GLAST LAT ProjectMarch 24, 2003 6E Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 6E: MCM Assembly Gamma-ray.

Slides:



Advertisements
Similar presentations
Tracker SSD Ladder Preproduction Review Alessandro Brez Robert Johnson.
Advertisements

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Electronics Design and.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mini-Tower test results
Preproduction Status & Results
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Overview Parts and Materials Teledyne Electronics Technologies –Right-angle-interconnect assembly This is the only non-standard process. The long, narrow shape of the board and large number of ICs is also unusual to Teledyne. –Connector mounting and soldering of SMT parts –Die attach –Wire bonding –Electronics testing –Wire-bond encapsulation –Conformal coating SLAC –MCM acceptance testing and burn-in

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS MCM Parts and Materials Teledyne handles receiving of parts and the required traceability, using their internal systems and procedures. PWB (LAT-DS-00077) manufactured to spec LAT-PS by Young Electronics. Pitch-adapter flex (LAT-DS-00370) manufactured to spec LAT-PS by Tycho. Nano connector receptacles and connector savers from Omnetics. Polyfused procured from Raychem to spec LAT-PS HV capacitors procured from Novacap to spec LAT-PS Standard QML SMT capacitors and resistors. GTFE and GTRC ASICs, tested, lapped, diced, visually inspected (see presentation 5D). Approved adhesives, encapsulants, and conformal coating.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Pitch Adapter Installation Custom tooling developed by Teledyne Electronic Technologies. Mount the blank PWB with machined radius to an aluminum plate that it remains with throughout MCM fabrication. Mount the plate+PWB in the bonding fixture.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Pitch Adapter Installation Screen print epoxy adhesive onto the flex circuit with a motorized screen printer (not shown). Align the flex circuit on the fixture, with tooling holes over pins.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Pitch Adapter Installation Place clamping pieces over the flex circuit. Bend and allow to cure.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Pitch Adapter Installation A bonded flex circuit is shown below before trimming. The assembly is installed in a cutting jig (not shown), which trims the circuit at both ends with a rolling blade (pizza cutter). The rolling blade cuts cleanly through the 1552 narrow traces.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Soldering The two connectors are hand soldered. Solder paste is put on the pads with a robotic volumetric dispenser (a silkscreen cannot be used because of the MCM raised edge). Automated pick-and-place of SMT parts, followed by IR reflow. Attach connector savers, which remain in place until tower assembly. Plug into power supplies to check for shorts and leakage current.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Die Attach and Wire Bond Automatic adhesive dispensing (conductive adhesive on gold pads). Automated pick-and-place of the ICs. Cure at 85°C, to protect the polyswitches and minimize warping. Automatic wedge bonding with 25-micron aluminum wire. –Setup and destructive testing on extra MCM PWB+Flex. –Wire bonds from IC to PWB, IC to IC, IC to flex, and PWB to flex. An EM MCM completed up through the wire-bond stage. (This one is shown in an opened storage/shipping container, not on the assembly jig.)

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Detail of an EM MCM, at One End Nanonics Connector Pitch-adapter flex circuit 90° radius GTRC ASIC GTFE ASIC Polyswitch Grounding screw hole Before wire-bond encapsulation and conformal coating

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS MCM Functional Test Complete functional test at Teledyne before die encapsulation. –Test all register and memory locations –Test all I/O functions, including LVDS bias levels –Test all inter-chip communication –Check power consumption –Test all amplifiers by charge injection and test the trigger output –Test for excessive noise or instabilities A non-functional IC can be replaced at this point, if necessary. VME with COM Card and ADC Frequency Counter Adjustable Clock PC MCM DUT Interface Card (with cover removed)

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS Encapsulation After testing, the MCM returns to the robotic adhesive dispenser to encapsulate all wire bonds and ICs in a black hard epoxy. Cure at 85°C. The pitch-adapter pads for wire-bonding to the SSDs and the grounding holes are masked, and conformal coating is sprayed on. After curing, the MCM is removed from the aluminum assembly jig and fastened into the black ESD-safe plastic storage container. The connector savers also are fastened to the container, which is then sealed into an anti-static bag for storage and shipping. The MCM is not removed from the storage container until it is ready to be mounted onto a tray.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS EM MCM-Assembly Experience Several problems were encountered that have required improvements in designs and procedures. See LAT-TD for a complete listing of the issues and the lessons learned. Most issues are small details being resolved to improve manufacturing and quality. The two major issues were –The pitch-adapter flex design demanded too much alignment accuracy when bonding to the PWB. This has been resolved by extending the traces in the design (Teledyne has no trouble trimming them cleanly), but the problem resulted in the loss of function in a couple of ladders in the Engineering Model. –Most EM MCMs required replacement of one or more ICs after the initial test. This was caused by inadequate testing of the ICs on the wafers. The wafer probing system has since been completed and improved to resolve this problem. See Presentation 5D. The test software is being improved to speed up identification of a bad IC. We must be prepared to replace some ICs before encapsulation as efficiently as possible, but we also will strive to minimize this procedure.

GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS MCM Assembly QA Provisions Only approved parts will be used in the MCM assembly. Teledyne will receive and control parts and ensure proper traceability of all parts & materials. Teledyne has prepared a document of procedures specific to this project. It references all of their relevant standard internal procedures. Replacement of defective ICs before encapsulation will be included but only allowed one time maximum per IC site. Nonconformance reporting will be included. (UCSC personnel will also be on site for the electrical testing.) N. Virmani had a full day meeting with the Teledyne QA manager and will review all of the internal procedures and prepare a summary for GSFC for approval. Teledyne has provided us with copies of their QA documents for review. A Production Readiness Review will be held at Teledyne prior to the start of flight MCM production and following completion of a pilot run of MCMs.