Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.

Slides:



Advertisements
Similar presentations
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Advertisements

BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
FRCC Fall Compliance Workshop October , 2013
Cyber Security 2005 ERCOT COMPLIANCE ROLLOUT Lane Robinson Reliability Analyst.
NERC Functional Model AND HOW IT RELATES TO THE ERCOT REGION
Talk With Texas RE Protocol Compliance Department February 21, 2013.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Texas Regional Entity Compliance Report TAC July 9, 2009.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Texas Regional Entity Compliance Report Board of Directors June 15, 2009.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
ERCOT MARKET EDUCATION
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
NERC and ESISAC Electricity Sector Information Sharing and Analysis Center Update March 2006 CIPC Confidentiality: Public Release.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.
Texas Regional Entity Report Mark Henry June 6, 2008.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
Distributed Generation Registration June 30, 2008.
1 Audit Preparation. 2 September 8 – 11, 2008 ERCOT will be audited as the Reliability Coordinator (RC) Transmission Operator ( TOP) Balancing Authority.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Compliance Update Larry Grimm ERCOT Compliance To The ERCOT Board of Directors September 20, 2005.
FRCC Regional Entity Webinar NERC Reliability Standard Development Projects and Situational Awareness and Event Analysis October 30, 2013, 1:00 p.m. –
WHAT YOU NEED TO KNOW ABOUT NERC ERO COMPLIANCE Louise McCarren Chief Executive Officer – WECC APPA National Conference June 16, 2009 Salt Lake City, Utah.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Compliance Program Update Lisa Milanes Manager of Compliance Administration.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
System Restoration & Blackstart Standards Drafting Team Presentation to Texas RE Reliability Standards Committee March 4, 2009 Rick Terrill Confidential.
Compliance Report to ERCOT BOD December 2006
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
CIIMS Proposal for TOP-003 Approach
ERCOT Technical Advisory Committee June 2, 2005
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Rates & Regulatory Updates
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Support Systems and Tools
CMEP Technology Project
Presentation transcript:

Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009

Page 2 of 20 Topics 1.Load Serving Entity Update Compliance Overview 3.Compliance Monitoring Methods 4.Events 5.FERC Audit Texas RE ROS Presentation January 2009

Page 3 of 20 SAR-005, 006, 007: Remove LSE Applicability-- Background  FERC Order requiring LSE registration: October 16, 2008 Order in the Direct/Sempra/Strategic registration cases (Docket Nos. RC07-4, 6 and 7).  NERC’s short term solution was to register DPs as LSEs.  Because Texas State Law requires: “transmission and distribution utility shall not provide competitive energy services”; certain LSE requirements cannot be performed by competitive/independent DPs.  LSE requirements are fulfilled for these standards by other entities who are already registered and have committed to and take complete responsibility for fulfilling these requirements – e.g. ERCOT as single BA for region. Texas RE ROS Presentation January 2009

Page 4 of 20 SAR-005, 006, and 007 Remove LSE Applicability ●Therefore, Texas RE Regional Variance is proposed to remove LSE Applicability from six NERC standards, MOD and EOP-002. ●MOD ERCOT as the single Planning Authority (PA) and Resource Planner (RP) provides the data required by MOD-017 and 018 to NERC and the Texas RE for the entire ERCOT Interconnection. The process for ERCOT to obtain the data from the market participants is in the ERCOT Protocols and Operating Guides. ERCOT has accepted responsibility for all requirements in these standards except for the TPs continued responsibility under MOD-018 to provide the metered data to ERCOT. Texas RE ROS Presentation January 2009

Page 5 of 20 SAR-005, 006, and 007 Remove LSE Applicability ●MOD ERCOT is the only TOP and PA for the ERCOT Interconnection, and as such, receives information directly from the TPs through their meters, because the DPs do not own meters in ERCOT. TPs in the ERCOT Interconnection are already registered for this standard and are currently performing the requirements of these standards, and ERCOT and the TPs accept responsibility for these requirements. ●EOP-002--Only ERCOT has the information available to it to initiate EEAs for the region and accepts responsibility for these requirements. ERCOT is already registered for this standard as the single BA and RC for the region. Texas RE ROS Presentation January 2009

Page 6 of Compliance Overview ●Organization  2008 transitional year – Texas RE grew from 9 to 25  Completed reorganization of Compliance group Auditing, Enforcement, Stakeholder Management  Five new compliance positions in 2009 (one already hired)  One new legal position in 2009 (2 total)  One new IT position in 2009 (2 total) Texas RE ROS Presentation January 2009

Page 7 of Compliance Overview ●Environment  Shift in relationship with NERC and other Regional Entities  Evolution of program and processes  Participation in multiple NERC committees (AOT, CIP, etc.)  Texas RE chaired the RCIG – national consistency  Improvement in communications with registered entities Texas RE ROS Presentation January 2009

Page 8 of Compliance Overview ●Work  Audit schedule completed 100% on time  Enforcement efficiency improved  Registration work load continued unabated  Statutory and non-statutory responsibilities continued to create synergies  Processes and quality improved Texas RE ROS Presentation January 2009

Page 9 of Compliance Overview ●Opportunities for Improvement in 2009  Automation Portal Document management Web site  Inter-region consistency  NERC leadership & guidance Texas RE ROS Presentation January 2009

Page 10 of Compliance Monitoring Methods ●Methods by which violations are identified:  Audits (on-site and off-site/table top)  Self Certifications  Data Submittals  Spot Checks  Self Reports  Complaints and Incident Reports  Events (System Disturbances)  Exception Reporting Texas RE ROS Presentation January 2009

Page 11 of Compliance Monitoring Methods (cont.) ●Audit  Performed per the Function requirements (most every 3 or 6 years; ERCOT ISO every year) Protocol audits coordinated with NERC Standards audits, but maintained distinctly separate ( ERCOT ISO, Qualified Scheduling Entities “ QSEs” with Resources, and Transmission Distribution Providers “TDSPs” with control centers audited every 3 years) ●Self certification  Each registered entity must annually self certify compliance (or non- compliance) with every actively monitored requirement of its applicable Function(s) each year in which an audit is not performed  May also be required at the request of Texas RE ●Periodic data submittal  Data is requested and reviewed by Texas RE, per NERC Standard requirements Texas RE ROS Presentation January 2009

Page 12 of Compliance Monitoring Methods (cont.) ●Spot Check  May be initiated at any time to verify or confirm self- certifications, self reporting, or data submittals  May also be initiated at random or in response to events, complaints, operating problems, or system disturbance ●Self Reports  Self reporting of violations is strongly encouraged  Self reporting of violations is a positive adjustment factor in the consideration of penalties or sanctions Texas RE ROS Presentation January 2009

Page 13 of Compliance Monitoring Methods (cont.) ●Compliance Violation Investigation (CVI)  Detailed investigation and review of possible Standard(s) violation(s) initiated in response to a system disturbance, event, complaint, or any other indication of a possible Standards violation  Generally led by Texas RE (except if involving ERCOT), but NERC may choose to lead any CVI  Confidential unless FERC directs otherwise (confirmed violations are public) ●Exception Reporting  Report provided indicating a Standard violation (e.g., a system operating limit exceeded). Some Reliability Standards require Exception Reporting Texas RE ROS Presentation January 2009

Page 14 of 20 Texas RE ROS Presentation January Events ●Events  Reliability Coordinator (ERCOT ISO) Responsibilities Operators provide “TRE Event Analysis Form” within 1 hour. ♦Single Page ♦Standard Form ♦Very Preliminary If additional information necessary (as determined by Texas RE), ERCOT ISO or other entity has 10 business days to produce an operations report. ♦More Detailed Respond to RFI’s and supply data related to other entities. File appropriate forms with NERC, DOE and Texas RE.

Page 15 of FERC Audit ●FERC Audit of Texas RE  First RFI completed in December 2008  First round of interviews completed January  Expected to last one year  Focus on processes and governance Texas RE ROS Presentation January 2009