Innovations in Sustaining Weapons Systems DAU Acquisition Community Symposium RDML Jack Prendergast Vice Director of Logistics (J-4) Joint Staff 15 April.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
Capabilities and Acquisition Division
NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
Human Capital Strategic Planning for the DoD AT&L Workforce April 2004 Ms. Lisa Sper Federal Management Partners / (703)
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Connecting People With Information DoD Net-Centric Services Strategy Frank Petroski October 31, 2006.
The Information Technology (IT) Box A Primer
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
CLR 252 Developing KPPs Note from SME:
Internal Auditing and Outsourcing
National Incident Management System 5-Year Training Plan Al Fluman, Acting Director Incident Management Systems Division (IMSD), National Integration Center.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
NIST Special Publication Revision 1
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
The Challenge of IT-Business Alignment
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
UNCLASSIFIED 1 Joint Requirements Office for Chemical, Biological, Radiological, and Nuclear Defense 26 April 2005.
Maj Richard “Krash” Krasner Directorate of Requirements Headquarters Air Force Space Command Air Force Space Command's Environmental Monitoring Requirements.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Alaska Staff Development Network – Follow-Up Webinar Emerging Trends and issues in Teacher Evaluation: Implications for Alaska April 17, :45 – 5:15.
CoCom Involvement in the Joint Capabilities Process November 4, 2003.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
Performance Based Logistics 20 Nov Current Life Cycle Challenges High Weapon System Sustainment Cost Inefficient End-to-End Supply.
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
TITLE 40 CCA Outcome Measures of Effectiveness (MOEs) Revision of mission-related and administrative processes (BPR) Post Implementation Review (PIR) Briefing.
Life Cycle Logistics.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
Perspectives on the Analysis M&S Business Plan Dr. Tom Allen, IDA Mr. James Bexfield, PA&E, OSD Dr. Stuart Starr, IDA June 19, 2008.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Capability Based Approach to Approach to Joint Warfighting Joint Warfighting Presented by: RDML Mark Harnitchek Vice Director, Joint Staff Logistics Directorate.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of: 3/1/2016 Air Force Weather Agency CEISC Committee Focus Shift - Proposed Modification to.
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
The Information Technology (IT) Box A Primer
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Requirements Executive Overview Workshop Requirements Management Certification Training Mr. Matt Ghormley.
Requirements and Acquisition Management
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
Life Cycle Logistics.
DOTmLPF-P Change Recommendations
DOTmLPF-P Change Recommendations
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Requirements Overview
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
DOTmLPF-P Change Recommendations
MDD to Milestone A Requirements Management Activities
Requirements Management Certification Training Mandate
Summary of Changes to the
DOTmLPF-P Change Recommendations
Milestone A to Milestone B Requirements Management Activities
Requirements and Acquisition Management
The Information Technology (IT) Box A Primer
DOTmLPF-P Change Recommendations
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Phase 1 Tollgate Review Discussion Template
The Information Technology (IT) Box A Primer
Presentation transcript:

Innovations in Sustaining Weapons Systems DAU Acquisition Community Symposium RDML Jack Prendergast Vice Director of Logistics (J-4) Joint Staff 15 April 2008

How can we establish a Life- Cycle systems approach to… Link acquisition to sustainment Manage our systems as fleets – “cradle to grave” Use life-cycle sustainment metrics during development Agenda  Sustainment Key Performance Parameter (KPP)  Background  Definitions  Applicability  Guidance  Observations

Why We Needed A KPP Material availability and reliability at best value were not adequately designed into systems Serious risks to programs over time: –Breach of Nunn-McCurdy thresholds –Costs more than anticipated to own –Failure to achieve availability expected by the warfighter Lack of consistent guidance across all services and programs addressing reliability, availability, and maintainability KPP exists to provide PMs and the acquisition process, and logistics a framework to assess sustainment

Background JROC Memorandum , Aug 06 –Identified need for KPP process to address sustainment issues Memorandum from OSD AT&L, Mar 07 –Mandate to establish sustainment KPP process CJCS-M C, “Operation of JCIDS” (May 07) mandated implementation of: –KPP for Materiel Availability –KSA for Materiel Reliability –KSA for Ownership Costs JCIDS: Joint Capabilities Integration Development System

Definitions Material Availability (KPP): –Measures the percentage of the total inventory of a system that is operationally capable (ready for tasking) of performing an assigned mission, at a given time, based on materiel condition. Material Reliability (KSA): –Measures the probability that the system will perform without failure over a specified interval. Ownership Cost (KSA): –Provides balance to the sustainment solution by ensuring that the Operations and Support (O&S) costs associated with Materiel Readiness (e.g.. maintenance, spares, fuel, support, etc.) are considered in making program decisions. –Ultimately based on O&S Cost Estimating Structure elements or (number of operational end items) (total number of end items ac q uired) (uptime) (uptime) + (downtime) Mean Time Between Failures operating hours number of failures during operating period

Applicability Sponsors must develop KPP and supporting KSAs for JROC Interest programs involving materiel solutions Sponsors who determine KPP does not apply must explain why it is not appropriate. –JS-J4 must concur in this recommendation for JROC Interest documents Sponsor will determine KPP applicability for non JROC interest programs Source: CJCSM C, 1 May 07

Guidance Sustainment KPP Guide –Posted in various electronic knowledge centers (i.e.. AKSS, KMDS)(i.e.. AKSS, KMDS) –Provides key considerations for programs in the development of their rationale – Will be incorporated into upcoming revision of CJCSI 3170 What the Guide Provides –Defines Pre/Post Milestone B applicability –Analytic methods are not directed, but must withstand critical review –Supporting data must provide sufficient detail to validate methods Way Ahead: Reliability, Availability, Maintainability and Cost (RAM-C) Rationale Report Handbook –AT&L led effort to rewrite DoD RAM-C Rationale Book from 1985 –Describes the metrics in depth and more importantly the relationship between them

Observations Over 33 programs reviewed since August 2007 J4 serves as the POC for PMs, OSD, and JS stakeholders regarding KPP issues –Analytical data is normally available in other program documents –J4, OSD-ATL, and other stakeholders assist with repackaging of data Processes requiring further refinement –Evaluation of network and software centric/dependent programs –Testing of KPP metrics KPP implementation = delivery of a better weapon system to the warfighter at best value

NamePositionPhone/ Lt Col Tom MillerDivision Chief, Maintenance Division J-4 (703) MAJ Eric McCoy Action Officer, Maintenance Division, J-4 (703) Points of Contact Guide to Sustainment KPP:

DISCUSSION

Backup Slides

JCIDS: Joint Capabilities Integration and Development System JCA: Joint Capability Area FCB: Functional Capabilities Board JCB: Joint Capabilities Board JROC: Joint Requirements Oversight Committee DAWG: Deputies Advisory Working Group Lexicon

FCB JROC: * Charters Functional Capability Boards (FCBs) * Directs FCB efforts & Identifies the FCB lead FCBs: * Milestone Decision Authority Co-chairs * Bring all stakeholders together for common review and issue resolution * Prioritize/assess capability gaps and proposals Command & Control Maj Gen Hostage JFCOM J-8 Battlespace Awareness BG Grunhauser JS J-2 Force Protection Maj Gen New JS J-8 Net-Centric BG Basla JS J-6 Joint Training Mr Bonnet JS J-7 Tri-chair Force Application Brig Gen Feest JS J-8 Force Management Ms Disbro JS J-8 Focused Logistics RDML Prendergast VJ4 Mr Hall, AT&L

Joint Logistics FCB Key Functions Evaluate issues and provide input to the JROC and JCB Provide assessments of capabilities issues to support PPBE activities Ensure that analyses leverage the expertise of DOD components Assist the JROC and JCB in overseeing materiel and non- materiel capabilities development within JCIDS Participate in the development of joint concepts Authority FCBs make recommendations but do not, by themselves, approve or disapprove proposals being vetted for the JCB or JROC FL FCB Current Topics Joint Heavy Lift ICD Joint Precision Air Drop CPD C-130 Avionics Modernization Program CPD Common Vertical Lift Support Platform CDD Mobile Landing Platform CDD Delivering Integrated Joint Logistics Capabilities to the Joint Force Commander

 J4/MXD reviews documents in KMDS  Applicable documents are forwarded to AT&L (MR&MP) for analysis  MR&MP provides a recommendation to J4 based on the rigor of the rationale provided for the KPP and KSAs  J4/MXD contacts sponsor if there are comments requiring adjudication to limit nonconcurs Staffing Process

General Criteria Are the KPP/KSA attributes stated in terms that reflect the range of military operations that must be supported and the joint operating environment intended for the system? Are there compatibility or interoperability attributes to guide the acquisition community in making tradeoff decisions between the threshold and objective values? Is each KPP/KSA supported by an operationally oriented analysis that takes into account technology maturity, fiscal constraints, and the timeframe the capability is required? Does the supporting analysis reflect analytical insights identified by the CBA used to develop the ICD?

Material Availability KPP Measures the percentage of the total inventory of a system that is operationally capable (ready for tasking) of performing an assigned mission, at a given time, based on materiel condition. Also indicates the percentage of time that a system is operationally capable of performing an assigned mission and can be expressed as (end items ready for tasking)/(total end items procured). Evidence of a comprehensive analysis of the system and its planned use, including the planned operating environment, operating tempo, reliability alternatives, maintenance approaches, and supply chain solutions leading to the determination of the KPP value

Reliability KSA Measures the probability that the system will perform without failure over a specified interval. Reliability metric established at the system level Provides criteria for defining relevant failure

Ownership Cost KSA Provides balance to the sustainment solution by ensuring that the Operations and Support (O&S) costs associated with Materiel Readiness Sources of baseline cost data, cost estimating relationships, and cost models identified Consistency with the assumptions and conditions being used for materiel availability and materiel reliability