RISK REGISTER Management & Engineering

Slides:



Advertisements
Similar presentations
Project management Information systems for management1 Project Management.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Effective Contract Management - Getting it Right! 24 th January 2007.
ITIL: Service Transition
Chapter 3: The Project Management Process Groups
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
PRM 702 Project Risk Management Lecture #28
What is Project Management? How does it affect how you do your job?
From Research Prototype to Production
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Next Doc Project Team: xxxxx Spring TitlePage Scope Statement Mission Statement3 Business Need4 Project Description5-6 Project Lifecycle Approach7.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Industry SDLCs and Business Climate. Justin Kalicharan Credentials Director and Senior Technology Officer Over 14 years of coding experience in various.
September 23, 2015 Sacramento, CA Frédéric DINGUIRARD PMR Expert Overview Presentation on Registry Procurement and Specifications Workshop “Building Registries.
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
Develop Project Charter
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an interactive process.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Project & Risk Management
Manufacturing contracts for RFQ
PRELIMINARY VERSION ESS RFQ CDR 2 TIME SCHEDULE, PROJECT RISKS, RAMI AND SAFETY Anne-Catherine CHAUVEAU8th and 9th december 2015.
What is project management?
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
ACCSYS Risk Management J. G. Weisend II Deputy Head of Accelerator Projects January 14, 2016.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.
H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
The LIFE Programme: the EU funding tool for the Environment and Climate Action Lorenzina Bruno, Senior Financial Officer EASME – C.1.6 LIFE NGO Kick-off.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Project Management PTM721S
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
ITIL: Service Transition
Project Cost Management
Project Management – PTM721S
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an iterative process as.
TechStambha PMP Certification Training
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Critical Factors in Managing Technology
CIS12-3 IT Project Management
SAP GRC EOH GRC Solutions Divisional divider Option 1.
F. Peauger (mainly for CM components)
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Quality assurance and Quality control organisation
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Presentation transcript:

RISK REGISTER Management & Engineering CEA/ESS Risk workshop| | Florence Ardellier Lund, 14th january 2016

Pour personnaliser le pied de page et la date : « Insertion / En-tête et pied de page » Personnaliser la zone de de pied de page Cliquer sur appliquer partout Content Présentation of the ESSI team Goals of the workshop meeting Risk register for ESSI management : RR1 Proposal for an action plan CEA/ESS Risk workshop

Presentation of ESSI team CEA/ESS Risk workshop

CEA to present its risks register including the mitigation plan goals of the meeting CEA to present its risks register including the mitigation plan CEA and ESS to share the risks analysis and coordinate the joint actions which are proposed. CEA to present the identified « transferred risks » The risk analysis will not be limited to the CEA perimeter: it shall identify external risks which may impact CEA contribution (Deliverables and engineering activities), but also ESS interfaces and ESS deliverables (in particular contribution from other partners).  CEA/ESS Risk workshop

Risk Register Management & Engineering Risk ID Type Risk Owner Risk Label Level (pre-mitigation) Mitigation Strategy / main actions (post-mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...")   Management / Interfaces with ESS (communication / reporting / validation) RR1-I1 Top level F Ardellier Organization chart is not symmetrical. ESS and CEA interlocutors not fully identified Uncomplete communication or at the wrong level Loss of information 64 SEVERE Management Plan (management matrix) Identify the responsible interlocutors from CEA point of view Decision workflow to set up and to validate 8 MINOR RR1-I2 WP level Insufficient availability of ESS and / or CEA managers or organizational problems Delays in decisions (CCB, reviews, options choices, expenses …) or in information exchanges Amendements (schedule, technical, costs) Periodical (monthly) managerial meetings with validated record of decisions Management / Safety RR1-S1 Applicable safety standards list changes during or after design (esp. manufacturing phases) Design not qualified, licensing compromised Rework, additional justifications (calculation, tests) 128 Safety rules list agreement between CEA/ESS before IKCA notification 2 LOW Management / Project baseline and monitoring (cost schedule/ risks) RR1-PC1 Initial estimate based upon experiences and analogy (offer is not a detailed estimate) leading to a weak project baseline. Lesson learnt Project variations impact the project baseline (cost and duration) PM monitoring no longer useful because variation issues impossible to fix, WP leader no more committed, changes … 32 MAJOR Management plan (baseline monitoring) - link with configuration management 16 RR1-PC2 Ambitious project / lack of margins Project objectives (technical, costs, schedule) difficult to reach Impact on project global performance (Eacc cavity, Peakpower coupler, … , all WP schedules …) Transfer to ESS  CEA/ESS Risk workshop

Risk Register Management & Engineering Risk ID Type Risk Owner Risk Label Level (pre-mitigation) Mitigation Strategy / main actions Level (post- mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...") Management / Procurements RR1-P1 WP level F Ardellier Bad financial health of main long-term contractors Main long-term contractors declared bankrupt Deliverables with lower performances; financial lost and re-contraction; delay for new procurements 32 MAJOR Double source opportunity analysis (Couplers, …), market survey 8 MINOR RR1-P2 Top level ERIC finalization and Invoicing process not clearly define. In-kind constraints No agreement on VAT refunding Project descoping 128 SEVERE Agreement set up close follow up 1 LOW RR1-P3 Procurement strategy not precised, market rules constraints No industry capitalization between prototyping and serie phases Overcost, process not optimized or not homogenous 64 Innovation partnership 2 Management / Project QA  RR1-Q1 C Cloué No efficient Document System Management between CEA and ESS (document identification number, validation workflow role definition … ) => technical document sharing is not reliable Technical data (inputs) used by CEA is not at the last issue or CEA document (output) not set as reference Possible technical interface issues Documentation management plan including validation workflow (by ESS and CEA) / I2I structuration compatible with ESS DMS + internal validation workflow 4 System engineering / Product management (Interfaces, Configuration management, Product QA ...)  RR1-EM1 V Hennion Lack of interfaces documents and validation process. Unclear definition of interfaces Problems inducing delay and extracosts at installation time Detailed scope definition . Interfaces specification 16 CEA/ESS Risk workshop

Risk Register Management & Engineering 1. Management : interface matrix Decisions workflow to set up Risk Label Level (pre-mitigation) Mitigation Strategy / main actions (post-mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...") Management / Interfaces with ESS (communication / reporting / validation) Organization chart is not symmetrical. ESS and CEA interlocutors not fully identified Uncomplete communication or at the wrong level Loss of information 64 SEVERE Management Plan (management matrix) Identify the responsible interlocutors from CEA point of view Decision workflow to set up and to validate 8 MINOR Insufficient availability of ESS and / or CEA managers or organizational problems Delays in decisions (CCB, reviews, options choices, expenses …) or in information exchanges Amendements (schedule,technical, costs) Periodical (monthly) managerial meetings with validated record of decisions Management, interfaces 1. Uncomplete communication or at the wrong level 2. Delays in decisions or in information and exchanges 2. Periodical managerial meeting with recorded decisions and actions CEA/ESS Risk workshop

Risk Register Management & Engineering 3. Design not qualified, licensing compromised 3. Agreement onafety rules and process to applied defined in the contract Management / Safety Applicable safety standards list changes during or after design (esp. manufacturing phases) Design not qualified, licensing compromised Rework, additional justifications (calculation, tests) 128 SEVERE Safety rules list agreement between CEA/ESS before IKCA notification 2 LOW Management, safety CEA/ESS Risk workshop

Risk Register Management & Engineering 4.Project variations impact the baseline (cost, duration, …) 4. Project variations impact the baseline (cost, duration, …) Risk Label Level (pre-mitigation) Mitigation Strategy / main actions (post-mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...") Management / Project baseline and monitoring (cost schedule/ risks) Initial estimate based upon experiences and analogy (offer is not a detailed estimate) leading to a weak project baseline. Lesson learnt Project variations impact the project baseline (cost and duration) PM monitoring no longer useful because variation issues impossible to fix, WP leader no more committed, changes … 32 MAJOR Management plan (baseline monitoring) - link with configuration management 16 Ambitious project / lack of margins Project objectives (technical, costs, schedule) difficult to reach Impact on project global performance (Eacc cavity, Peakpower coupler, … , all WP schedules …) 128 SEVERE Transfer to ESS    Management, project baseline and monitoring (costs- schedule / risks) 5. Project objectives (performances, time schedule, costs, ..) difficult to reach CEA/ESS Risk workshop

Risk Register Management & Engineering Management, procurement Risk Label Level (pre-mitigation) Mitigation Strategy / main actions Level (post- mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...") Management / Procurements Bad financial health of main long-term contractors Main long-term contractors declared bankrupt Deliverables with lower performances; financial lost and re-contraction; delay for new procurements 32 MAJOR Double source opportunity analysis (Couplers, …), market survey 8 MINOR ERIC finalization and Invoicing process not clearly define. In-kind constraints No agreement on VAT refunding Project descoping 128 SEVERE Agreement set up close follow up 1 LOW Procurement strategy not precised, market rules constraints No industry capitalization between prototyping and serie phases Overcost, process not optimized or not homogenous 64 Innovation partnership 2 6.Main long term contractors declared bankrupot 6. Double source opportunity analysis (Couplers, …), market survey 7. No agreement on VAT mandate 7. Close follow up for an agreement 8.No industry capitalization between prototyping and serie phases 8. Look for adapted process like innovative partnership CEA/ESS Risk workshop

Risk Register Management & Engineering Management, project QA 9.Documentation management plan including validation workflow (by ESS and CEA) / structuration compatible with ESS DMS + internal validation workflow Management / Project QA  No efficient Document System Management between CEA and ESS (document identification number, validation workflow role definition … ) => technical document sharing is not reliable Technical data (inputs) used by CEA is not at the last issue or CEA document (output) not set as reference Possible technical interface issues 64 SEVERE Documentation management plan including validation workflow (by ESS and CEA) / I2I structuration compatible with ESS DMS + internal validation workflow 4 MINOR System engineering / Product management (Interfaces, Configuration management, Product QA ...)  Lack of interfaces documents and validation process. Unclear definition of interfaces Problems inducing delay and extracosts at installation time 128 Detailed scope definition . Interfaces specification 16 MAJOR 9.Technical data (inputs) used by CEA is not at the last issue or CEA document (output) not set as reference 10.Detailed scope definition and interfaces definition 10. Unclear definition of interfaces CEA/ESS Risk workshop

Risk Register Management & Engineering Management, interfaces Risk Label Level (pre-mitigation) Mitigation Strategy / main actions (post-mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...") Management / Interfaces with ESS (communication / reporting / validation) Organization chart is not symmetrical. ESS and CEA interlocutors not fully identified Uncomplete communication or at the wrong level Loss of information 64 SEVERE Management Plan (management matrix) Identify the responsible interlocutors from CEA point of view Decision workflow to set up and to validate 8 MINOR Insufficient availability of ESS and / or CEA managers or organizational problems Delays in decisions (CCB, reviews, options choices, expenses …) or in information exchanges Amendements (schedule,technical, costs) Periodical (monthly) managerial meetings with validated record of decisions Management / Safety Applicable safety standards list changes during or after design (esp. manufacturing phases) Design not qualified, licensing compromised Rework, additional justifications (calculation, tests) 128 Safety rules list agreement between CEA/ESS before IKCA notification 2 LOW Management / Project baseline and monitoring (cost schedule/ risks) Initial estimate based upon experiences and analogy (offer is not a detailed estimate) leading to a weak project baseline. Lesson learnt Project variations impact the project baseline (cost and duration) PM monitoring no longer useful because variation issues impossible to fix, WP leader no more committed, changes … 32 MAJOR Management plan (baseline monitoring) - link with configuration management 16 Ambitious project / lack of margins Project objectives (technical, costs, schedule) difficult to reach Impact on project global performance (Eacc cavity, Peakpower coupler, … , all WP schedules …) Transfer to ESS    1. Management : interface matrix Decisions workflow to set up 1. Uncomplete communication or at the wrong level 2. Delays in decisions or in informations exchanges 2. Periodical managerial meeting with recorded decisions and actions Management, safety 3. Safety rules list and process to applied agreement before schedule notification 3. Design not qualified, licensing compromised Management, project baseline and monitoring (costs- schedule / risks) 4.Project variations impact the baseline (cost, duration, …) 4. Project variations impact the baseline (cost, duration, …) 5. Project objectives (performances, time schedule, costs, ..) difficult to reach CEA/ESS Risk workshop

Risk Register Management & Engineering Management, procurement Risk Label Level (pre-mitigation) Mitigation Strategy / main actions Level (post- mitigation) ("As a result of...") ("There is a risk that...") ("Resulting in...") Management / Procurements Bad financial health of main long-term contractors Main long-term contractors declared bankrupt Deliverables with lower performances; financial lost and re-contraction; delay for new procurements 32 MAJOR Double source opportunity analysis (Couplers, …), market survey 8 MINOR ERIC finalization and Invoicing process not clearly define. In-kind constraints No agreement on VAT refunding Project descoping 128 SEVERE Agreement set up close follow up 1 LOW Procurement strategy not precised, market rules constraints No industry capitalization between prototyping and serie phases Overcost, process not optimized or not homogenous 64 Innovation partnership 2 Management / Project QA  No efficient Document System Management between CEA and ESS (document identification number, validation workflow role definition … ) => technical document sharing is not reliable Technical data (inputs) used by CEA is not at the last issue or CEA document (output) not set as reference Possible technical interface issues Documentation management plan including validation workflow (by ESS and CEA) / I2I structuration compatible with ESS DMS + internal validation workflow 4 System engineering / Product management (Interfaces, Configuration management, Product QA ...)  Lack of interfaces documents and validation process. Unclear definition of interfaces Problems inducing delay and extracosts at installation time Detailed scope definition . Interfaces specification 16 6.Main long term contractors declared bankrupot 6. Double source opportunity analysis (Couplers, …), market survey 7. No agreement on VAT mandate 7. Close follow up for an agreement 8.No industry capitalization between prototyping and serie phases 8. Look for adapted process like innovative partnership Management, project QA 9.Documentation management plan including validation workflow (by ESS and CEA) / structuration compatible with ESS DMS + internal validation workflow 9.Technical data (inputs) used by CEA is not at the last issue or CEA document (output) not set as reference 10.Detailed scope definition and interfaces definition 10. Unclear definition of interfaces CEA/ESS Risk workshop

Risk Register Criticity matrix Management & ENGINEERING ESSI Management & Engineering - before mitigation 16 32 64 128 256   Very Likely (16) - 1 Likely (8) 4 3 Not likely (4) Unlikely (2) Not Credible (1) Negligible (1) LOW (2) MEDIUM (4) HIGH (8) VERY HIGH (16) ESSI Management & Engineering - after mitigation 16 32 64 128 256   Very Likely (16) - Likely (8) Not likely (4) Unlikely (2) 1 Not Credible (1) 2 Negligible (1) LOW (2) MEDIUM (4) HIGH (8) VERY HIGH (16) CEA/ESS Risk workshop

Mitigation Strategy and main actions Action responsible Who ? Risk ID Mitigation Strategy and main actions Action responsible Who ? Level of priority CEA ESS WP1-I1 To set up a management matrix identifying the responsible interlocutors Decision workflow to set up and to validate FAD ML 1 WP1-I2 Periodical (monthly) managerial meetings with validated record of decisions WP1-S1 Safety rules list agreement between CEA/ESS before IKCA notification CC To be completed WP1-PC1 Management plan (baseline monitoring) - link with configuration management VH WP1-P1 Double source opportunity analysis (Couplers…), market survey - WP1-P2 VAT Mandate : set up close follow up WP1-P3 Innovation partnership WP1-Q1 Documentation management plan including validation workflow (by ESS and CEA) / I2I structuration compatible with ESS DMS + internal validation workflow WP1-EM1 Detailed scope definition . Interfaces definition CEA/ESS Risk workshop

Thank you for your attention Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 xx xx | F. +33 (0)1 69 08 99 89 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019 DSM Irfu CEA/ESS Risk workshop