POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.

Slides:



Advertisements
Similar presentations
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
Advertisements

FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Energy Accounting and Need for Special Energy Meters under ABT Regime.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Scheduling of Collective Transactions Through Power Exchange
Hon’ble Commission has issued Interim order dated 19/ directing :
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
“ MERIT ORDER SCHEDULING AND
National Institute of Wind Energy(NIWE)
Presentation transcript:

POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES

ISSUES KV KAIGA – GUTTUR KV MADURAI – TRIVENDRUM D/C LINE 7.0 TALCHER – KOLAR HVDC KV KAIGA – NARENDRA D/C LINE 10.0 EVACUATION SCHEMES FOR NEW CENTRAL SECTOR GENERATING STATIONS 12.0 UNREQUISITIONED POWER OF NTPC STATIONS 11.0 KALPAKKAM – EVACUATION SCHEME

ISSUES (Continued …) 14.0 TALCHER – KOLAR INTERTRIP SCHEME 16.0 ALTERNATE PATH FOR EVACUATION OF TALCHER STAGE 2 POWER 17.0 INTER REGIONAL TRANSMISSION LINKS BETWEEN ER/WR AND SR 18.4 HIGH VOLTAGE CONDITIONS KAIGA – GUTTUR TRIPPING DETAILS 18.2 HIGH FREQUENCY CONDITIONS STOA – CHIKKODI – KOLHAPUR LINE

1 st meeting of TC of SRPC on 30 th Oct 2006

MVAR absorption at Sharavaty As per the requirement of grid, generators to generate/absorb reactive power. Cannot agree for objections of KPCL GT taps could be different for units Sharing of reactive power could be different Depending on seasons taps could be specified through system studies As long as reactive generation/absorption is within capability curves there should not be any problem Generators should vary excitation between plus or minus 5% GT terminal voltage/or limits as specified by manufacturers KPCL should cooperate with SLDC in maintaning voltages

Computation of Talcher STPS II Injection Revised IEGC –w.e.f Specific chapter on Inter –Regional exchanges Detailed paragraph on scheduling,operation of Talcher II -net injection of Talcher II Commercial meeting MOM: NTPC s made the request purely on technical merits without any commercial considerations Any philosophy would be acceptable to hem Acceptable for prospective revisions,if any

Computation of UI exchanges between SR-ER DETAILS TO BE GIVEN BY srinivas Our letter details to be incorporated

Computation of UI formulae for availability plf,for NLC station SRPCs agenda to be copied

COMPUTATION OF UI NLC TPS-II STATION

Method 1 NLC TS-II stage-1&2 : Mines Allocation from Stage -1 : 7.94 % Mines Allocation from Stage -2 : 5.95 % Net DC of Stage – 1 : A Net DC of Stage – 2 : B Anticipated Mines consumption from Stage-1: A/( )*7.94 = M1 Anticipated Mines consumption from Stage-2: B/( )*5.95 = M2 Total Anticipated Mines consumption : M1+M2 = AM Actual Mines consumption : MC Actual Ex-Bus Generation of Stage-I : C Actual Ex-Bus Generation of Stage-2 : D Net injection of NLC TS-II Stage-1 : C – (MC/AM)*M1 Net injection of NLC TS-II Stage-2 : D – (MC/AM)*M2

Method 2 NLC TS-II stage-1&2 : Anticipated Mines consumption from Stage-1: M1 Anticipated Mines consumption from Stage-2: M2 Total Anticipated Mines consumption : M1+M2 = AM Actual Mines consumption : MC Actual Ex-Bus Generation of Stage-I : C Actual Ex-Bus Generation of Stage-2 : D Net injection of NLC TS-II Stage-1 : C – (MC/AM)*M1 Net injection of NLC TS-II Stage-2 : D – (MC/AM)*M2

Method 3 NLC TS-II stage-1&2 : Mines Allocation from Stage -1 : 7.94 % Mines Allocation from Stage -2 : 5.95 % Actual Ex-Bus Generation of Stage-I : A Actual Ex-Bus Generation of Stage-2 : B Anticipated Mines consumption from Stage-1: (A*7.94/100) = M1 Anticipated Mines consumption from Stage-2: (B*5.95/100) = M2 Total Anticipated Mines consumption : M1+M2 = AM Actual Mines consumption : MC Net injection of NLC TS-II Stage-1 : A – (MC/AM)*M1 Net injection of NLC TS-II Stage-2 : B – (MC/AM)*M2

COMPUTATION OF AVAILABILITY & PLF OF NLC TPS-II STATION

Availability of NLC TPS – II Station has been carried out as given below: N Availability = x  DCi / { Nx IC x (100 – AUXn)(100-MINent)}% i = 1 DCi = Average declared capacity for the ith day of the period in MW N = Number of days during the period, IC = Installed capacity of the generating station in MW AUXn = Normative auxiliary consumption MINent = Percentage allocation of mines in the generating station specified by GOI

PLF of NLC TPS – II Station has been carried out as given below: N PLF = x  SGi / { Nx IC x (100 – AUXn)(100-MINent)}% i = 1 SGi = Average Scheduled Generation for the ith time block in MW N = Number of days during the period, IC = Installed capacity of the generating station in MW AUXn = Normative auxiliary consumption MINent = Percentage allocation of mines in the generating station specified by GOI

UI ACCOUNT FOR THE WEEK TO

Computation of UI Exchanges between ER - SR

The methodology adopted by SRLDC for computation of UI between ER-SR was based on the following stipulations made in IEGC (effective from ): The regional boundaries for scheduling, metering and UI accounting of inter-regional exchanges between ER & SR shall be as follows:  400 kV Bus couplers between Talcher-I and Talcher-II  400 kV East bus of Gazuwaka HVDC No attempt shall be made to split the inter-regional schedules into linkwise schedules (where two regions have two or more interconnections).

As regards to the UI computation of Talcher Stage II, the following provisions as stated in IEGC were also taken into consideration: For a clear demarcation of responsibilities and minimal to-and-fro coordination, the scheduling of Talcher-II shall be coordinated by SRLDC, and the 400 kV AC bus-couplers between Talcher-I (2x500 MW) and Talcher-II (4x500 MW) shall be treated as the interface between ER and SR …… The difference between the actual injection of Talcher II and the dispatch schedule shall constitute the UI of Talcher-II, for which payments shall be made from/into the UI pool account of Southern region operated by SRLDC, but at the UI rate corresponding to ER repeat ER frequency. The energy accounting for Talcher-II STPS shall be carried out by SRLDC While the dispatch schedule for Talcher-II shall be as advised by SRLDC, the actual generation at Talcher-II may be varied by station operators depending on ER frequency, as long as the resulting UI does not cause a transmission constraint in ER. In case of a transmission constraint being caused in ER by the UI of Talcher-II, ERLDC may advise Talcher-II to curtail its UI under intimation to SRLDC. Any such advise shall be immediately complied with by Talcher-II.

On going through the above clauses with respect to scheduling and UI computation in respect of Talcher Stage II vis-à-vis exchange and computation of UI between ER & SR, the following points require specific attention: Any UI exchange between ER & SR on the inter-regional links, viz. Gazuwaka HVDC back-to-back and 400 kV bus coupler between Talcher I and Talcher II is carried out depending on the frequency of both the regions and only with the consent of SRLDC/ERLDC control rooms. This is done in order to ensure that any such UI exchange is giving benefit to the constituents in both the regions and is not resulting into a negative residual in the IRE (Inter-Regional Energy) pool. However, in case of the UI exchange between Talcher II and ER the philosophy is different in the sense that the UI flow between Talcher II and ER though comes in the category of IRE flow, in controlling its direction and quantum SR generally has no role and how much UI would be maintained rests only at the discretion of Talcher II. In order to further elaborate this, it may be pointed out that there could be a situation when SR frequency is lower than ER frequency and UI flow in the direction from SR to ER is not desirable. However, even under such situation in case Talcher II finds that it is beneficial to push power to ER under UI (as long as its variable cost is lower than UI rate prevailing in ER), the station may do so irrespective of the frequency of SR and in case it is clubbed with the SR-ER (IRE) UI, a negative UI amount is generated between SR & ER. This case is illustrated with an example at Annexure-I.Annexure-I.

Whenever UI transactions are there between ER & SR, the net gain due to UI transactions (differentials generated in the IRE accounts) is distributed equally between ER & SR constituents. In case the UI of Talcher II with ER is also clubbed with the UI of SR, then the SR constituents do not get their equitable share and stand to lose. This is illustrated with examples at Annexure-II by considering a typical case of UI transaction from SR to ER. Annexure-II

It may therefore be seen that in view of the specific location of Talcher II vis-à-vis other ISGSs, the UI computation in respect of Talcher II is required to be followed in a manner which would be based on the IEGC provisions as stated above and at the same time it would not defeat the basic UI philosophy which stipulates that the UI exchange between two agencies/ regions should benefit both the parties. In order to achieve this, whenever UI transactions are there in respect of Talcher II with ER, the UI calculations have to be carried out as per the IEGC provisions (clause of IEGC) i.e. at ER frequency. However as per this clause, as the payment for this UI to Talcher II has to be made from the UI pool account operated by SR, it is natural that SR must get the equivalent amount from the ER. Furthermore, as no differential has been generated in SR/ER on this account, there cannot be any sharing of accumulated differential UI and therefore the possible viable approach within the framework of IEGC regulations could be to treat this transaction as a UI only between Talcher II and ER and only while accounting these amounts (as it is) can be reflected in the SR weekly UI account, as elaborated under the case in Annexure-II (Methodology 2).

ER Freq = 49.6 Hz UI Rate= Rs.3/ Talcher Stage II Gen: 1600 Schd: MW SR Talcher Stage I & II I/C SR Freq = Hz UI Rate= Rs.5/ UI (SR to ER) 0 MW 0 MW ER 0 MW UI (from SR to ER) Annexure -I CASE – 1 UI from Talcher Stage II to ER when SR frequency < ER frequency Base Case: Talcher Stage II UI =0 MW Base Case +Talcher Stage II 50 MW UI (Talcher Stage 2 actual Generation = 1650 MW against Schd. of 1600 MW) ER Freq = 49.6 Hz UI Rate= Rs.3/ Talcher Stage II Gen: 1650 Schd: MW SR Talcher Stage I & II I/C SR Freq = Hz UI Rate= Rs.5/ UI (SR to ER) 0 MW 50 MW ER 0 MW UI (from SR to ER) Issues  Considering the variable cost of Talcher Stage II as around 80 paisa it would be beneficial for Talcher Stage II to generate positive UI as the ER UI rate is more than its variable cost.  For every unit of power exported to ER, Talcher Stage II would get a price of Rs 3/Unit.  However if the UI by Talcher Stage II to ER is considered as UI from SR to ER, then it would be a case of –ve UI  For every unit of power exported, SR would expect a price of Rs 5/Unit while ER would be able to give a price of Rs 3/Unit only.  Such transactions accumulated during that periods could cause commercial implications.  In order to address this issue,the UI transactions can be considered between Talcher Stage II and ER, however the accounts can be routed through SR.

Para 8 (ii) The beneficiaries will have full freedom for negotiating any transaction for utilisation of theircapacity shares. In such cases, the beneficiary having allocation in the capacity of the generating station will be liable for full payment of capacity charges and energy charges (including that for sale of power under the transactions negotiated by them) for all its scheduled and unscheduled transactions from its capacity share. (iii) If there is any capacity which remains un-requisitioned during day-to-day operation, RLDC, shall advise all beneficiaries in the region and the other RLDCs so that such capacity may be requisitioned through bilateral arrangements with the concerned generating company/beneficiary(ies) under intimation to the RLDC. SCHEDULE 1 OF ABT ORDER DATED Cont..

FINAL REGULATIONS : TERMS & CONDITIONS OF TARIFF 26th MARCH 2004 PARA-30. Billing and Payment of Capacity Charges: (ii) The beneficiaries shall have full freedom for negotiating any transaction for utilisation of their capacity shares. In such cases, the beneficiary having allocation in the capacity of the generating station shall be liable for full payment of capacity charges and energy charges (including that for sale of power under the transaction negotiated by him) corresponding to his total allocation and schedule respectively. (iii) If any capacity remains un-requisitioned during day-to-day operation, the Regional Load Despatch Centre shall advise all beneficiaries in the region and the other Regional Load Despatch Centres so that such capacity may be requisitioned through bilateral arrangements either with the concerned generating company or with the concerned beneficiary(ies) under intimation to the Regional Load Despatch Centre. The information regarding un-requisitioned capacity shall also be made available by the Regional Load Despatch Centres through their respective websites.

Bifurcation of Energy to Discoms Responsibility of SLDCs as per clause of IEGC Matter taken up with SLDCs. Karnataka SLDC issuing the bifurcation to ESCOMs APPCC is doing for AP state discoms No-need for RLDCs to do this activity

Reactive charges on Hossur- Yerrandahally line Amicably setteled between TNEB,KPTCL