auspices of WWS. In addition, a definite plan together with milestones is needed to have detector designs of a maturity similar to that of the accelerator by This needs an enhanced effort by the community. ILCSC will support the formation of an International Detector Advisory Group to assist this effort. ICFA looks forward to receiving such a plan from WWS at the June 1, 2007 ILCSC meeting at DESY.

The WWS Roadmap WWS Roadmap calls for 2 Detector Engineering Design Reports (EDRs) when the Machine EDR is complete (2010). This is a make or break time for the ILC. The machine and the detectors need to be ready for it. Working back, that means (my interpretation): Two international, complementary Detector Designs must be defined by 2008 The four extant, regional Detector Concepts in 2007 need to coalesce spontaneously into two (mine and a combination of the others) or Two of the four extant, regional Detector Concepts in 2007 must be selected, and the appropriate marriages arranged to preserve the ILC community and international balance. or ???

How Should SiD Respond to WWS Roadmap? An uncertain world! What should SiD do? Play Ball. Participate in WWS Roadmap Process, the Inter-Concept Jet Reconstruction Working Group, and the ongoing subsystem R&D reviews. Internationalize SiD Recruit new collaborators, especially Asian and Europeans, to help with optimizing the SiD design. Get moving on the SiD Conceptual Design Report We need to understand, optimize, and complete our design.

Calorimetry, Calorimetry, Calorimetry Old and outstanding questions addressed in this Workshop: 1. What Jet Energy Resolution do we really need? 30%/  E ? Tim Barklow: 60%/  E  30%/  E buys 40% luminosity Bill Morse:  m dijet /m dijet ~  E jet /E jet so don’t need 30%/  E,  E jet / E jet = 3-4 % is OK. 2. What Jet Energy Resolution can we get? Steve Magill: Progress with PFAs Ron Cassell: Progress without PFAs. 3. What Hcal do we want? Jerry Blazey: Hcal R&D Plan 4. Pure PFA? Hybrid PFA/Traditional Cal? EFA? WWS has initiated ‘Jet Reconstruction Working Group’ to address these questions across concepts.

7 w/o gluon rad

Morse/Partridge April 2007 FNAL Need to be guided by analytical calculations! Effective mass resolution: M 2  E 1 E 2 (1 - cos  12 ) dM 12 /M 12  ½(dE 1 /E 1 + dE 2 /E 2 + ……) Elementary considerations show: 3-4% jet energy resolution required NOT dE/E = 30%/√E Physics simulations needed to more accurately specify x: dE/E=x

Morse/Partridge April 2007 FNAL Light quark jets ee  qq GLD- PFA

Morse/Partridge April 2007 FNAL Conclusions We need ILC jet energy resolution of dE/E  3 - 4% Need physics simulations to give a more accurate number Present state of the art with PFA is dE/E  4.5 – 5.5%.

Mechanical: Stack for Vertical Slice Test Design accommodates 20 x 20 cm 2 RPCs as well as 30 x 30 cm 2 GEMs Stack is assembled

Morse/Partridge April 2007 FNAL Collaboration High precision design DESY-PRC2006

Morse/Partridge April 2007 FNAL U.S. Forward (SiD) G. Haller, A. Abusleme, M. Breidenbach, D. Freytag (SLAC): BeamCal readout design Z. Li (BNL): BeamCal radiation damage issues B. Parker (BNL): machine interface issues M. Zeller, G. Atoian, V. Issakov, A. Poblaguev (Yale): GamCal design issues Y. Nosochkov (SLAC): Extraction line issues U. Nauenberg (Colorado): SUSY studies

Rich Partridge, Marcel Demarteau for the Tracking Group SiD Workshop April 11, 2007 Fermilab Tracking Review at Beijing Post-Mortem

Morse/Partridge April 2007 FNAL Summary  The ILC is still at the top of the priority list for DOE.  FY2007 will bring modest increase for detector R&D.  The June Review will be important for making the case that the US R&D program is well planned.  We need to evolve the structure of the worldwide detector program. 15

Morse/Partridge April 2007 FNAL Consultants: Tim Bolton (Kansas State) David Cassel (Cornell) Gary Feldman (Harvard) Meenakshi Narain (Brown) Regina Rameika (FNAL) Michael Rijssenbeek (Stony Brook) Bing Zhou (Michigan) DOE budget guidance for review. $M Detector R&D Review This guidance is only advisory – funding levels are always subject to change! Not all possible R&D topics likely affordable in US (also true for ILC accelerator), so critical evaluation of work in other regions is needed. 10