CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 1 Capacity Development for CDM Cairo, March 31 & April 1,

Slides:



Advertisements
Similar presentations
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
Advertisements

The role of CDM in technical change in refrigeration - current CDM regulations - successful CDM projects and methodologies - failed projects and methodologies.
1 Programmes containing measures to mitigate climate change (Decision 17/CP.8) Seoul, Rep. Of Korea 26 – 30 September 2005 Dominique Revet (UNFCCC)
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
GHG PROTOCOL INITIATIVE Emerging Project Accounting Standards & Guidance Mahua Acharya, WBCSD World Resources Institute.
CD4CDM - National Workshop on PDD Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June 2004 PDD Preparation.
CD4CDM - RW4 Tunis, August Capacity Development for CDM Additionality Analysis Vale Do Rosario Bagasse Cogeneration (VRBC) Project - Brazil.
Baselines and Additionality Training Seminar for BioCarbon Fund Projects July 11-13, Washington DC. Lasse Ringius. World Bank Carbon Finance Business.
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December SUMMARY OF METHODOLOGICAL.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Capacity Development for CDM - National Workshop on PDD Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second Nationa Workshop - Phase II - Cairo, January 2004.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Tatsushi HEMMI Institute for Global Environmental Strategies COP 9 Decisions related to CDM in forestry sector – An update on implications for Asia IGES-URC.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second Nationa Workshop - Phase II - Cairo, January 2004.
Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January Capacity Development for CDM Second National Workshop.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Template Contents of the Low Carbon Development Strategy (LCDS)
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Presentation transcript:

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1, 2004 The Baseline Concept: From The Theory to the Practice Samir Amous, APEX, Tunisia Regional Centre for North Africa and Middle-East Tel : Fax :

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, What is an eligible project to CDM ? Projects that achieve emission reduction : –Baseline VS GHG mitigation project The calculated emission reduction is the basis for the agreement between the CERs Buyer and the CERs Seller The approved emission reduction is to be credited to the Buyer’s account The approved emission reduction is to be credited to the Buyer’s account

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, How to access to CDM ? Approval : An authorized Authority  The CDM Executive Board (EB) Approval : An authorized Authority  The CDM Executive Board (EB) The Framework : a Project Design Document that is submitted to the EB: –The PDD: used to describe the project activity in a standard format  the basis for CDM project validation and registration –The PDD: in English

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Outline of the PDD

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Baseline Concept - Definition The BASELINE for a CDM project activity : the scenario that reasonably represents the GHG emissions that would occur in the absence of the proposed project activity –  The Reference Scenario

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, What’s a Baseline Methodology An application of an Approach as defined in para. 48 of the CDM Modalities and Procedures  to an individual project activity: –On a project-specific basis Taking into account relevant national and/or sectoral policies and circumstances.

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Baseline Methodology - Principales Transparent and conservative manner regarding the choice of approaches, assumptions, methodologies, parameters, data sources, key factors and additionality, taking into account uncertainty

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Baseline Conservativeness Baseline Conservative Baseline With CDM project Time Emissions GHG reductions

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Baseline Methodology - Principales BL should be defined in a way that CERs can’t be earned for decreases in activity levels outside the project activity or due to force majeure (para. 47 of the Modalities & Procédures)

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Baseline Approaches The basis for the Baseline Methodology EB agreed that THREE Approaches (see 17/CP7, Anx - Sub-para. 48(a) to (c) of the CDM Modalities and Procedures) are the only ones applicables for CDM projects:

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Baseline Approaches (a) Existing actual or historical emissions, as applicable; or (b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment; ( c) The average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20 per cent of their category.

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, (a) Existing actual or historical emissions, as applicable No other indications (number of years to be included, technologies, etc.) E.g. emission trends of the electrical sector for the last 10 years

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, (b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment A charcoal Power Plant is the usual practice because of the availability of the coal in the country, and the limited needs for financial resources Using Petroleum coke in the Cement Industry

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, ( c) Average emissions of similar project activities  previous five years, and whose performance is among the top 20 per cent of their category

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, The Baseline Section in the PDD Title and reference to the UNFCCC CDM website for the methodology applicable to the project activity Justification of the choice of the Methodology How the project is additional  not baseline scenario Project boundaries Details of the BL and its development

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Justification of the choice of the Methodology Explain the principles of the Methodology Why is it applicable to the specific case of the project ? Justify the Approach used (see presentation Rafik)

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, How the project is additional  not baseline scenario A flow-chart or series of questions that lead to a narrowing of potential baseline options Qualitative or quantitative assessment of different potential options and an indication of why the non-project option is more likely A qualitative or quantitative assessment of one or more barriers facing the proposed project activity Indication that the project type is not common practice, and not required by recent/pending legislation/regulations

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, How the project is additional  Examples Investment Barriers –Wind Power: US$ M 1.2 / MW for 3,000 hours –Combined Cycle: US$ M 0.7 / MW for 6,500 hours –For a 100 CC (US$M 70) an equivalent 220 MW Wind Power is needed (US$M 264)

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, How the project is additional  Examples Technological Barriers –The project is the first one to be implemented in the country  technological risks –Lack of skilled labor to operate and maintain new technologies –Unforseen Meteorogical damages

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, How the project is additional  Examples Barriers due prevailaing practices –No incentives to encourage cogeneration  no significant capacity installed up to now –Untransparent regulations  no clear tariffs indications, no specification on the duration of the eventual incentives

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, How the project is additional  Examples Other Barriers –Discouraging Land Tenure to develop Wind Power –No Transmission Lines to connect to the Natural Gaz Network –Etc.

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Project Boundaries Defines the sources of GHG emissions to be calculated and estimated to establish the emissions baseline and to be monitored once the project has been implemented Encompass all GHG emissions under the control of the project participants and those which are significant and reasonably attributable to the CDM project activity Can be shown through a Flow-Chart indicating the emission sources to be included or excluded.

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Project Boundaries Activities that are directly related to the project activity and site location (e.g. Fugitive emissions of NG to operate a Cogeneration Facility)  should be included in the boundary Impacts that are not significant relative to total emissions or that are not under the control of the project participants can be ignored

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Project Boundaries Emissions from off-site activities that are significant, directly attributable to the project activity (e.g. delocalisation of a company to get connected to the grid  increases fuel consumption for transport), and under the control of the project participants should be included in the emission baseline.

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Details of the Baseline The baseline emissions should be calculated on an annual basis and until the end of the selected crediting period The emissions should be calculated source-by-source and expressed in CO2 equivalents using the GWP values (CO2: 1; CH4: 21; N2O: 310; SF6: 23,900)

CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Details of the Baseline