Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Construction and Installation of the CLIC Experimental Area
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
HiRadMat : report from WG2 – WANF dismantling WG3 - Irradiation Area October S. Evrard 1 WG2&3 meeting organization Preliminary WBS for related.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
PLC NANO MANAGING SAFETY FUNCTIONS acting on electrical power for MEY/NA Experiments/Barracks.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Operation & Maintenance in ST-MA presented by Rui Nunes.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
Status of Gas Barrack(SPS) and Exhaust JAILLET David EN/EA/CT.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Financial Matters Ferdinand HAHN 08/04/ Content Definition of Common Fund (MOF) in MoU MOF in 2010 (Budget – Contributions -Expenses) MOF in 2011.
Update on the PSB Cooling and Ventilation Systems
I. Bergevoet - Training preparation
NA CONSOLIDATION & SAFETY SYSTEMS
Safety in the Neutrino Platform Hall
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Experimental hall design in Japanese site
Budget specification EHN1 Extension: Infrastructure (WG2)
EN-CV Progress EHN1 Extension Project
CE Status: Activities executed until 03/08 and ongoing
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
HL Consolidation Day Analysis of needs from BE-ICS
CEDAR Detector Ventilation System Review
NA CONSOLIDATION & SAFETY SYSTEMS
COOLING & VENTILATION INFRASTRUCTURE
East Hall under construction
Experimental Areas – LS2 planning
North Area Safety Review 2019
North Area Safety Review 2019
Summary of the presentation:
Access Control for CERN Experimental Areas
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015

The project is devided in 4 parts: EHN1 North Wall dismantling (WG1) EHN1 extension building infrastructure (WG2) Extension of the H2 and H4 beam lines (WG3) Installation of detectors and associated infrastructure (WG4) Fuctional specification: Edms: Budget specification: Edms:

Work units - infrastructure PBS-IDTitleGroup IN.2.1Ventilation, heating and air-conditioningEN-CV IN.2.2Fluids- and water coolingEN-CV IN.2.3Electrical infrastructure and lightsEN-EL IN.2.4Counting roomsEN-MEF IN.2.5Gas networksEN-MEF ÎN.2.6Metal structures ΕΝ-MEF or GS (tbc) IN.2.7DoorsEN-MEF IN.2.8Alarms- and detectionGS-ASE IN.2.9Personnel accessGS-ASE IN.2.10IT-networksIT-CO IN.2.11Transport- and handlingEN-HE Total Project contingency (10%) Total request

Cooling and Ventilation – Jerome Rodary

Building general ventilation: adding of 2 new ventilation units total flowrate: m3/h total heating power: kW Existing ventilation unit inside EHN1 building Fire fighting water hose Argon extraction unit Fluid networks

Electric infrastructure - James Devine This work unit for electric infrastructure includes consolidation up-stream of EHN1, which must be done to connect the extension. The cost sharing (proposal) is based On the surface of the extention vs. existing hall. EL will need a consolidation budget (from NA Cons) of 1’488 kCHF in addition to this sum.

MEF-Items A full FTE from MEF for the project coordination during the whole project.

Platform «jura side» Counting rooms Personnel access door with card reader Neutral gas panel MEF-Items

GS-ASE – M Dore, R Nunes, D Vaxelaire A safety hazard assessement with HSE is in progress

IT networks – Federico Lerda

Transport & handling - R Rinaldesi / I Ruehl Note: the two 40 ton overhead cranes are renovated on the consolidation project

Infrastructure items in WG2 - Summary

Funding problem EL-infrastructure

Thank you !

Direct stairs Stairs tower 1 Stairs tower 3 Stairs tower 2 Passerelle 1 Passerelle 2 Passerelle 3 Passerelle 4 Passerelle 5 Passerelle 6 Platform + passerelle 7 EHN1 extension Metallic structures Layout 14 th October 2015 H4 platform Unloading quay

A exist = 14500m3 A ext = 3600 m3 Consider that after the phase one, the whole extension and half of the existing hall is renovated; the sharing is (for common items): 33.2 % (extension) and 66.8 % on consolidation)