ISOLDE Technical Report INTC Meeting 31 st October 2012 Richard Catherall EN-STI.

Slides:



Advertisements
Similar presentations
ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Advertisements

ISOLDE Yield Database Tania Melo Mendonca EN-STI-RBS.
ISOLDE Yield Database Development
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
First Experiments with the Laser Ion Source and Trap (LIST)
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
On-line tests RFQ cooler ISCOOL A quick summary P. Delahaye, H. Frånberg, I. Podadera ISCOOL, COLLAPS, ISOLDE collaboration.
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
Future Developments at ISOLDE Richard Catherall ISOLDE Technical Coordinator ISOLDE Workshop and Users Meeting 17 th – 19 th December 2012.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC.
Richard Catherall EN-STI CERN, 3rd July 2012 ISOLDE Technical Report for the ISCC.
Richard Catherall EN-STI CERN, 6 th July 2011 ISOLDE Technical Report for the ISCC.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
ISOLDE Technical Report & Long Shutdown Works ISCC Meeting 28 th January 2013 Richard Catherall EN-STI.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Target and Ion Source Development
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
The HIE-ISOLDE Faraday Cup
CERN-MEDICIS (MEDical Isotope Collected from ISolde): A new facility
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Pekka Suominen 2010 CERN Plasma ion sources for radioactive molecular ion beams.
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
ISCC/INTC 10-11Nov 2015T. Stora on behalf of R. Catherall EN/STI Technical news MENU Technical Issues: HRS coupling table piston - BTY Line water leak.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Status of the Design Study Richard Catherall EN-STI-RBS.
UNIVERSITY OF JYVÄSKYLÄ Mapping the boundaries of the seniority regime and collective motion: Coulomb excitation studies of 208 Po and 210,212 Rn Addendum.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the ISCC.
ISOLDE Technical Report Richard Catherall EN-STI-RBS ISOLDE Technical Coordinator 52 nd INTC meeting 3 rd February 2016.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
CERN-MEDICIS: Production d’isotopes selon l’approche « ISOLDE » pour la recherche médicale Thierry Stora EN-STI EN-GMS 5 th March 2013.
Hanna Frånberg Delahaye Radioactive beam production
ISOLDE Technical Report for the ISCC
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Richard Catherall EN-STI 2nd February 2011
Beam developments in 2011 Target and Ion Source Development (TISD) Thierry Stora, EN-STI-RBS With input from many different colleagues.
Technical Report for ISOLDE
ISOLDE Technical Report for the ISCC
ISOLDE Front-End design review – Details of previous faults
Alexander Herlert, CERN (PH-SME-IS)
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
ISOLDE Technical Report & Long Shutdown Works
Technical Report for ISOLDE
TISD BeO tests 1st learnings
Report on HIE-ISOLDE Status
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

ISOLDE Technical Report INTC Meeting 31 st October 2012 Richard Catherall EN-STI

Outline Separator Operations  GPS extraction electrode failure  Interventions  Controls Targets REX RILIS Radiation protection monitoring 2

~122 Separator Operations: GPS Frontend Observations 3

Separator Operations: GPS Frontend End stop Potentiomètre de position Moteur pneumatique Vis mère intérieure Renvoi conique 90° Traversée étanche rotative Embrayage Vis mère extérieure Electrode Ecrou et tige de transmission OK  Test positiveNOT OK  Failure on transmission 4

GPS FE Status Intervention to confirm/remove target was successful. Plug target has been installed by the robot The Helicon target can be accommodated on the GPS FE with little modifications required.  Extraction electrode ideally positioned with respect to ion source.  Decision approved by ALARA level 3 committee Possibility to save ~ 2 weeks of physics  9 C, 31, 35 Ar -> CaO target A plug target to be put back on after Helicon target. Full repair to be carried out during LS1  Not a trivial matter. Cause unknown 5

Separator Operations: Interventions GPS.FC490  Greasing of faraday cup piston  Replacement of faraday cup with spare Vacuum leak on lower flange of FC  Greasing of spare faraday cup. HRS.FC490…2 weeks later  Replacement of faraday cup with HRS.FC300 Vacuum leak on bellows Laser windows  Replacement of oring on laser window Oring “seen” by laser light causing it to burn BTY line  Leak found at penning gauge near primary pumps 6

Separator Operations: Controls ACCOR > Accelerator controls renovation project  More than 600 devices moved from GM to FESA (CERN standard) InCA > Injector Control Architecture  After 2 test days, implemented on the 8 th October ISOLDE Synoptic Editor and player  Easy configuration  Global or detailed view  Visible on the web 7

INTC – IS Ne ISOL ISOLDE from static salt target: Concept Salt condensation Yield, D [m2/s] T. Mendonca (CERN), E. Noah (UNIGE), R. Hodak (Comenius univ), M. Allibert, V. Ghetta (LPSC) TISD team (S. Cimino, S. Marzari), EN-MME, TE-VSC Featured (with 6 He beams) in CERN activity report and EPN (43/5) * And record yields of 11C as CO+ Static molten salt target for 18 Ne* for  -beams 8

Tests of simulations with geometry I: Predicted n-rich Zn/Rb improvement of ~ x20 New converter geometry I : 5 e 3 80Zn, 5 e 1 80Rb /  C Zn, ~5 e 2 81Rb/  C  Measured improvement ca x200 ( instead of x20) Yet some teething problems: clear thermal and mechanical weaknesses Onboard for phase II (2014): Keeping the same Impurity/beam improvement, and increase of yield R. Luis et al, EPJ A 2012 TISD team, S. Marzari, B. Crepieux New n converter – phase I 9

152Tb MEDICIS test batch shipped in August to Lausanne Peptide that specifically binds to prostate cancer tissues Batch collected at ISOLDE (A. Gottberg, EN-STI) and exported to CHUV (F. Bucchegger, Lausanne hospital) with DGS-RP, K. Johnston ( Isolde) and GS Tests on mice already showed better bio-distribution (less toxicity to healthy tissues) than same peptide + 68Ga  Candidate for next therapeutic trials with 149Tb/161Tb Present Collaboration & Funding Scheme  R. Catherall, T. Giles, Z. Lawson, S. Marzari, M. Dias, T. Stora (CERN)  Dr. Forni (Clin. Carouge)  Prof. Morel, Prof. Buehler L. Vouga, Prof. Y. Seimbille, Prof. Ratib (HCUGE)  Prof. D. Hanahan (ISREC, EPFL, Lausanne)  Prof. J. Prior, F. Bucchegger (CHUV, Lausanne)  Prof M. Huyse, prof. P. van Duppen (Univ. Leuven)  Prof. S. Lahiri (SINP, Kolkata) 152Tb From ISOLDE Prostate Cancer cells 10

First spin-polarized beam (8Li) produced with the tilted foils method after the REX linac. Difficult 6 He through REX to Optical Time Projection Chamber (OTPC). TwinEBIS cryostat repaired; B-field being aligned. REX separator and linac successfully tested with A/q=2 => important for TSR. Positive preliminary tests of pulse shortening from REXEBIS => important for TSR. REX-ISOLDE 11

RILIS operation BeamSm 2 runs Ca 2 runs CdAt 2 runs Au 2 runs Be 3 runs DyMg 4 runs Po 2 runs Ag 2 runs ZnCuMn Planned Real By now ion beams of 10 elements were produced with RILIS in 2012 Laser ON time in 2012: 3000 h – Expected by end of 2012 Availability of two complementary laser systems (Dye and Ti:Sapphire) has ensured the increase of RILIS beam time 2590 h – by 25 October 12

LIST device:LIST assembly: Ion repeller  LIST was successfully tested with UCx-target -> No loss of performance over 5 days  Suppression of Na-, Al-, K-, Fr-, U-isotopes studied -> Suppression factors varied from 100 to 1000  Laser ionization of radioactive Mg and Po in LIST Laser ionized 30 Mg Suppressed 26 Na, 46 K LIST mode RILIS mode Fr suppression and laser ionization of Po in LIST Ionization and suppression of contaminants by LIST: Laser Ion Source and Trap (LIST) On-Line at ISOLDE RF terminals By Daniel Fink First ever LIST on-line physics result: hyperfine structure of 217 Po 13

Radioprotection New radioprotection monitoring to be installed during LS1  Additional stations to allow more accurate survey of dose rates around beam line 14

Acknowledgements T. Stora EN-STI D. Voulot BE-OP F. WenanderBE-ABP E. PiselliBE-OP E. SieslingBE-OP J.L. GrenardEN-HE V. FedosseevEN-STI D. FinkEN-STI A. P. BernardesEN-STI A. StadlerEN-STI S. MarzariEN-STI T. GilesEN-STI Martino Giordano FerrariBE-OP …and the ISOLDE team. 15