GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.

Slides:



Advertisements
Similar presentations
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Advertisements

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
Quality Management System
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, 2004 Performance & Safety Assurance 1 GLAST Large Area Telescope: Performance & Safety Assurance.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
From Research Prototype to Production
GLAST Large Area Telescope:
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Bill Raynor Naval Research Lab
EFW DFB Systems Assurance
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety Assurance Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Outline  Manpower Update  Significant Accomplishments  Nonconformance Report Summary  Issues and Concerns  Three Month Milestones  Cost Variance Analysis

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Manpower Update Quality Engineering –Two senior level Quality Engineers on board –One additional Quality Engineer should start 1/5/04 Source Inspection Support –In process of securing source inspection support for Tracker MCM production activities at Teledyne Electronic Technologies in Los Angeles –Anticipate start date of 1/26/04 EEE Parts Assurance Support –Request for proposal should be issued from SLAC Purchasing by 12/19/03 Quality Inspection Support –Plans in place for acquisition of two quality inspectors Staggered start dates – One to start end of January 2004 and another to start in April 2004

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Significant Accomplishments Validation of Lockheed-Martin inertial welding processes for heat pipes –Weld process is qualified by burst pressure testing, leak rate measurement and metallography of welded samples of each configuration –Each flight weld is pressure tested and leak tested to meet acceptance requirements –Will respond to open RFA with this new information Aluminum Grid manufacturing support –Prepared Readiness Review (MRR) presentation Summarizes QA efforts to date and defines quality plan for final grid manufacturing Addresses plan for quality surveys and process approval of plating vendors, witnessing/documenting special processes, etc. –Witnessed and documented rough machined grid heat treatment, straightening and flatness inspection and verified acceptable strength of test coupons –Reviewed and approved grid drawing and Tapemation Statement of Work Reviewed tray drawings and Tray Panel Assembly Procedure and provided comments

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Significant Accomplishments (Con’t.) Quality System Development –Developed Supplier Quality Assurance Requirements (SQAR) document, LAT-TD-02635, as flow down requirements for LAT flight hardware suppliers –Implemented flight hardware receiving process to ensure all flight hardware is delivered to Building 33 (LAT Receiving) for proper control and incoming inspection –Developing Bonded Stores processes for receipt, storage and inventory control of flight hardware –Secured various inspection equipment for cleanroom and bonded stores in Building 33 –Generated draft Incoming Receiving Inspection Criteria Document for flight hardware receivables –Created QA Bond Area for segregating discrepant flight hardware –Issued QA Acceptance/Rejection Stamps to QA personnel and instituted process for control of stamps

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Closed Nonconformance Reports NCR No.Open DateDescription of Non-ConformanceSummary of DispositionClose Date 1.178/1/03Non-approved epoxy used on Omnetic connectors Vendor remade connectors using approved epoxy 10/22/ /7/03Tracker Bias Circuit design violates IPC- 2221, Electrical Clearance NCR was written in error due misinterpretation of requirement 9/25/ /22/03Material Certification not received for Grid aluminum billet Certification was received from Alcoa and reviewed and approved 10/1/ /14/03Rough machines grid is only flat to.5”. Needs to be flat to.25” Grid was annealed, straightened, solution heat treated, and aged. Dimensional and strength requirement were met. 11/22/ /24/03Communication from one GTRC chip to the next does not work properly at design frequency of 20 MHz New GTRC flight design submitted11/24/ /1/03Two PWBs rejected by supplier were commingled with flight units PWBs were clearly marked solder samples and were not defective 11/6/ /1/03One PWB rejected by supplier was commingled with flight units PWB was clearly marked solder sample and was not defective 11/6/ /23/03Deformations on aluminum rollInadequate packaging at SLAC prior to shipment to Italy 11/19/03

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Open Nonconformance Reports NCR No.Open DateDescription of Non-ConformanceCommentsClose Date /2/03Tracker MCMs using nano-connectors with qualification testing not complete Parts have passed visual. Contact resistance, thermal cycling. Shock/vibration testing starting 12/ /23/03Tracker Tray Honeycomb material has various visual imperfections Inspection report for entire lot received 12/ /1/03DAQ PDU PMOS FET – SEM Inspection of wafer lot revealed worst case metallization of oxide step not meeting requirement Waiver request submitted to LAT PCB for review /26/03dc/dc regulators were inadvertently opened without using ESD precautions and in an uncontrolled environment LAT PCB will be performing additional analysis and evaluation of suspect parts /4/03Anomalous behavior was detected during the full-level lateral random vibration of Tracker EM Tower Cause understood. Design modifications are currently underway.

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Non-Conformance Reporting Activities Additional detail will be provided on NCR metrics as NCR population increases NCR information is being reported to GSFC GLAST Project Office Mission Assurance personnel LAT personnel have requested the ability to view NCR information on real-time basis –Efforts are underway to develop this capability Current list of open and closed NCRs does not include ACD and Calorimeter Subsystems –Request was made to Calorimeter Subsystem Manager to submit NCRs to LAT QA –GSFC is trying to provide LAT QA Manager access GSFC NCR system

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Issues/Concerns Open RFA on inertia welding process for heat pipes at Lockheed Martin –Previous response to RFA not accepted because limited details of Lockheed Martin’s process were submitted –Details of weld process qualification testing and in-process acceptance testing all flight welds have been summarized and will be submitted to GSFC to address this RFA Tracker Panel Assembly Procedure, LAT-PS-01584, does not adequately specify or detail all important aspects of tray assembly performed at Plyform –LAT QA will have to work with INFN to better define these requirements –LAT QA representative has been tied up with Tracker EM environmental test activities –Plyform process control documentation and activities need to be discussed

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Issues/Concern LAT Electronics SLAC built thermal/vacuum chamber –Thermal controller uses silicone fluid to heat/cool test stage inside the chamber. Current chamber set-up in Building 40 shows significant contamination of thermal controller surfaces and test area floor with this fluid. There is a high risk of contaminating Building 33 cleanroom and flight hardware with this fluid. –Plan needs to be developed for using and installing this T/V chamber in Building 33. Backlog of flight EEE parts that require incoming inspection –Some components utilized for MCM fabrication were dropped shipped to Teledyne Need to ensure incoming inspection of parts will be performed prior to start of flight production –Several shipments of EEE flight parts received in Building 33 have yet to be accepted by LAT QA

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Three-Month Milestones Complete additional source inspection of Lockheed Martin composite panel and heat pipe manufacturing areas – January 16, 2004 Formalize MRB procedure – January 2004 Complete Work Order requirements document and brief affected LAT personnel – January 31, 2004 Initiate Change Request for additional Quality Assurance Manpower – January 31, 2004 Source inspector on board at Teledyne – January 2004 Close out GSFC RFA on LM inertial weld process control issue – January 2004 Perform vendor survey and approve processes and quality systems of plating vendors – February 2004 Review quality system and production activities and perform source inspections related to the fabrication of Tracker bottom tray close- outs at Composites Optics – Through February 2004

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Three Month Milestones (Con’t) Finalize and release incoming receiving inspection document – February 13, 2004 Develop records retention and traceability process for supplier quality documentation – February 2004\ Perform vendor surveys of Electronic Subsystem assembly houses – March 2004

GLAST LAT ProjectMonthly Status Review – December 15, 2003 Cost Variance Analysis Cumulative CV = $290K –Management (CV = $47K) Labor & travel costs lower than plan –Quality Assurance (CV = $164K) $146K of variance due to delayed Stanford processing of subcontractor invoices. Actual expenditures in line with planning –Training (CV = $2K) –Systems Safety (CV = $0K) –EEE Parts Control Program (CV = $81K) Change request processed in November which transfers this back to Project Contingency