Diesel Building Fire Damper Failing Closed Mike Walker TVA.

Slides:



Advertisements
Similar presentations
Landstown High School Governors STEM & Technology Academy
Advertisements

Circulating Water System
Extrusion-Based Processes
ADX 150 – Engine Repair ADX 170 – Climate Controls
Refrigerators.
RANGE GUARD / GAYLORD HOOD.
HVAC Commercial Ref.
Basic Refrigeration Cycle
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
Series I Pump and Prep Pump Prior to removing the head, rotate the flag on the top of the motor so the piston is fully retracted. Remove thumb nuts.
Fluid Power Systems Mill Creek High School Power and Energy.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Simple Pressure Control Valves
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Trevor Thompson Senior Project II Vermont Technical College Spring 2011.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Fire Extinguisher Redesign Maddie Burke Design Project Management Student Initiated Projects: R12900 Spring
Monitoring Vibration on Tunnel Fans Safety First The worlds developing infrastructure creates many technical challenges for engineering and construction.
HVACR416 - Design Humidification. Relative Humidity 1.Air in the home is artificially dried out when it is heated. 2.Because warm air expands, this expansion.
Actuators.
ELECRICAL CIRCUITS.
HVACR416 - Design Pressure Measurement Part 2. Pressure Measurement Several pressure measurements exist. They all measure the same things, the force of.
HVACR116 – Trade Skills Mechanical Drawings.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Welcome to. 2 Information Rich Event On around 1330 hours, facility workers smelled smoke Stopped work and called the Emergency Service Dispatch.
High Sensitivity Smoke Detection
Burners TRAining CEntre. RESIDENTIAL GAS BURNERS R D B R D B series GOALS: KEEP STRONG OUR POSITION ON RESIDENTIAL GAS BURNERS DEDICATED TO OEM’s MARKET.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Pneumatics.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
World Health Organization
HVAC- Body Works 1 Energy Analysis and Comfort Solutions Inc. Consumers – understanding how an HVAC system works.
1 HVAC122 - Gas Gas Valves. 2 Solenoid Gas Valves The solenoid gas valve is the simplest of all valves. This valve has an electrical magnetic coil which.
Control Theory Control System Objectives  Establish a final condition  Provide safe operation  Eliminate the human element  Assure economical operation.
Utility Engineers, PC.  Generation  Transmission  Distribution.
HYDRAULICS & PNEUMATICS
HEATING AND COOLING SYSTEMS
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Session 6 - Agenda BREAK Activity Est. Time 1. Agenda
BASIC ELECTRICITY AND MAGNETISM
Unit Twelve Pilot Operated Pressure Control Valves At first glance the diagram would appear to show three different valves but the box surrounding the.
Quick Installation – 1/4 Pressure Sensor
Fuel-Injection Systems
For system diagrams and component identification
Session 2: Saws, Part 2; Other Power Tools
Maria’s Restaurant Chapter 1 Section 4
Wega & Wega Power chilled beams
Design of the Injection Can
SEMINAR ON AIR CIRCULATION IN STENTERS
Tool removed during cycle Fault #2
DELTAK HEAT RECOVERY STEAM GENERATOR
Valves.
Figure 18.1 Typical port fuel-injection system, indicating the location of various components. Notice that the fuel pressure regulator is located on.
Hydraulic Pressure Control
Workbook Section.
Active Reciprocating Compressor Valve Assembly P16452
375DA 2½”-10”.
450DA 4”-10”.
Suspension Systems - 2 Topics covered in this presentation:
Pneumatic System Conditioning
Presentation transcript:

Diesel Building Fire Damper Failing Closed Mike Walker TVA

Diesel Generator HVAC  SQN has 4 diesel generators  Each Diesel generator has 2 fans for cooling  Cooling utilizes outside air  Once through system

Diesel Generator Building Air flow

Damper Configuration  Diesel generator room inlet dampers Fire damper and motor operated damper in series Fire damper is normally open and is closed by a spring Fire damper has a fusible link and a CO2 blow off clip Motor operated damper is normally closed and opens on fan start signal

Damper configuration  Diesel generator room outlet damper Fire damper only Fire damper normally open, and is closed by a spring Fire damper has a fusible link and a CO2 blow off clip

Fire Damper Failure  ON 6/6/08 the inlet fire damper for 2A-A DG failed closed with 1 fan in operation  HIGH Crankcase Pressure HIGH alarm actuated on the DG  Also resulted in DG lockout and LCO entry.  Discovered CO2 blow off clip was dislodged from the CO2 nozzle  Previous failure of CO2 blow off clip happened on 8/7/07 on fire damper for DG 1B-B

CO2 Blow OFF Clip

Installed CO2 Blow Off Clip and Nozzle

Typical Cross Tied Fire Damper Cross brace not at SQN Cross brace not at SQN To CO2 blow off clip Fusible link 4 separate damper sections at SQN are tied together

Troubleshooting  All Fire dampers on the inlet side were wired open to ensure DG operability  Vendor drawing indicated maximum load for CO2 clip was 25 lbs.  Pull test was performed on the fire damper assembly  31 pounds of force was required to hold the damper in the open position AH HA!!!!

Troubleshooting (continued)  Ensured blow off clip was fully installed  Pull test on blow off clip determined that it would hold at > 50 lbs of force ?????????  Also a history search determined that 2 similar failures have occurred on very small dampers. ?????????

Observation of installed CO2 Blow Off Clip

Discussions With Vendor  Vendor did not have any idea where large spacer came from  Normally the blow off clip body is bottomed out against the brace, and a conduit nut holds the device in place  Vendor agreed that a conduit nut could be used on both sides of the bracket to adjust the clip location

Conduit Nut on One Side  Vendor recommended installation

Final Modified Installation  Vendor Manual revision was made to allow 2 conduit nuts

Load on the Blow Off Clip Load angle must be within + 5 degrees

Bench Test Results  Testing with old spacer installed 0 degree angleClip released at 65 lbs 5 degree angleClip released at 50 lbs 10 degree angleClip released at 10 lbs

Bench Test Results  Bench testing with spacer removed and conduit nuts installed 0 degree angleClip did not release, measured > 100 lbs 5 degree angleClip did not release, measured > 100 lbs 10 degree angleClip did not release, measured > 100 lbs 20 degree angleClip did not release, measured > 100 lbs 30 degree angleClip released at 50 lbs

Conclusions  Testing provided assurance that the present clip should hold the damper open  The clip must be fully engaged  The old spacer can not be utilized

Root Cause Conclusion  The old spacers impede the blow off clip from being fully engaged with the CO2 release nozzle. Questions or Comments?