CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started.
Geography of Ancient Egypt
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Boren School Preparing an existing wall to receive structural improvements.
WESLEYAN P BID PACKAGE #19
M Darling St (North) Parliament St (West)Longmarket St (South)Wellington side (East)
F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.
Help me find the cardinal directions
Demonstration of seasons. Procedure 1.Identify the corners of the room as North, South, East and West. 2. Student A is at the centre of the classroom.
Selected Problems from Chapter o.
Position and Motion Section 1.1.
The Geography of Jerusalem A Photographic Tour Robert C. Newman Abstracts of Powerpoint Talks - newmanlib.ibri.org -newmanlib.ibri.org.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
Building Plans.
Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.
7 Mini Mall Design. Connection Quick View Architectural view.
Framing the House. Platform Framing Platform framing.
“The Body” A Tiny Town Mystery. 5th Ave 4 th Ave 3 rd Ave 2 nd Ave 1 st Ave Zero St. Anteater Black Bear Cheetah Dolphin Elephant Rd. Ct. St. Rd. Hwy.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
North Augusta High School Design Development Presentation.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
October 26, 2001 Sudbury, Massachusetts The Office of Michael Rosenfeld, Inc., Architects West Acton, MA Lincoln-Sudbury Regional High School.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
HUGS 4 Africa Nov, 2014 Bedroom built in 4 days Gatuto Kenya.
Sectionalism Map Assignment
Find that place..  Find that content  Longitude, East is to the right, West is to the left of the Prime Meridian or 0 degrees  Latitude, North is going.
5.8: Intermediate Related Rates. Sand is poured on a beach creating a cone whose radius is always equal to twice its height. If the sand is poured at.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Cupid Shuffle.  Everyone find a line on the floor and face the stage.  Now put your arms stretched out to your sides, you should not be able to touch.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
Concrete Concrete Cement Sand Gravel Water.
San Marcos Landfill 1595 Questhaven Rd. San Marcos, CA AA-0008 Photos by Anthony Torres Page 1 of 3 October 3, 2012 The gravel bags leading to.
The Geography of Jerusalem A Photographic Tour Robert C. Newman.
UNITED STATES DAILY QUIZ
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
CITY OF AUSTIN Public works department date
Principles of a Grid Reference
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Graduation Project 2 Redesigning a Villa
AARNA Progress Report-June 2017
INDOOR BASEBALL / SOFTBALL FACILITY
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
The photo is showing the south side of the building and configuration of the exterior side of the windows. Elevation designs describe the materials and.
Framing the House                                                                                                                   
Thatch House (Plan) Fig.4.
Minuteman Vocational Technical Regional High School Progress
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
VIS roll-out 1. North Africa (11/10/11); 2. Near East (10/05/12); 3. Gulf (02/10/12); 4. and 5. West and Central Africa (14/03/13) 6. East Africa + 7.
Section 1 (cont.) Power.
The Geography of Jerusalem
北 N north 西 W west 東 E east south南 S.
Place your puzzle and free fall practice problems on your desk #
Olives for oils.
Alignment near Coboop Entrance Gate - 28°55'59.78“S 19°21'39.04"E
Statistical overview of approved INTERREG IIIC operations - All zones - July 2005.
29th & Choctaw Rd Project Projected time line.
East West Move to Table 2 N/S
1 2 Table No Table No 5 Table 5 Table ¾ Howell Movement
North Augusta High School – Phase 2A and 2B
Compass Activity Just get it done!
Student Center A South: Inaccessible Element
START DIRECTIONS QUIZ.
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Question 1. Question 1 What is 10 x 40? A 40 B 400 C 4000 D 4.0.

Are you in North America?
WORLD TEST CHAMPIONSHIP India Schedule
Presentation transcript:

Photo Tour of Building an Earthship 11 Sep 1999 – 2 Nov 2011 Section 1.2 by Ron and Joy Oliver

End of Season Lower West Pod and Wing Wall ~ 75% Done

East Bond Beam Complete

Two Cement Mixers Going for Continuous Bond Beam Pour

Two Bond Beams Done, Prep for Footings, Looking South (Pod 1)

Later pods up stairs, 3 rd mostly done

2001 After Footings done –Framing East Doorway - Looking North East (Pod 1)

Near end of 2001 – Post and Beam Wall Done

Building Materials – Refuse at Mica Processing Plant

Free for the Taking, if you Wear the Right Gear

Third Bond Beam and Trash Cans of Mica Sand

End of 2001 – All but 120 Tires Pounded

Building Materials – 700 Free Tires, Delivered!