1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.

Slides:



Advertisements
Similar presentations
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Advertisements

PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
PHOBOS 22.5 & 62.4 GeV Cu+Cu Peter Steinberg Brookhaven National Laboratory March 23, 2005.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
PHOBOS Run-5 Wrap-up & Request for 400+GeV p+p Peter Steinberg Brookhaven National Laboratory March 30, 2005.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Measurement of the Double Longitudinal Spin Asymmetry in Inclusive Jet Production in Polarized p+p Collisions at 200 GeV Outline Introduction RHIC.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
High p T results from PHENIX Carla M Vale Brookhaven National Laboratory for the PHENIX Collaboration June
PHENIX DAQ RATES. RHIC Data Rates at Design Luminosity PHENIX Max = 25 kHz Every FEM must send in 40 us. Since we multiplex 2, that limit is 12 kHz and.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Low Mass Vector Mesons Nuclear Modification Factors in d+Au 200GeV Lei Guo Los Alamos National Laboratory PHENIX Collaboration.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Transverse Spin Physics at PHENIX
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
p0 ALL analysis in PHENIX
Presentation transcript:

1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009

Physics running week 9 of 10 It has been a good week Accumulated luminosity in good physics runs with ±30 cm vertex cut (~50% acceptance) is about 14.5 pb -1 –2X Run-6 p+p long. Polarized data set Last week we recorded 2.0 pb -1 So far in Run-9 p+p 200 GeV –315 G events sampled –8.3 G events recorded –365 TB of physics data > 0.5 Pbytes 200 GeV+500 Gev data sets 2

Outstanding Issues Is the yellow polarization dropping? June 23, Polarization numbers still seem to be varying outside errors at least in some of the polarimeters… may not be sure of polarization until after further polarimeter analysis… or is it intensity or orbit effect?

Outstanding Issues Rack room air conditioning The rack room air conditioner failed Friday night… –The main HVAC unit failed –2 smaller back-up units can not keep up Hanging on with doors open and fans blowing Could go off at any time Second compressor failure since March No redundancy June 23, ºF 70ºF

Summary RHIC+PHENIX performance in the last week has been very good Chronic HVAC problems in PHENIX persist. Need a long term solution. –Smaller problem with the compressed air feed from the RHIC tunnel that we need fixed. Is the yellow polarization OK, or is is there a degradation? Looking forward to a good upcoming week and the final 6 days of p+p s ½ = 200 GeV