Kevin Nash MaPSA-Light test system 1. The System 2.

Slides:



Advertisements
Similar presentations
Programmable Interval Timer
Advertisements

Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Timepix Studies: Medipix Collaboration Summary and More Timewalk Plots Alessandra Borgia Marina Artuso Syracuse University Group Meeting – Thursday 20.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
Low Cost TDC Using FPGA Logic Cell Delay Jinyuan Wu, Z. Shi For CKM Collaboration Jan
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Online Reconstruction 1M.Ellis - CM th October 2008.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
TDC in ACTEL FPGA Tom Sluijk Hans Verkooijen Albert Zwart Fabian Jansen.
Trip-t testing progress report
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
Collaboration Meeting April 27-29, 2004 Pixel Testbeam Update D. Christian, D. Menasce, C. Newsom, M. Turqueti, L. Uplegger, J. Wang, D. Zhang.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Integration and commissioning of the Pile-Up VETO.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Eleuterio SpiritiILC Vertex Workshop, April On pixel sparsification architecture in 130nm STM technology ILC Vertex Workshop April 2008 Villa.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Kevin Nash MaPSA-Light test beam 1. The System 2.
“TALK board status” R.Fantechi, G.Lamanna & D.Gigi (CERN)
TLU plans 21/03/20161 D. Esperante, Velo upgrade meeting.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
CCF/CTA Calibration Meeting M.C. Maccarone – CCF/CTA Meeting, Barcelona, October Pre-selecting muons with ASTRI telescopes: image morphology.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 4 Report Tuesday 22 nd July 2008 Jack Hickish.
SRS TIMING ANOMALY RD51 Mini-Week June 9, 2015 M. Phipps, BNL 1.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Start Detector for pion experiments
Test Stand Status and Plans
First Testbeam results
University of California Los Angeles
SEABAS/EUTelescope Integration Idea
MaPSA-Light Chip Test setup firmware Brown: M. Narain and others
Test Beam Measurements october – november, 2016
SVT detector electronics
Beam Test Results for the CMS Forward Pixel Detector
SVT detector electronics
Presentation transcript:

Kevin Nash MaPSA-Light test system 1

The System 2

Software and Firmware Firmware – 1 st version ready 2 nd version on the way with test beam specifics Basic tests of loading onto GLIB / reading and writing registers seems to work Need hardware to further test and bugfix Software – Conceptually working programs Works on MaPSA and MPA objects mapsa = MAPSA(a) Mpa1 = mapsa.getMPA(1) Mpa1.config(xmlfile="data/Conf_default_MP A1 _config1.xml").upload(0) Need hardware further to test and bugfix ghtTest 3

Hardware Have 5 MPA-light chips Carrier boards are ready Smaller HDI for mounting MaPSA-light Higher density than standard PCB ~50 μm pitch 4

Hardware Test boards are almost ready Testing voltage levels etc Have wire bonded one MPA-light a carrier board (without connections ) Thanks to Bert Harrop at Princeton Will bond to fully assembled carrier boards 5

Hardware 6

Test Beam Using FNAL Main Injector 120 GeV Clock is 53 MHz October 28 – November 11 Only 5 weeks Want to measure time walk using FE response to real particles Beamline includes external telescopes Can measure spatial resolution 7

Test Beam 8

9

Need external input to the glib Trigger Patterned as Beam clock Plan to use processed 53/2 MHz clock with 40 MHz MPA clock – MHz Could generate x 6 = MHz clock to drive MPA 10

Test Beam Count triggers Starting at 0 for each spill Open shutter at time of trigger event and keep open for an extended period of time MPA provides timestamp and pixel matrix for each event upon readout 96 or less events per shutter opening Time stamp shutter opening, MPA event, and trigger signal using both clocks Correlate trigger and MPA timestamp to measure relevant properties (ie timewalk) DAQ software skeleton exists (needs testing) 11

Test Beam Offline analysis software simulations Basic simulation clocks, trigger, MPA events for closure test Insert gaussian time walk Try to extract 1σ from readout quantities True timewalk 1σ = 3 ns Reconstructed time walk 1σ = / ns 12

Students Looking for opportunities to ship out tasks One possibility is decoding the DAQ output Right now it has the following form [Time_Stamp_1_1:[Pixel_Matrix_1_1],… Time_Stamp_1_96:[Pixel_Matrix_1_96]],…,[[Time_Stamp_6_1:[Pixel_Matrix _6_1],… Time_Stamp_6_96:[Pixel_Matrix_6_96]] For each hit need to do following matrix rotations for plotting 13 [1,2,...,16] [1,2,...,16] [1,2,...,16] [ ], [ ], [ ], [ ], [ ], [ ] [ ] [ ] [ ] [ ] [ ] [ ] [ ], [ ], [ ] [16,...,2,1] [16,...,2,1] [16,...,2,1] [1,2,...,16] [1,2,...,16] [1,2,...,16] [ ], [ ], [ ] [ ] [ ] [ ] 1 2 3

Summary Expecting first MaPSA-light assemblies soon Prepare by testing bare MPA-light chips Have MPA-light chips Have Carrier boards Test boards almost ready Basic software and firmware exists Needs testing Fermilab test beam imminent Need to update software and firmware with test beam specifics 14

Test Beam Raw output from memory and counters gives at least time stamp of MPA (WRT 40 MHz) and trigger (WRT 53/2 MHz) X-axis: Phase difference of these clocks Y-axis: Number of 40 MHz cycles from MPA time stamp to trigger Functional form is Erf Can fit to extract 1 sigma timewalk 160 MHz phase shift at shutter opening creates up to 6.25 ns systematic shift Can be corrected for as systematic uncertainty 15