WP10.3 Crab Cavities Overview EUCARD SRF Annual Review Peter McIntosh (STFC, ASTeC, Daresbury Laboratory) 4 – 5 May 2011, Orsay.

Slides:



Advertisements
Similar presentations
EMMA RF System Summary RF Requirements (S Berg): Aperture: –Aperture 34.7 mm (min) –Dispersion effects may increase by 3 – 4 mm Frequency: –Frequency range.
Advertisements

Cockcroft Institute LC-ABD plenary April 2007 ILC Crab Cavity Collaboration Cockcroft Institute : –Richard Carter (Lancaster University) –Amos Dexter (Lancaster.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Initiating the Crab System R&D Graeme Burt Lancaster University Philippe Goudket Daresbury Laboratory.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Slim crab cavity development Luca Ficcadenti, Joachim Tuckmantel CERN – Geneva LHC-CC11, 5th LHC Crab Cavity Workshop.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
ILC BDS Collimation Optimisation and PLACET simulations Adina Toader School of Physics and Astronomy, University of Manchester & Cockcroft Institute, Daresbury.
ILC BDS Collimation Optimisation and PLACET simulations Adina Toader School of Physics and Astronomy, University of Manchester & Cockcroft Institute, Daresbury.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Ofelia Capatina on behalf of the CERN specification team
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
2 nd EuroTeV Annual Meeting, Daresbury 9 th January 2007 WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, CCLRC Daresbury Laboratory.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
HL-LHC-UK G. Burt, Lancaster University 1. HiLumi-LHC UK HiLumi-LHC UK Superconductivity and Cryogenics Machine-detector interface Beam dynamics Crab.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
Compact Crab Cavity Status E. Jensen for WP4 R. Appleby, T. Baer, J. Barranco, I. Ben-Zvi, G. Burt, R. Calaga, E. Ciapala, S. Da Silva, J. Delayen, L.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Crab Cavities Failure Mode: Machine Protection Matrix Goals: Identify the most critical failure cases Design mitigation methods Make machine protection.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 July 2010.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
A Four Rod Compact Crab Cavity for LHC Dr C Lingwood for Dr G Burt Lancaster University / Cockcroft Institute.
Review of options for crab cavities in LHC:
WP5 Elliptical cavities
UK X FEL Kick-off Meeting
Odu/slac rf-dipole prototype
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
An X-band system for phase space linearisation on CLARA
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Second SPL Collaboration Meeting, Vancouver May 2009
Design Fabrication and Processing Group H. Padamsee
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Developments on Proposed
Double Quarter Wave Crab Cavity
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
Task 2: High-gradient normal-conducting technology development
Update of CLIC accelerating structure design
LHC-CC09 workshop LHC Crab Cavity Workshop, jointly organized by CERN, EuCARD-ACCNET, US-LARP, KEK, & Daresbury Lab/Cockcroft Institute CERN, September.
Update on Crab Cavity Simulations for JLEIC
Presentation transcript:

WP10.3 Crab Cavities Overview EUCARD SRF Annual Review Peter McIntosh (STFC, ASTeC, Daresbury Laboratory) 4 – 5 May 2011, Orsay

Outline The Collaboration Team Description of the Scientific Work Project Planning Deliverables and Milestones Publications and Events WP10.3 Programme

The Collaboration Team CERN (Switzerland) –Fellow (Luca Ficcadenti ) 18 m.m. from May 2010 CERN Total 18 m.m. ULAN-CI (UK) –RA-Cavity (P Ambattu) 18 m.m. –RA-LLRF (I Tahir) – Left July m.m. –Academic-Cavity (G Burt) 4 m.m. –Academic-LLRF (A Dexter) 4 m.m. ULAN-CI Total 36 m.m. RA-LLRF post not replaced UMAN-CI (UK) –PDRA-Cavity (A D’Elia) 16 m.m. –Academic-Cavity (R Jones) 2 m.m. UMAN-CI Total 18 m.m. All in post STFC (UK) –WP Coordinator (P McIntosh) 4 m.m. –RF Engineer (P Goudket) 10 m.m. –Mech Designer (Undefined) 4 m.m. STFC Total 18 m.m. All in post

WP10.3 Crab Cavities Design, build and test a single LHC and CLIC crab cavity structure, including input coupler, mode couplers and tuners. Design, build and test a LLRF and synchronization system that meets the crab cavity phase and amplitude control specifications for LHC and CLIC. If the beam time and the necessary hardware become available, validate and test the assembled crab system solutions (as part of wider collaboration teams) and LLRF control systems on LHC and CTF3 in 2011; otherwise make performance predictions based on the measured noise characteristics.

LHC-CC Progress A study of the LHC-CC HOMs has been completed, this study will feed into further work on HOM couplers. Alterations to the cavity specifications made in light of work at CERN identifying that the field variation across the aperture should be minimised from 20% down to 3%. Electromagnetic design work has now been focussed on the LOM couplers for this cavity geometry. A contract has now been placed with a UK company for prototype cavity fabrication.

LHC-CC10 CERN: Dec 10 Steve Myers (CERN Director of Accelerators) conclusions Crabs are the *baseline* tool for geometric compensation and luminosity levelling for the HL-LHC: –The nominal scheme is for local crab crossing with 400 MHz superconducting cavities independent of each IP (IP1 and IP5). –Backup options pursued if technology limits or machine protection issues are identified. No cavity down selection will be made now: –Foreseen after the results from prototyping yield conclusive reasons to pick the best candidate for the LHC. –Expected by the end of Identical systems for both IPs are preferable but this is not an absolute requirement: –Should pursue the best candidate satisfying the appropriate crossing scheme. KEK-B crab cavities will not be installed in the SPS due to several reasons: –Cost, difficulty, extrapolation to LHC, risk etc. Machine protection with crab cavities needs detailed investigation with realistic RF failure signals in conjunction with the upgraded collimation system to give a clear conclusion. No show stoppers identified for the compact cavity designs presented: –3 – 4 promising designs compatible with the LHC footprint exist. –Cavity engineering design and prototyping should follow. –A common platform for couplers, tuners and cryomodule equipment should be studied. Detailed specifications for the cavities should be given, addressing the requirements on: –transparency, –impedance, –field quality, –fundamental mode damping, –trip rate, –synchro-betatron resonances, –plane of crabbing, etc.

CLIC-CC Developments A complete study of the long range wakefields in the CLIC crab cavity has been completed: –highlighted a need for a 1 GHz separation between the vertical and horizontal crabbing modes. –Studies are now looking at the optimum method of implementing this frequency shift without increasing surface fields. A study of various damping methods has concluded that waveguide damping is the optimum solution for the CLIC crab cavity, although exact dimensions need iterating with the polarised cavity design. PLACET and Guinea pig simulations have continued investigating the effect of the crab cavity on the CLIC luminosity.

Crab Cavity LLRF Solutions LHC-CC –Full digital system anticipated, based on ILC-CC R&D. –Interferometer synchronisation. –Stability tolerance expected: <0.04% and mrad. CLIC-CC –Hybrid digital-analogue system anticipated. –Analogue adjustment during the bunch train. –Digital for train to train optimisation of control loop. –Timing tolerance expected: 6 fs.

10.3 Project Plan and Milestones

WP10.3 Milestones NumberTitleOutputMonth M10.3.1LHC crab cavity specifications completedRM12 M10.3.2LHC model crab cavity completedP M24  M27 M LHC input and LOM mode coupler design development finished P/RM33 M10.3.4CLIC crab cavity specifications completedRM12 M10.3.5CLIC model crab cavity completedP M24  M26 M CLIC input and mode coupler design development finished P/RM33 M10.3.7Development of CLIC LLRF systemP/R M21  M24 M10.3.8Development of LHC LLRF systemPM30

WP10.3 Milestone Status M LHC model crab cavity fabricated –Delayed due to specification changes implemented during LHC- CC09. –Prototype CC released for fabrication and expected in M27. M CLIC model crab cavity fabricated –Delayed due to precision tolerances not being met post-braze at manufacturer. –Prototype CC awaiting final brazing steps and expected in M26. M Development of CLIC LLRF System –Due in M21 and submitted in M24. –Delayed due to loss of LLRF-RA at Lancaster University.

WP10.3 Deliverables WP1: LHC-CC Design (F Zimmerman, CERN) WP2: CLIC-CC Design (R Jones, UMAN-CI) WP3: LHC-CC and CLIC-CC LLRF (A Dexter, ULAN-CI) NumberTitleOutputMonth LHC crab cavity final reportRM CLIC crab cavity final reportRM LHC and CLIC LLRF final reportsRM36

Publications & Events Publications Status of LHC Crab Cavity Simulations and Beam Studies, R Calaga et al Particle Accelerator Conference 2009, Vancouver, LHC Upgrade Scenarios, F Zimmermann et al Particle Accelerator Conference 2009, Vancouver, Wakefield Damping for the CLIC Crab Cavity, P Ambattu et al Particle Accelerator Conference 2009, Vancouver, Status of LHC Crab Cavity Cryostat, N Solyak et al Particle Accelerator Conference 2009, Vancouver, Novel Geometries for the LHC Crab Cavity, B Hall et al Particle Accelerator Conference 2009, Vancouver, Study with One Global Crab Cavity at IR4 for LHC, Y Sun et al Particle Accelerator Conference 2009, Vancouver, Tune Shift due to Crossing Collision and Crab Collision, Y Sun et al Particle Accelerator Conference 2009, Vancouver, New Cavity Shape Developments for Crabbing Applications, G Burt Superconducting RF Conference 2009, Berlin, Novel Geometries for the LHC Crab Cavity, B Hall et al International Particle Accelerator Conference 2010, Kyoto, Evolutionary Algorithms in the Design of Crab Cavities, C Lingwood et al International Particle Accelerator Conference 2010, Kyoto, Analysis and Control of Wakefields in X-Band Crab Cavities for Compact Linear Collider, P.K. Ambattu et al accepted by NIM-A subject to modifications (2011) CLIC Crab cavity Design optimisation for Maximum Luminosity, A Dexter et al accepted by NIM-A subject to modifications (2011) Events EuCARD ACCNET workshop on LHC crab cavities, “LHC-CC10,” at CERN, Dec 2010 ICFA Mini-Workshop on X-Band Structures, Beam Dynamics and Sources, at Cockcroft Institute, 30 Nov - 3 Dec 2010

WP10.3 Review Programme WP10.3 Crab Cavities Overview & Status –P McIntosh (STFC)15 mins CLIC-CC Development –G Burt (ULAN-CI)20 mins CERN LHC Crab Requirements and LHC-CC10 Impact –E Ciapala (CERN) 20 mins LHC-CC Development –B Hall (ULAN-CI)20 mins LLRF System Developments –G Burt (ULAN-CI)20 mins