13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
Improvements to ME1/1 TMB Algorithm from Simulation Studies US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Simulation of GEM-CSC Integrated Trigger: Status and Plans US CMS EMU Workshop Vadim Khotilovich, Texas A&M University for GEM DPG group.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC High Pileup Sumulations Vadim Khotilovich Alexei Safonov Texas A&M University June 15, 2009.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
Khaled Belkadhi (LLR-Ecole Polytechnique)1 DHCAL Test Beam Results using Full Train Reconstruction Khaled Belkadhi.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
904 Status Recall last Group Meeting…
Timing/Synchronization Status
University of California Los Angeles
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
Electronics for RPC Upscope
University of California Los Angeles
Overview: Introduction to LHC Overview of CMS
University of California Los Angeles
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
TMB and RAT Status Report
Test of Link and Control Boards with LHC like beam, CERN, May 2003
DQM for the RPC subdetector
University of California Los Angeles
Run4 Fiducial Match between Real and MC
Plans for the 2004 CSC Beam Test
Presentation transcript:

13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007

G. Rakness (UCLA) 2 Tracking through the numbers, making cuts… MTCC phase II Run 4188: 2.5M triggers events with “something” in ME1 = 0.5M events with “something” in ME+1/3/30 = 53k Raw chamber multiplicity… Occupancy in ring ME+1/3… N.B. “something” = ALCT, CLCT, LCT, RecHit, or segment…

13 March 2007G. Rakness (UCLA) 3 Tracking through the numbers, making cuts… Occupancy in ring ME+2/2… events with exactly 2 chambers with “something” (including ME+1/3/30) = 26k events with something in ME+1/3/30 and ME+2/2/30 = 12.6k events with exactly one segment in both ME+1/3/30 and ME+2/2/30 = 10.5k Segment multiplicity in ME+2/2/30…

13 March 2007G. Rakness (UCLA) 4 Illumination histograms for events with exactly 1 segment in ME+1/3/30 and ME+2/2/30 ME+1/3/30ME+2/2/30 Things to note… edge of ME+1/3/30 overlaps with HV division in ME+2/2/30 HV divisions overlap ME+1/3/30 “carves” out region in ME+2/2/30 Distributions of average RecHit positions:

13 March 2007G. Rakness (UCLA) 5 Interpolate  position at RPC Use average value of RecHits to draw straight line between ME+1 and ME+2… Y vs. X at Z = 712cm Things to note: HV divisions in CSC project into RPC (large  region where) CSC is active is <  < 0.75

13 March 2007G. Rakness (UCLA) 6  position with RPC bit in RAT Project  from ME+1 to ME+2, and require RPC data in RAT… Y vs. X at Z = 712cm Things to note: HV divisions appear to be different in RPC than in CSC… (large  region where) RPC is active is 0.74 <  < 0.75

13 March 2007G. Rakness (UCLA) A1A2 B1B2 C1C2 Chamber Strip LB Input Channel A1 A2 B1 B2 C1 C2 Connector Box strip 0strip 31 Recall: RPC Endcap Link Board Mapping K. Bunkowski (Warsaw) Configuration of LB in MTCC phase II was found to have a bug…  OR of 4 bits instead of 8

13 March 2007G. Rakness (UCLA) 8 RPC efficiency in RAT  =  =  = 0.75  =  = 0.75  = 0.74 CSC HV segment fiducial volume constraints: 1107/2068 = 54% RPC HV segment fiducial volume constraints: 797/805 = 90% …Efficiency depends on fiducial volume selected…  Significantly larger value within RPC HV segment

13 March 2007G. Rakness (UCLA) 9 Recall: RPC LB timing in TMB FIFO Estimates not conclusive…  Need to make measurement of relative latency between RPC LB and CSC pretrigger Propose to: 1.Minimize programmable delay in RPC LB data path 2.Reduce time for RPC LB data decoding in TMB firmware 3.Use programmable delay in TMB to time in both sides of RPC LB data peak  RPC data are late into TMB FIFO ALCT*CLCT pretrigger arrives here Time bin of RPC data (bx) RPC pad multiplicity  1