Performance Evaluation and Using Variances Chapter M6.

Slides:



Advertisements
Similar presentations
Chapter 11 Standard Costs and Variance Analysis
Advertisements

CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Standard Costing and Variances
Standard Costing: A Managerial Control Tool
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
ACTG 321 Agenda for Lecture 14
Using Variances under Standard Cost System
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Prepared by Debby Bloom-Hill CMA, CFM. Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Standard Costing and Variance Analysis
Chapter 7: Standard Costing and Variance Analysis
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
23 Performance Evaluation Using Variances from Standard Costs
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Flexible Budgets and Standard Costs
Chapter 21 Flexible Budgets and Standard Costing.
1 Module 22 Standard Costs and Variance Analysis.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Standard Costs and Operating Performance Measures
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
Controlling Manufacturing Costs: Standard Costs
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
1 Click to edit Master title style Performance Evaluation Using Variances From Standard Costs 7.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 2 – Understanding How Standards are Used in Budgeting.
Performance Evaluation
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
1 Budgeting as a control mechanism 1. Budgeted levels are the standards to follow in operation 2. Variance evaluation for performance measurement A variance.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
ACC3200 STANDARD COSTING.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 3 – Computing Direct Materials and Direct Labor Variances.
Flexible Budgeting Chapter 07, 08
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.
Chapter 22. Prepare a flexible budget for the income statement.
Standard Costing and Variance Analysis
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
20 Monitoring Performance in Cost, Profit and Investment Centers
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
MANAGEMENT ACCOUNTING
Foundations and Evolutions
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Performance Evaluation Using Variances from Standard Costs
© 2017 by McGraw-Hill Education
AMIS 212 Introductory Managerial Accounting
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
© 2017 by McGraw-Hill Education
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

Performance Evaluation and Using Variances Chapter M6

Standards Performance goals used for all three manufacturing costs –Direct materials –Direct labor –Factory overhead Standard cost systems –Allows management to determine how much of a product should cost and how much it does cost and the difference

Terms Standard cost –What it should cost Actual cost –What it does cost Variance –Difference –Favorable or unfavorable Standards –Theoretical –Currently attainable or normal standards Budgetary performance evaluation –Summarizes actual cost, standard amounts at current production level and differences

Example Mfg CostsActual CostStandard cost at actual volume Variance- favorable or unfavorable Direct materials $40,150$37,500$2,650 Direct Labor $38,500$36,000$2,500 Factory overhead $22,400$24,000($1,600) Actual volume is 5,000 units

Direct Materials Variance Price variance = –(actual price – std price) X actual Quantity Quantity variance = –(Actual quantity – std quantity) X std price Total direct materials variance = –Price variance + quantity variance

Example 2 Material used in the production of Product Z has a standard cost of $3 per lb. And standard use of 10,000lbs. Actual records show 15,000 lbs. used with an actual cost of $2.50 per lb. Computer the variance

Example 2: Price variance = –(AP – SP) X AQ –(2.50 – 3.00) X 15,000lbs –$(7,250) favorable variance Quantity variance = –(AQ – SQ) X SP –(15, ,000) X $3 –$15,000 unfavorable variance Total variance –$(7250) + $15,000 = $7,750

Example 3 Material used in the production of product D has a standard cost of $5 per lb. and a standard use of 2 lbs per units produced. Production of 5,000 units occurred during the period. Actual records show 9,000 lbs. used with an actual cost of $6 per lb. Compute the direct material variances

Example 3: Price variance = (AP-SP) X AQ (6 – 5) X 9,000 = $9,000 unfavorable Quantity variance = (AQ-SQ) X SP (9000 – 10,000) X $5 = $5,000 favorable Total –Unfavorable $9,000 –Favorable 5,000 –Total $4,000 unfavorable

Direct Labor Variances Rate variance –(Actual rate – Std rate ) x Actual hours Time variance –(actual hrs – std hrs) X Std rate Total variance –Time + Rate

Example 4 Factory records show that each product produced requires 3 direct labor hours. Production during the period consisted of 10,000 units with 29,500 hours of labor used. Labor has a standard cost of $10 per hour and actual cost of $11 per hour. Compute the direct labor variances

Example 4: Rate variance = (AR – SR) X Ahrs –(11 – 10) X ( 29,500) –$29,500 unfavorable Time variance + (Ahr – Shr) X SR –(29,500 – 30,000) X 10 –$5,000 favorable Total –$29,500 unfavorable + $5,000 favorable –$24,500 unfavorable

Factory overhead variance Determine the impact of changing the production on fixed and variable factory overhead cost Standard factory overhead cost rate =Total budget cost at 100% capacity/Standard hours at 100% capacity Variable costs per unit –Total variable factory overhead – Total hours

Example 5: Percent of normal capacity80%90%100%110% Units produced DLH (.8 per unit) Budgeted F/O Variable costs Indirect factory wages$8,000$9,000$10,000$11,000 Power and light$4,000$4,500$5,000$5,500 Indirect materials$2,400$2,700$3,000$3,300 Total variable costs$14,400$16,200$18,000$19,800 Fixed costs Supervisory salaries$5,500 Depreciation$4,500 Insurance$2,000 Total Fixed cost$12,000 Total factory overhead$26,400$28,200$30,000$31,800

Example 5: Factory overhead variance Step 1: get the following information –Standard F/O cost rate = Total budget cost at 100% capacity Standard hrs at 100% capacity $30,000/5,000 = $6 per hour –Variable cost per unit at 100% $18,000/5,000 = $3.60 per hour –Fixed costs per unit at 100% $12,000/5,000 = $2.40 per hour

Variances for Factory Overhead Controllable variance –Deals with variable cost –Actual variable F/O –Minus Budget Variable F/O at actual –Equals Variance Volume Variance –Deals with fixed costs

Example 5: Using the information in the table assume that actual production is 80% of capacity. Actual variable costs are $16,000 Actual Var F/O $16,000 Budget 14,400 Variance 1,600

Volume variance 100% capacity direct labor hours -standard direct labor hours at actual Unused capacity X standard fixed overhead rate Volume variance

Example 7: Using the information on Western Rider assume actual production is 80% capacity and compute volume variance 5,000 DLH -4,000 DLH 1,000 DLH X $2.40 per DLH $2,400 volume variance