DESIGN OF THE BNL SUPER NEUTRINO BEAM FACILITY W. T. Weng Brookhaven National Laboratory Neutrino Super Beam, Detectors and Proton Decay BNL/UCLA/APS Workshop.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

ISIS Accelerator Division
MATERIAL R&D FOR HIGH-INTENSITY PROTON BEAM TARGETS PROGRESS REPORT Nicholas Simos, BNL January 4, 2005.
Thomas Roser ICFA HB-2004 Workshop October 18, 2004 Plans for Future Megawatt Facilities Introduction Issues of high intensity beam acceleration Proposals.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Ion Accelerator Complex for MEIC January 28, 2010.
PLAN MATERIAL STUDIES FOR PULSED HIGH-INTENSITY PROTON BEAM TARGETS Nicholas Simos, Harold Kirk, Hans Ludewig, Peter Thieberger, W-T Weng BNL Kirk McDonald,
2nd High-Power Targetry Workshop MATERIAL IRRADIATION STUDIES FOR HIGH-INTENSITY PROTON BEAM TARGETS Current & Future Activities N. Simos and H. Kirk,
POST-IRRADIATION PROPERTIES OF CANDIDATE MATERIALS FOR HIGH POWER TARGETS H. Kirk, N. Simos, P.L. Trung, H. Ludewig, L. Mausner, P. Thieberger - BNL K.
NuFact2004, Osaka, Japan MATERIAL R&D FOR HIGH-INTENSITY PROTON BEAM TARGETS Nicholas Simos, H. Kirk, W-T. Weng, P. Thieberger, (BNL) K. McDonald, Princeton.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
NuFact 2005 US Solid Target Program Neutrino Factory/Neutrino Super Beam N. Simos, BNL H. Kirk, H. Ludewig, PT. Trung (BNL) K. McDonald, Princeton U. J.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Alexander Aleksandrov Oak Ridge National Laboratory
Harold G. Kirk Brookhaven National Laboratory Post-Irradiation Properties of Candidate Materials for High-Power Targets PAC05 Knoxville, TN May 16-20,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
1 The BNL Super Neutrino Beam Project W. T. Weng Brookhaven National Laboratory APS April Meeting ( T13 ) Tampa, Florida April 18, 2005.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
NBI CERN Experimental Assessment of Radiation Damage in Targets Considered in Neutrino Superbeam and Neutrino Factory Initiatives N. Simos, BNL.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES N. Simos, BNL EUROnu-IDS Target Meeting December 15-18, 2008 Superbeam Horn-Target Integration.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Progress in the Multi-Ion Injector Linac Design
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Superbeams with SPL at CERN
Injector Chain General and more about p-RCS/i-RCS
FFAG Accelerator Proton Driver for Neutrino Factory
W. T. Weng Brookhaven National Laboratory
Progress towards Pulsed Multi-MW CERN Proton Drivers
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
Explanation of the Basic Principles and Goals
The SPL-based Proton Driver at CERN
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

DESIGN OF THE BNL SUPER NEUTRINO BEAM FACILITY W. T. Weng Brookhaven National Laboratory Neutrino Super Beam, Detectors and Proton Decay BNL/UCLA/APS Workshop March 3-5, 2004, BNL

OUTLINE A. AGS Operation with protons B. Accelerator Upgrade (1MW) C. R&D Activities D. Accelerator System Cost Estimate E. Further Upgrade Potential F. Conclusion

AGS Intensity History 1 MW AGS

Total Accelerated Protons at the AGS 0.8     Total accelerated protons 1.0   Slow extracted beam (Kaon decay) Fast extracted beam (g-2) Note: Lower total accelerated protons in later years due to much shorter running time

Transition Time to Restore HEP

Concurrent HEP Operation with RHIC 1. From the performance data shown, it is clear that it is possible to operate AGS proton-based HEP research in concurrence with RHIC operation. 2. The available AGS HEP running is about 80% of the total RHIC operation time. 3. The HEP program only have to pay for incremental costs, which is a big savings from independent operation. 4. The co-existence of HEP and RHIC operations is very beneficial for both equipment reliability and personnel training.

AGS Upgrade to 1 MW 200 MeV Drift Tube Linac BOOSTER High Intensity Source plus RFQ Superconducting Linacs To RHIC 400 MeV 800 MeV 1.2 GeV To Target Station AGS 1.2 GeV  28 GeV 0.4 s cycle time (2.5 Hz) 0.2 s 200 MeV l 1.2 GeV superconducting linac extension for direct injection of ~ 1  protons low beam loss at injection; high repetition rate possible further upgrade to 1.5 GeV and 2  protons per pulse possible (x 2) l 2.5 Hz AGS repetition rate triple existing main magnet power supply and magnet current feeds double rf power and accelerating gradient further upgrade to 5 Hz possible (x 2)

AGS Upgrade AGS presentAGS upgrade Kin. Energy28 GeV Rep. Rate1 / 3 Hz2.5 Hz Protons/ Cycle 0.67 x x Ave. Power0.10 MW1.0 MW 1.5-GeV Booster 200-MeV TDL 28-GeV AGS HI Tandem 1.2 GeV SCL 0.6 sec 2.4 sec AGS Booster 0.4 sec Typical DTL cycle for Protons 1 x mA

AGS Proton Driver Parameters present AGS1 MW AGS2 MW AGSJ-PARC Total beam power [MW] Injector Energy [GeV] Beam energy [GeV] Average current [  A] Cycle time [s] No. of protons per fill0.7     Average circulating current [A] No. of bunches at extraction No. of protons per bunch1     No. of protons per 10 7 sec.3.5     10 20

Layout of the 1.2 GeV SCL

1.2 GeV Superconducting Linac Beam energy 0.2  0.4 GeV0.4  0.8 GeV0.8  1.2 GeV Rf frequency805 MHz1610 MHz1610 MHz Accelerating gradient10.8 MeV/m23.5 MeV/m23.5 MeV/m Length37.8 m41.4 m38.3 m Beam power, linac exit17 kW34 kW50 kW Based on SNS Experiences

C. R&D Activities 1. Beam Dynamics in the AGS n Injection Painting n Linac Emittance n Transition Crossing n Ring Impedances n Beam Loss and Collimation 2. AGS Magnet Test 3. New Power Supply Design 4. AGS RF Cavity/Ferrite Test 5. SCL Accelerating Cavity (Join the US SMTF Program) 6. LLRF for Beam Control 7. Design of the 1MW Target/Horn System 8. Target Material Testing (Initiate the US/Japan Collaboration and the BNL LDRD Program)

Beam Loss at H - Injection Energy AGS BoosterPSR LANLSNS1 MW AGS Beam power, Linac exit, kW Kinetic Energy, MeV Number of Protons N P, Vertical Acceptance A,   m  2  N P /  2  3 A),   m Total Beam Losses, % Total Loss Power, W Circumference, m Loss Power per Meter, W/m

AGS Injection Simulation Injection parameters: Injection turns360 Repetition rate2.5 Hz Pulse length1.08 ms Chopping rate0.65 Linac average/peak current20 / 30 mA Momentum spread  0.15 % Inj. beam emittance (95 %)  m RF voltage450 kV Bunch length85 ns Longitudinal emittance1.2 eVs Momentum spread  0.48 % Circ. beam emittance (95 %) 100  m

Halo in AGS as Function of Linac Emittance For acceptable operation, the linac emittance has to be less than 1.5 

Options Layout

Linac Emittance Improvement Emittance at source 0.4 pi mm mr (rms,nor)

New AGS Main Magnet Power Supply presently: l Repetition rate2.5 Hz1 Hz l Peak power110 MW 50 MW l Average power4 MW 4 MW l Peak current5 kA 5 kA l Peak total voltage  25 kV  10 kV l Number of power converters / feeds62

Eddy Current Losses in AGS Magnets For 2.5 (5.0) Hz: In pipe: 65 (260) W/m In coil: 225 (900) W/m

AGS RF System Upgrade Use present cavities with upgraded power supplies UpgradePresent Rf voltage/turn 0.8 MV 0.4 MV RF voltage/gap 20 KV 10 KV Harmonic number 24 6 (12) Rf frequency 9 MHz 3 (4.5) MHz Rf peak power 2 MW 0.75 MW Rf magnetic field18 mT 18 mT 300 kW tetrodes/cavity 2 1

Meeting on the SRF Module Test Facility (SMTF) February 23, 2004 Argonne National Laboratory Agenda AttendeesAttendees, 40 people from 10 U.S. Laboratories Chair: Kwang-Je Kim IntroductionIntroductionH. Edwards Gaps in Knowledge and CapabilitiesGaps in Knowledge and CapabilitiesH. Padamsee

MATERIAL STUDIES FOR PULSED HIGH-INTENSITY PROTON BEAMS TARGET-HORN R&D Nicholas Simos, Harold Kirk, Hans Ludewig, Peter Thieberger, W-T Weng BNL Kirk McDonald, Princeton U K. Yoshimura, KEK J. Shepard, SLAC J. Hylen, FNAL

PHASE-II TARGET MATERIAL STUDY WHAT’S NEXT ? PERFORM irradiation and assess mechanical property changes for a host of baseline materials. Perform more sophisticated assessment Carbon-Carbon composite This low-Z composite gives the indication that it can minimize the thermal shock and survive high intensity pulses. Because of its premise it is the baseline target material for the BNL neutrino superbeam initiative. The way its key properties (such as CTE or strength) degrade with radiation is unknown. Titanium Ti-6Al-4V alloy The evaluation of the fracture toughness changes due to irradiation is of interest regarding this alloy that combines good tensile strength and relatively low CTE Toyota “Gum Metal” This alloy with the ultra-low elastic modulus, high strength, super-elastic like nature and near-zero linear expansion coefficient for the temperature range -200 o C to +250 o C to be assessed for irradiation effects on these properties. VASCOMAX This very high strength alloy that can serve as high-Z target to be evaluated for effects of irradiation on CTE, fracture toughness and ductility loss AlBeMet A low-Z composite that combines good properties of Be and Al. Effects of irradiation on CTE and mechanical properties need to be assessed TG-43 Graphite Possibly Nickel-plated Aluminum T6061 (Horn material) for visible irradiation/corrosion effects, loss of electrical conductivity, delamination, etc.

Preliminary Cost Estimate of the BNL - SNBF Accelerator Systems 1.2 GeV SC Linac: Front End$ 2.5 M LE SC Linac$ 38.3 M ME SC Linac$ 30.7 M HE SC Linac$ 28.1 M AGS Upgrades: AGS Power Supply$ 32.0 M AGS RF Upgrade$ 8.6 M AGS Injection Channel$ 3.7 M Full Turn Extraction$ 5.5 M Shielding$ 3.2 M Direct Cost$156.8 M Total Direct Cost = $156.8 M$

Preliminary Cost Estimate – Continued Total Direct Cost = $156.8 M Add:ED&I, 15% Contingency, 30% BNL Project Overhead, 13% Total Estimated Cost = $265 M

Conclusions 1.The feasibility has been demonstrated for a 1MW upgrade for the AGS 2.It is possible to further upgrade the AGS to 2 MW 3.Active R&D efforts are in progress to improve on the design and reduce cost. 4.Such a high power proton driver is essential for very long base line neutrino experiment and also for the neutrino factory.