Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009.

Slides:



Advertisements
Similar presentations
Řešení vybraných modelů s obnovou Radim Briš VŠB - Technical University of Ostrava (TUO), Ostrava, The Czech Republic
Advertisements

Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
1 Failure modes, effects and rates and remote maintenance/downtime Introduction –Failure is defined as the ending of the ability of a design element to.
Structural Reliability Analysis – Basics
SMJ 4812 Project Mgmt and Maintenance Eng.
Reliability Extending the Quality Concept. Kim Pries ASQ  CQA  CQE  CSSBB  CRE APICS  CPIM Director of Product Integrity & Reliability for Stoneridge.
Reliability Engineering and Maintenance The growth in unit sizes of equipment in most industries with the result that the consequence of failure has become.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
FNSF Blanket Testing Mission and Strategy Summary of previous workshops 1 Conclusions Derived Primarily from Previous FNST Workshop, August 12-14, 2008.
Time-Dependent Failure Models
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Statistics and Probability Theory Prof. Dr. Michael Havbro Faber
3-1 Introduction Experiment Random Random experiment.
1 Fundamentals of Reliability Engineering and Applications Dr. E. A. Elsayed Department of Industrial and Systems Engineering Rutgers University
Unit III Module 4 - Hard Time Task
Introduction Before… Next…
Copyright © 2014 reliability solutions all rights reserved Reliability Solutions Seminar Managing and Improving Reliability 2014 Agenda Martin Shaw – Reliability.
Uncertainty analysis is a vital part of any experimental program or measurement system design. Common sources of experimental uncertainty were defined.
1 2. Reliability measures Objectives: Learn how to quantify reliability of a system Understand and learn how to compute the following measures –Reliability.
Division of Operation and Maintenance Engineering Division of Operation and Maintenance Engineering 1 Reliability Analysis of Switches and Crossings –
Software Project Management
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
Mercury Laser Driver Reliability Considerations HAPL Integration Group Earl Ault June 20, 2005 UCRL-POST
-Exponential Distribution -Weibull Distribution
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
Reliability Engineering
Software Reliability SEG3202 N. El Kadri.
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
1 6. Reliability computations Objectives Learn how to compute reliability of a component given the probability distributions on the stress,S, and the strength,
Reliability Models & Applications Leadership in Engineering
Chapter 9 Testing the System Shari L. Pfleeger Joann M. Atlee
Copyright © 2014 reliability solutions all rights reserved Reliability Solutions Seminar Managing and Improving Reliability 2015 Agenda Martin Shaw – Reliability.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Center for Radiative Shock Hydrodynamics Fall 2011 Review Assessment of predictive capability Derek Bingham 1.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
Glenn Research Center at Lewis Field Random Vibration Testing of Hardware Tutorial 1 Fatigue Life Assessment William O. Hughes/7735 Mark E. McNelis/7735.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Analytical Approaches to Evaluate Residual Cable Lifetime Module 4 Dr. John H. Bickel Evergreen Safety & Reliability Technologies, LLC.
L Berkley Davis Copyright 2009 MER035: Engineering Reliability Lecture 6 1 MER301: Engineering Reliability LECTURE 6: Chapter 3: 3.9, 3.11 and Reliability.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8-1 Chapter Eight Audit Sampling: An Overview and Application.
Starting point for generating other distributions.
Learning Simio Chapter 10 Analyzing Input Data
1 Module One: Measurements and Uncertainties No measurement can perfectly determine the value of the quantity being measured. The uncertainty of a measurement.
Advanced Software Engineering Lecture 4: Process & Project Metrics.
Assessment of Fusion Development Path: Initial Results of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego ANS 18 th Topical Meeting on the.
Chapter 31Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
Reducing Uncertainty in Fatigue Life Estimates Design, Analysis, and Simulation 1-77-Nastran A Probabilistic Approach To Modeling Fatigue.
Part.2.1 In The Name of GOD FAULT TOLERANT SYSTEMS Part 2 – Canonical Structures Chapter 2 – Hardware Fault Tolerance.
Rick Walker Evaluation of Out-of-Tolerance Risk 1 Evaluation of Out-of-Tolerance Risk in Measuring and Test Equipment Rick Walker Fluke - Hart Scientific.
Failure Modes, Effects and Criticality Analysis
Calculation of Software Failure Probability and Test Case Selection February 14, 2007 Kim, Sung Ho.
© 2016 Minitab, Inc. Reliability for Your Company's Survival Bonnie Stone, Minitab October 19,
Six Sigma Greenbelt Training
Technology Readiness Assessment (TRA)
Martin Shaw – Reliability Solutions
Discussions on Software Reliability
Modeling and Simulation CS 313
Product reliability Measuring
Martin Shaw – Reliability Solutions
ACCURACY IN PERCENTILES
The European Power Plant Conceptual Study Overview
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
RAM XI Training Summit October 2018
Martin Shaw – Reliability Solutions
Stress Directed Maintenance
Continuous distributions
TRL tables: power conversion and lifetime
Definitions Cumulative time to failure (T): Mean life:
Presentation transcript:

page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting April 2009

page 2 of 14 Previous efforts in ARIES focused on design improvements and reliability requirements Reliability “by design”, e.g. Minimize joining, locate welds in low radiation environment Fault-tolerant interfaces (e.g., leaky SiC inserts) Low pressure LM coolant Derating ( e.g., 90%  ) Maintenance techniques to improve “availability” Requirements specification via system studies “R&D needs” often omitted details on reliability growth Surprisingly, we didn’t describe reliability R&D very well in our TRL exercise The emphasis was on proof of performance, system integration and environmental relevance

page 3 of 14 Very little R&D have been done to quantify expected reliability, and some have concluded that extensive testing is needed in fusion nuclear devices Statistical arguments have been used to highlight the possibility of infinitesimal reliability and the need for many long test runs in major facilities A = Π a i If i is large (like 100,000), then any value of a i much less than unity will cause A to be very small Confidence levels can be established from the results of testing, depending on the assumed statistics of failure (Weibull, exponential, Poisson, log-normal, …) Requirements for test time have been derived this way. aiai iA.9910, , ,0005x10 –5

page 4 of 14 A typical hazard function includes a period of constant (random) failures characterized by an exponential distribution

page 5 of 14 Example of confidence intervals for test data assuming a constant hazard function Probability density : f(t) = (1/  ) exp(–t/  ) where  is the (constant) failure rate Most probable value: = (1/r)  (x i ) where x is the test time and r is the number of failures Confidence interval: where  =(1–confidence) Example case: 80% confidence interval (  =0.2): 10,500 ≤  ≤ 48,000 it 15,000 24,000 36,000 49, , ,000 (failures in red) Example test data

page 6 of 14 Modern “Reliability Engineering” suggests much more can be done now to quantify and improve reliability 1.Reliability program planning 2.Design for reliability 3.Failure Modes and Effects Analysis  A formal and systematic approach to identifying potential system failure modes, their causes, and the effects of the failure mode’s occurrence on the system’s operation. 4.Reliability modeling  “Parts stress modeling” (empirical counting of parts and failure rates)  “Physics of failure approach” (understanding failure mechanisms) 5.Reliability testing Elements of reliability engineering:

page 7 of 14 “Physics of Failure” approach to reliability modeling  Information to plan tests and to determine stress margins are identified.  Failure models are developed and used for new materials and structures as well as existing designs.  This approach involves several steps (Cushing et al, 1993 ):  Identify potential failure mechanisms (chemical, electrical, physical, mechanical, structural or thermal processes leading to failure), failure sites and failure modes.  Identify the appropriate failure models and their input parameters, including those associated with material characteristics, damage properties, relevant geometry at failure sites, manufacturing flaws and defects, and environmental and operating loads.  Determine the variability for each design parameter when possible.  Compute the effective reliability function.  Accept the design, if the estimated time-dependent reliability function meets or exceeds the required value over the required time period. proactively incorporates reliability into the design process by establishing a scientific basis for evaluating new materials, structures & technologies.

page 8 of 14 Stress-Strength Interference Method F(x)  Stress and strength can be measured independently.  Designs can be analyzed and improved to provide more “predictabilty”  Safety factors can be applied to reduce probability of failure. This is highly reminiscent of optics damage threshold statistics “Max of N” Probability Distribution Damage fluence Maximum laser fluence

page 9 of 14 Reliability testing is performed in stages (Dodson and Nolan 2007) 1. Reliability growth testing: design changes and improvement 2. Environmental stress screening: eliminate infant mortality failure by subjecting parts to conditions harsher than their operating point 3. Qualification testing: for “verification” of estimates 4. Acceptance testing: performed by the manufacturer and/or buyer. E.g., inspection, shake-down testing 5. I n each of these stages, different types of tests can be performed  Sequential testing  Truncated testing ( e.g., using exponential probability density)  Accelerated life testing

page 10 of 14 For any reliable technology, the time to gather failure data can become unreasonable Accelerated Testing is used…  To discover failure modes  To predict the normal field life from the high-stress lab life Models are used to transform accelerated test data to normal operating conditions  E.g., linear transformation of time scale  The shape of the failure distribution does not change due to acceleration Example: accelerated testing with exponential probability density Transform time: t o =  t , where t  is the time to fail under accelerated conditions f  (t) = (1/  ) exp(–t/  ) accererated failure transforms to f o (t) = (1/  ) f(t/  ) Transform test data f  (t) = (1/  ) exp(–t/  ) to A demonstration of accelerated testing: nearly identical slope of failure probability under two different stress conditions

page 11 of 14 Question: Is there work we can do in ARIES to better define reliability R&D needs 1.Describe a scientific methodology for reliability R&D  Establish a paradigm for treating reliability issues in OFES, akin to our TRL work  Develop a reliability “program plan” specific to fusion 2.Perform a failure modes and effects analysis, e.g. for a DCLL blanket 3.Perform reliability modeling  Use the physics of failure approach, rather than parts stress modeling 4.Develop an R&D plan for reliability testing  Describe stages of testing, opportunities for accelerated testing, details of how materials and component tests should be conducted

page 12 of 14 Conclusions Reliability is (almost) universally understood to be one of the most critical elements of commercially-viable fusion, yet little has been done to understand and improve reliability. The field of reliability engineering is mature and can be used to structure a meaningful R&D program. The ARIES Team has an opportunity to help define R&D needed to establish the credibility of fusion as a viable energy source. Our Team is the best venue to perform this type of study. Specific research tasks can be envisioned, with several contributors.

page 13 of 14 References Thomas Stadterman and David Mortin, "Physics of Failure for Making High Reliability a Reality,” U.S. Army Materiel Systems Analysis Activity (AMSAA), M. Cushing, D. Mortin, T. Stadterman and A. Malhotra, “Comparison of Electronics- Reliability Assessment Approaches,” IEEE Transactions on Reliability, Vol. 42, No. 1, December Reliability Engineering, Bryan Dodson and Dennis Nolan, Reliability Engineering Handbook, QA Publishing, Tucson AZ Allisandro Birolini, Reliability Engineering: Theory and Practice, 5 th Edition, Springer-Verlag Berlin 2007.

page 14 of 14 Other questions we might address How do inspection and shakedown testing affect reliability?  E.g., initial crack size is extremely important in crack growth  If modules are stress tested prior to installation and defective ones screened, then how does the reliability improve How much nuclear testing is really required?  If we understand material properties vs. neutron fluence (including all joints, welds, under all service conditions), then how much risk is involved in extrapolating to full components?