Lecture 51 Project Costing Lecture 52 Objectives Define economic feasibility Identify the cost considerations that analysts consider throughout the SDLC.

Slides:



Advertisements
Similar presentations
Reasons for Evaluating Training Companies are investing millions of dollars in training programs to help gain a competitive advantage. To justify the costs.
Advertisements

ICS 442 Software Project Management
Preparing the Systems Proposal CIS458. Last Class Project outline –Documents and reports Database Application Lifecycle –Database planning, system definition,
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Systems Analysis & Design 7 th Edition Systems Analysis & Design 7 th Edition Toolkit 3.
To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.
Lesson-23 Feasibility Analysis and the System Proposal
System Analysis and Design
SYS364 Feasibility and Cost Analysis. Today’s Agenda  Feasibility and Cost Analysis Tools  Understanding Costs and Benefits  Payback Analysis  Return.
Moving from Analysis to Design
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 feasibility 1 why address feasibility? to answer the questions... can the project be done.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Initiating and Planning Systems Development Projects
ISMT221 Information Systems Analysis and Design
Project Estimation Describe project scope, alternatives, feasibility.
Initiating and Planning Systems Development Projects.
Chapter Extension 21 Financing and Accounting for IT Projects © 2008 Pearson Prentice Hall, Experiencing MIS, David Kroenke.
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 3.
The Analyst as a Project Manager
Feasibility Analysis Chapter 3
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
Feasibility Study: Economic feasibility Technical feasibility
Chapter 5 Initiating and Planning Systems Development Projects
Switch off your Mobiles Phones or Change Profile to Silent Mode
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Chapter 5 Initiating and Planning Systems Development Projects
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
The Systems Analysis Toolkit
Systems Analysis – ITEC 3155 Feasibility Analysis
Considering the Costs of MUS Interventions. Direct Costs v. Opportunity Costs Direct Costs Expenditures and investments to achieve a particular outcome.
Project Feasibility Feasibility is the measure of how beneficial or practical the development of an information system will be to an organisation.
The chapter will address the following questions:
G045 Lecture 05 Feasibility Study (Task Di) Mr C Johnston ICT Teacher
Chapter 5 : Initiating and Planning Systems Development Projects.
Financial Project Metrics in Feasibility Study
Systems Analysis and Design Fourth Edition Introduction  A project is economically feasible if the future benefits outweigh the costs  The Systems Analyst’s.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Moving from Analysis to Design.
Component 4: Introduction to Information and Computer Science Unit 9/Part f: Components and Development of Large Scale Systems.
CHAPTER 13 Acquiring Information Systems and Applications.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Project Planning Activities Project Schedule Risks Management and Project Feasibility Financial Calculations Tangible.
Feasibility Study and Feasibility Analysis. Feasibility Study: Describes and evaluates the candidate systems and helps in the selection of best system.
Chapter 5 Initiating and Planning Systems Development Projects MIS 215 System Analysis And Design.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
BIS 360 – Lecture Four Ch. 5: Identifying and Selecting Projects
Information Technology Economics
1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.
CS211 Slide 10-1 ADCS 21 Feasibility and Cost Analysis Tools Project Management Tools Alternative System Development Methodologies (Chapter 10) Tools for.
© 2007 Pearson Education Canada Slide 4-1 Cost Management Systems 4.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph.
5. Planning Phase System Analysis And Design Program: BSCS II (Advent Semester – 2014) Lecturer: Rebecca Asiimwe
Feasibility Analysis for a Software Project Dr. Pedro Mejia Alvarez Seccion de Computacion, CINVESTAV-IPN.
PART 2 Information Systems Development. LEARNING OBJECTIVES Systems Development Life Cycle Application Development Methodologies Project Management Systems.
IT Project Management MS Sumayya Ajaz Lecture 9. Programme Management Individual projects as components of a programme within the organization. Programme.
CHAPTER 13 Acquiring Information Systems and Applications.
BTS730 – Systems Analysis and Project Management Cost Management.
Software Engineering Lecture # 1.
Slide 1 Software Construction Software Construction Lecture 3.
Accounting systems design & evaluation 9434SB 18 March 2002.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation.
Project Estimation Describe project scope, alternatives, feasibility.
IS Development Methodology
THE FEASIBILTY STUDY LECTURE-5.
Martha Grabowski LeMoyne College
Systems Planning: Project Feasibility
Introduction to Projects
COST & BENEFIT ANALYSIS (CBA)
Presentation transcript:

Lecture 51 Project Costing

Lecture 52 Objectives Define economic feasibility Identify the cost considerations that analysts consider throughout the SDLC Describe cost-benefit analysis methods

Lecture 53 Introduction A project is economically feasible if the future benefits outweigh the costs Cost-benefit analysis is performed when –Conducting a preliminary investigation –Evaluating a project –Making recommendations to management

Lecture 54 Describing Costs and Benefits Cost classifications –Tangible and intangible costs –Direct and indirect costs –Fixed and variable costs –Developmental and operational costs

Lecture 55 Describing Costs and Benefits Tangible and intangible costs –Tangible costs have a specific dollar value e.g. salaries, purchase of hardware or software –Intangible costs are more difficult to measure e.g. reduced customer satisfaction, low morale in the organization –Although intangible costs are important, tangible cost figures should be used if available

Lecture 56 Describing Costs and Benefits Direct and indirect costs –Direct costs are those that can be associated with the development of a specific system e.g. project team salaries, new hardware or software needed for the system –Indirect costs, or overhead expenses, cannot be attributed to a particular system e.g. network administrator’s salary, copy machine rental costs

Lecture 57 Describing Costs and Benefits Fixed and variable costs –Fixed costs are relatively constant and do not depend on a level of activity or effort e.g. salaries, rental charges –Variable costs depend on the level of activity e.g. printer paper, supplies, telephone line charges

Lecture 58 Describing Costs and Benefits Developmental and operational costs –Development costs are incurred only once, at the time the system is developed e.g. system development team salaries, user training, hardware purchase –Operational costs are incurred after the system is implemented and while the system is in use e.g. system maintenance, ongoing training, annual license fees

Lecture 59 Describing Costs and Benefits Benefit classifications –Benefits can be classified into the same categories as costs Tangible and intangible benefits Direct and indirect benefits Fixed and variable benefits Developmental and operational benefits

Lecture 510 Cost-Benefit Analysis It is the process of comparing anticipated costs to anticipated benefits Cost-benefit analysis produces reliable information for making decisions Common cost-benefit techniques –Payback analysis –Return on investment (ROI) analysis –Present value analysis

Lecture 511 Cost-Benefit Analysis - Payback Analysis It is the process of determining how long it takes for an information system to pay for itself Four step process 1. Determine the system’s initial development cost 2. Estimate annual benefits 3. Determine annual operating costs 4. Find the payback period by comparing total costs to accumulated benefits

Lecture 512 Cost-Benefit Analysis - Payback Analysis When costs and benefits are plotted on the same graph, the payback period is illustrated Note that the payback period is not the point where the current benefits equal current costs The payback period is the point where accumulated benefits equal accumulated costs Click to see Figure

Lecture 513 Cost-Benefit Analysis - Return on investment analysis ROI is a percentage rate that measures profitability by comparing a project’s total net benefits (the return) to its total costs (the investment) ROI = (total benefits-total costs)/total costs Projects can be ranked using ROI Click to see Figure

Lecture 514 Cost-Benefit Analysis - Present value analysis Time value of money : adjusts future costs and benefits and expresses them in terms of current dollars The timing of costs and benefits directly affects the desirability of a project

Lecture 515 Cost-Benefit Analysis - Present value analysis –Benefits that you receive now are more valuable than those you receive in the future, because you gain the use of the money –Costs that you incur now are more expensive than those you incur in the future, because you lose the use of the money immediately

Lecture 516 Cost-Benefit Analysis - Present value analysis 1. Use present value tables to time-adjust values 2. Total the time-adjust costs and benefits 3. The net present value (NPV) is total benefits minus total costs Click to see Figure

Lecture 517 End of Lecture 5