HDR | Presentation Update to Flood Project Working Group Shawn Gooch, P.E. City of Sparks February 27, 2008 North Truckee Drain Relocation Project.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Advertisements

15 March 2012 WATERSHED Science & Engineering WEST Consultants.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
The Challenges & Opportunities for Better Neighborhood Flood Protection in New Orleans Jeffrey J. Thomas, JD.
Truro DG5 Scheme April Integrated Urban Drainage Schemes Proposed Hendra Road surface water separation Kenwyn Street Proposed Redannick Lane surface.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President.
Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E. Watershed Planning and Design Sacramento,
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
Vallecito Creek Drainage Area 1. Vallecito Creek Drainage Drainage Area - 96 sq. miles (61,440 acres) Length of Tributary Streams miles Residential.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Southside Flood Protection
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
VILLAGE OF PATCH, NM, FEASIBILITY STUDY Village of Patch Case Study Seattle Environmen tal Planning Class June, 2009 US Army Corps of Engineers Albuquerque.
Public Hearing (PH 1) City Council Meeting February 7, 2012.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
Water Conservation, Reuse & Storage Grant Program Application Review Team Meeting November 7, 2013.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
E NGINEERING D IVISION 13 th Street Storm Drain Replacement Project Prebid Meeting for Phases 2 & 3.
Construction Report December 8, Projects Track replacement and turf In Progress Walking tracks: Redesign Water wells January 2010 Bleachers January.
Phase 2: 30% Design Plans September 4 th, 2012.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
North Section 1 st Avenue to RR North Section NP to RR South Section 1 st Avenue to 4 th Street Levee South Section 1 st Avenue to 4 th Street Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
“Update Existing Flood Inundation Mapping”
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead SDIP City of Charlotte, North Carolina.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
SMC South ALG Matrix Wire, Inc. Lee County April 26, 2012 DP.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Reno Area / Rail-Transit Options March 24, 2016 Reno Area Rail-Transit Options by Lawrence Meeker HNTB Corporation Reno Area Rail-Transit Options by Lawrence.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
2nd Street Drainage and Paving Improvements
Potomac Yard Metrorail Station
City of Johnston East of Merle Hay Road Infrastructure Improvements
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Manchester’s CSO Program: A Look Behind and a Look Ahead
I-84 Waterbury Project Project Overview July 2017.
Babcock Basin-Design Phase
Measure A Financial Oversight Committee August 7, 2013
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Hydrology.
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
FEASIBILITY AND COST PRESENTATION – 9/26/17
Study of Miles City Slough
New Public Transport Infrastructure
Design and Engineering Services
Sacramento Environmental Commission January 2019.
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

HDR | Presentation Update to Flood Project Working Group Shawn Gooch, P.E. City of Sparks February 27, 2008 North Truckee Drain Relocation Project

City of Sparks/HDR Engineering, Inc. Final Project Update December 18, 2007 Shawn K. Gooch, P.E.Jay Aldean, P.E. Flood Control ManagerProject Manager City of SparksHDR North Truckee Drain Relocation Project JoAnn Meacham, P.E. Utility Manager City of Sparks

HDR | Presentation What has happened since our last meeting? Corps decided to check/review their hydrology for the North Truckee Drain Changed calculation methods Found inconsistencies with application of original method HDR performed hydrologic update Changed design criteria for the Truckee River Flood Project from the 100-yr to the 117-yr storm Resulted in a significantly larger conveyance structure (from 2: 10’ x 10’ culverts to 2: 22’ x 10’ culverts)

HDR | Presentation Large Box Culvert Photos

HDR | Presentation Alternative Alignments Considered

HDR | Presentation Alignments as Analyzed

HDR | Presentation Alignments Characteristics ALIGNMENT 1 – PURPLE (NDOT – VISTA)  Runs east along Brierley Way to Vista  Located in UPRR R/W (north of tracks) east of Vista  3 Jack & Bore Crossings: Vista, I-80, UPRR  Overall Length: ~ 6,400 LF ALIGNMENT 2 – GREEN (UPRR TO LARKIN CIR)  300 LF J&B under I-80 to the South  People’s Drain flow combined w/ NTD on the south side of UPRR  Stays in back yards of private property  Crosses Greg Street with 40’ deep open cut  Follows Larkin Circle to outfall at the Truckee River  Overall Length: ~ 5,900 feet ALIGNMENT 3 – BLUE (KLEPPE LN TO LARKIN CIR)  300 LF J&B under I-80 to the South  People’s Drain flow combined w/ NTD on the south side of UPRR  Alignment follows existing NTD to Kleppe Ln  From Kleppe Ln across parking lot to Greg St  Crosses Greg Street with 40’ deep open cut  Follows Larkin Circle to outfall at the Truckee River  Overall Length: ~ 5,300 feet

HDR | Presentation Alignment 2

HDR | Presentation Project Costs Costs presented are in million dollars and do not include land costs  Alignment 1 $67 Land Requirements (PERM)(TEMP)  UPRR 3.4 ac 6.0 ac  NDOT 2.9 ac 4.3 ac  Other Private 0.1 ac 0.9 ac  # Lots Impacted 1 5  Alignment 2 $45 Land Requirements  UPRR 0.4 ac 1.1 ac  NDOT 0.4 ac 0.6 ac  Other Private 3.0 ac 7.5 ac  # Lots Impacted  Alignment 4 $46 Land Requirements  UPRR 0.4 ac 1.2 ac  NDOT 0.4 ac 0.6 ac  Other Private 2.3 ac 6.2 ac  # Lots Impacted 15 23

HDR | Presentation North Truckee Drain Realignment Next Steps Value Engineering Analysis Environmental Assessment Utilities Geotechnical Engineering Surveying Right-of-Way Design Build vs Design Bid Build 104 Cost Sharing and Authorization

HDR | Presentation Questions

HDR | Presentation Current 100-yr Inundation

HDR | Presentation 2006 Storm Inundation