Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.

Slides:



Advertisements
Similar presentations
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Advertisements

Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
European Transparency Project Progress Olaf Islei European Strategy and Environment 04 September 2008.
EU Tariff Code Update 23 rd June EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
1 Brussels workshop: 26 and 27 February 2009 Conclusions and minutes Workshop 26 – 27 February 2009 GRI NW Investment I1- Virtual Test/Business Simulation.
Investment workstream 20 January 2009 Cross-border gas transmission‏ Investment project (I1) Advisory Group Meeting Conclusions and minutes, draft Bonn.
Energiekamer RCC Meeting 28 August 2008 The Hague Maya van der Steenhoven & Kristien van de Laar PROGRAMME OFFICE - GRI NW.
26 November th Stakeholder Group Meeting of the Gas Regional Initiative North-West (GRI NW) Brussels, 26 November 2010 Mark Hobbelink Wiekens, GTS.
1 Cross-border Investment TRIGGERS GRI NW Investment I1- Virtual Test – Stockholm September 24, 2009 By : Johan Allonsius.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 5 July 2010.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Investment workstream, GRI NW Investments and Incentives an economic perspective Machiel Mulder Office of Energy Regulation Netherlands Competition Authority.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
1 Conclusions Stockholm workshop GRI NW Investment I1- Virtual Test/Business Simulation (“recorded and agreed at the workshop”)
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Working on investment climate in the NW-region Update By projectleader Investment I1 GRI North-West Investment workstream
Brussels workshop on Investment: 26 and 27 February 2009 “Simulating a (virtual) gas pipeline investment in the NW region” Coming to common proposal on.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
GRI NW Investment Cross border investment Dublin 19 May Bid Capture Process Adam Cooper & Mike Young.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Brussels workshop on Investment: 26 and 27 February 2009 “Simulating a (virtual) gas pipeline investment in the NW region” Why do we need the Virtual Test.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Investment workstream 22 January 2009 Cross-border gas transmission‏ Investment project (I1) Update to RCC at account of project leader Erik Rakhou Project.
GRI Investment Project A-Z Adam Cooper EFET Stockholm 24 September.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
Investment workstream 08 June 2009 Cross-border gas transmission‏ Investment project (I1) Update for Joint GRI NW Meeting Where are we heading since last.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Regional Initiative North-West
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
Transparency Project GRI NW Region.
Gas Regional Investment Plan project
Presentation transcript:

Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin

2 Investment workstream, GRI NW Conclusions (1) The model - as a means of stresstesting investment framework and having dialogue on the framework - was presented and approved in general subject to: - enhancing by 8 June of level of detail by 4 regulators with kms/tso, 4 national parameter sets, risk mitigation reflection (link to investment trigger discussion) - by 25 May additional comments on model are invited (please try to focus on 3-4 main issues) Core group shall consider comments and question in pragmatic way to allow for start of the test after SG on 9 June. The comments not considered shall be argumented and noted in “test journal “ The bidding process was approved in general as basis for the conducting test during June – August 2009 subject to: Limited time, therefore at least 8 shippers requested to be supported by EFET before 31 May Interactive version, 2 rounds at least, KISS; fallback is illustrative version of the bidding process

3 Investment workstream, GRI NW Conclusions (2) The questions to be addressed in “journal of findings” for discussion in September are: Concept of Investment trigger (we start with % PV as illustrative number; and subject to adding risk mitigation tools to reflect qualitative nature of investment trigger in various national frameworks) as means to enable transparent risk distribution dialogue Various risk mitigation tools available (20 years, inv. budgets) Bidding process design as a way to economically test the demand Stabilisation of tariffs (IRR/WACC) SIZE of RAB effect National issues reflection now left out (time delay; reg. periods; regulatory risk like ex-post assesment) Incentives for TSO to keep CAPEX and OPEX low Explicit assumptions (eg no reverse flow; booking assumptions) Mention any further work after test eg like hub-hub approach (vs e/e)

4 Investment workstream, GRI NW Conclusions (3) Manual discussion 1. By 8th of June 2009 the manual will be filled in for frameworks of Germany, Netherlands, Belgium and France - Seek advise of RCC on 8 June on the way to include stakeholders opinion to ensure usability of manual for the project. 2. By 24 September 2009 (workshop) overview of all nine regulatory frameworks of GRI NW The “Tilburg” case The presentation by Bastian Henze was welcomed in general subject to notes of concern on translating findings to gas market (stranded assets; monopoly of actual projects; the actual demand development) It showed that bidding processes like auctions can add value in finding appropriate aggregated level of investment Mr. Henze was invited to submit his final report before September workshop to core group for general consideration on lessons learned in terms of bidding processes Explicit assumptions in final report, i.a. on transparency of available information to participants of test

5 Investment workstream, GRI NW Conclusions on process (4) Core group assembled to lead the test untill presentation of preliminary test findings on 24.09: Shippers support (Mike Young, Adam Cooper, Martijn van Gemert) TSOs support (Bas Barten, GUD and/or Wingas Transport join subject to withdrawal note at by latest by 30 May 2009) Regulatory support (EK as facilitator (Kristien van de Laar, Ariane Kruijtzer); CREG ) Reference group remains same with addition of BNetzA, StatoilHydro and Poweo due to their step back from core group. GUD and/or Wingas stay in reference group if they don’t join core group Comments to core group on any intermediate documents

6 Investment workstream, GRI NW Time path as agreed (5) Final fine-tuning comments on model for core group to Erik Rakhou and Kristien van de Laar by 25 May Reaction by GUD and Wingas Transport on participation in core group by 30 May Shipper support by 31 May (if no support, fallback to illustrative bidding) Final model and Manual filled in for 4 frameworks by 8 June Seek by 8 June RCC advise on Manual process (online) 8 June – 15 July the shipper reactions to the test (incl. 2 rounds) Mtgs on 8 June and last week July to test progress and discuss draft findings 2 nd week of August draft report for September and agenda for Stockholm 17 September final agenda workshop and docs 24 September workshop (discuss draft test findings, manual filled in)