UI POOL FINANCIAL SETTLEMENT & PAYMENT SECURITY OPTIONS.

Slides:



Advertisements
Similar presentations
BUSINESS ACQUISITIONS THE ACQUISITION AGREEMENT: General Introduction to M&A Agreements AND PURCHASE PRICE ©2010 Joseph D. Lehrer.
Advertisements

Rule Changes In a chapter 15 case, the debtor must state the country of the debtor's main interest and list each country in which a case involving.
Integration of Physical and Financial risk in Australia’s National Electricity Market Les Hosking Managing Director and CEO NEMMCO.
Trade Finance & Factoring
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
Ontario Electricity Support Program
1 Reduction in Cure Period CWG/MCWG ERCOT Public December 16, 2013.
NACBA 2012 Fall Workshop Jill Michaux Cathy Moran.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Transfer EntriesRTI Jammu1 Transfer Entries. RTI Jammu2 Session Overview Transfer Entries required to: Correct errors of classification in initial accounts.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Chapter 6 专业 PPT/ 商演示设计制作 Payment Methods - Bank guarantee and standby credit.
Ontario Electricity Support Program Webinar – LDCs and USMPs March 30, 2015.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
RISK IDENTIFICATION IN PAYMENT METHOD. OVERVIEW OF FINANCING METHODS: Risk Identification and Mitigation –Cash in Advance When It is Used Risk to Importer.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Personal Finance Final Exam v3 Personal Finance Final Exam JEOPARDY.
Customer Service Standards
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Interest on Loans Section 6.8. Objectives Calculate simple interest Calculate compound interest Solve applications related to credit card payments.
Financing International Trade 25 Lecture Chapter Objectives To describe the methods of payment for international trade; To explain common trade.
Billing, Collection and Disbursement Procedures
Surety Bonds Managing the Risk of Contractor Default.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
BANKING REGULATION ACT,1949 & THE BANKING OMBUDSMAN SCHEME,1995.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
B13: I can find the new balance on a credit card statement.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Terms of payments of “Goodfellow” By: Gulnoza Akbarova.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
Commercial Banks.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Pre-test.  A. Your age  B. The length of time you have had the card  C. The amount of money you owe on your credit card  D. The terms and conditions.
To pay fees online, key the shown address into your internet browser. Once website for eSchool Payments has loaded, press the Proceed to Registration arrow.
MONETARY POLICY “Monetary Policy is defined as the setting of interest rates, in order to control the quantity of credit and money supply, to influence.
HR Processor Verifies Payment of Cash Awards By NFC Sign on to NFC.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Accounting (Basics) - Lecture 6 Provisions and contingencies.
1. Financial mathematics  Compare differences between credit cards and debit cards  Calculate the simple interest for one billing cycle  Express a percentage.
How to fill out the Parent’s Financial Statement Section 3 – Deductions.
Investment Protection For Today’s Construction Lender.
Trade Finance: Risks and Rewards. Export Finance Adds Complexity More payment options More Risks Political Risks War is not the only political risk! Payment.
Proposed Amendments to Passenger Related CARs 1. CAR on Refund of Air Tickets 2.
Distribution Commercial Group Billing & Collection Management and Remedies Richard Smith Chair- EA Distribution Commercial Group.
Loan Against Property At Best Interest Rates Rubique.
1 Press Ctrl-A ©G Dear 2011 – Not to be sold/Free to use Interpreting Credit Card Statements Stage 6 - Year 12 Applied Mathematic [
国际商务英语口语 Module 2 Payment. 话题切入用语  Now let’s get down to business. 让我们 方归正传吧。  Yes, let’s start. 好,我们开始吧。  Shall we start/make a start? 我们可以开 始了吗?
Low-Income Energy Assistance Program (LEAP) Lenore Dougan, Policy Advisor Regulatory Policy Ontario Energy Board Presentation to the Rental Housing Advisory.
Open Access.
Congestion regulations
IN INTER-STATE TRANSMISSION
Money Claims and Other Issues
Please attach a voided check
Please attach a voided check
Presentation transcript:

UI POOL FINANCIAL SETTLEMENT & PAYMENT SECURITY OPTIONS

IEGC – Complimentary Commercial Mechanism Para 5 - Payment of UI charges shall have a high priority and the concerned constituents shall pay the indicated amounts within ten(10) days of the statement issue. Para 7 -If payments, against the above UI charges are delayed by more than two days i.e. beyond twelve(12) days from statement issue, the defaulting constituent shall have to pay simple 0.04% for each day of delay.

MITIGATING OPTIONS/PAYMENT SECURITY MECHANISMS Physical Disconnection of feeders at RLDC level. Petition to CERC –For Mitigation of dues. –For penal measures under Section 146 & 149 of Electricity Act Appropriation of the long due arrears from the Central Plan Assistance to the defaulting States. In the form of Letter of Credit (LC) PRESS ESC