SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 P2 P1 MI52 MCenter MTest 3 km beam line from MI52 to MT6 and MC7 2.5 km.

Slides:



Advertisements
Similar presentations
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
Advertisements

ISIS Accelerator Division
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
1 NuMI BEAM POSITION MONITOR via MAIN INJECTOR, and RECYCLER Brajesh Choudhary, 06.Mar.2003 MINOS Collaboration Meeting University of South Carolina, Columbia.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Automated Beam Steering Software at FNAL Keith Engell Accelerator Controls.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Physics in the Fixed Target Areas Erik Ramberg Users meeting / 2 June, 2004 Beam delivery to Switch Yard Meson Beam Lines MTest: the Meson Test Beam Facility.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Brajesh Choudhary, Fermilab LCWS 2006, IISc, Bangalore, India, 9 th –13 th March presented by Marcel Demarteau & THE ILC FERMILAB TEST BEAM & THE ILC.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Status of HESR 18th March Gießen Dieter Prasuhn.
2003 test beam with 25 ns bunched muons
The Status of Fermilab’s Test Beam Facility
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Presentation transcript:

SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 P2 P1 MI52 MCenter MTest 3 km beam line from MI52 to MT6 and MC7 2.5 km from MI52 to KTeV Hall P1  P2  KTeV Hall (proposed for E906)

120 GeV proton beam to the KTeV Hall An 800 GeV proton beam which created a secondary neutral kaon beam was most recently delivered to KTeV hall in ~1999 The 1999 beam line contained one large superconducting string of dipoles. Since then, the lab has decommissioned the cryogenic system in the Switchyard. Fortunately, we can deliver 120 GeV beam with normal magnets (after some reconfiguration). The renovation of the Switchyard to deliver an intense 120 GeV proton beam to the KTeV Hall will be an Accelerator Division Project. It can be done mostly while the Tevatron is running.

P1 P2 P3 Transfer Hall High Intensity 120 GeV To Pbar Production Encl-B Encl-C <1e12 to MTest Encl-G1 Encl-G2 Encl-NM1 Encl-NM2 Encl-NM3 KTeV Hall Enclosures in RED must be modified To transmit 120 GeV protons Extracted 120 GeV proton beam line to KTeV Hall, E906 Main Injector - 14” dia. Underground beam pipe To Tevatron

Last quad doublet about 200’ upstream Counting Room

Time structure of the 120 GeV proton beam. The Main Injector RF operates at 53 MHz; thus the beam is bunched in 1 nsec long pulses every 19 nsec. RF timing signal is available at the experiment – makes timing counters easy! Can be used to clock the electronics The circumference of the MI is about 10 μsec.; thus there is an 1 μsec injection gap every 10 μsec. There is an random variation of the resonant slow extraction intensity due to magnet ripple, beam oscillations, etc. This leads to a gross duty cycle of less than 50%. I.e. 2 uncorrelated counters, each counting 0.1% of the beam would have a randoms rate of 1e-6 if duty cycle was 100% - can realistically expect 2-3e-6 randoms because beam is not perfectly random in time.