Kansas State University Purchasing Contracts Management System (KSU – PCMS) Presentation 1 Date : 14 th October 2010 By Arthi Subramanian CIS 895 – MSE.

Slides:



Advertisements
Similar presentations
Airline Reservation System
Advertisements

May 24, 2011 PUC Project AMIT Stakeholder Steering Committee Anna Grau
DHRS – KRONOS SCREEN USER GUIDE.
Early Effort Estimation of Business Data-processing Enhancements CS 689 November 30, 2000 By Kurt Detamore.
Internet Applications Update Internet Rechartering August 26, 2009.
* Requisition Processing Common Problems * Budget Checking Errors * Run Controls * Process Scheduler Request & Process Monitor * Questions.
Online Hotel Reservation System
WRAP Technical Support System Project Update AoH Call October 19, 2005.
Prototype & Design Computer Inputs. How to Prototype & Design Computer Inputs Step 1: Review Input Requirements Step 2: Select the GUI Controls Step 3:
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE 2 PRESENTATION Bakor Kamal CIS 895.
S9k Preventive Maintenance & Equipment Inventory.
1 12 Easy Steps to Complete an Employment Contract Amendment Campus Human Resources Employment & Compensation Services October, 2009.
BRUE Behavioral Reverse Engineering in UML as Eclipse Plugin MSE Presentation 1 Sri Raguraman.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
C A S E S T U D I E S—S T R A T E G I E S F O R S U C C E S S November 7 - 9, 2002.
CIS 895 – MSE Project KDD-Research Entity Search Tool (KREST) Presentation 1 Eric Davis
HR & Payroll System. Aids analysis of employee data for reliable decision making Real time accessibility of information Track salary and personal information.
© 2008 California State University, Fullerton Account Management & Reporting Tools Financial Services Division of Administration & Finance.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
AgentTool (III) Dynamic MSE Presentation 1 Binti Sepaha.
ELP Helper MSE Project Presentation I Aghsan Ahmad Major Professor: Dr. Bill Hankley.
Online Music Store MSE Project Presentation I Presented by: Reshma Sawant Major Professor: Dr. Daniel Andresen.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
Summary Data Modeling SDLC What is Data Modeling Application Audience and Services Entities Attributes Relationships Entity Relationship Diagrams Conceptual,Logical.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
I.Information Building & Retrieval Learning Objectives: the process of Information building the responsibilities and interaction of each data managing.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
Student Curriculum Planning System MSE Project Presentation I Kevin Sung.
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
Purchasing Contracts Management System MSE Project Presentation II By: Arthi Subramanian.
Systems Life Cycle A2 Module Heathcote Ch.38.
Environment Model Building Tool MSE Presentation 1 Esteban Guillen.
MSE Presentation 1 By Padmaja Havaldar- Graduate Student Under the guidance of Dr. Daniel Andresen – Major Advisor Dr. Scott Deloach-Committee Member Dr.
NFIRS Data Entry Browser Interface (DEBI)
CCRS Comprehensive Conference Registration System Preliminary Design December 7 th,
Self-assembling Agent System Presentation 1 Donald Lee.
Natural Language to Machine Readable Format By: Damian Tamayo Presentation 1 – Oct. 12, 2009 CIS 895 – MSE Project.
Graphical User Interface and Job Distribution Optimizer for a Virtual Pipeline Simulation Testbed Walamitien Oyenan October 8, 2003 MSE Presentation 1.
SPAM Student Payroll And Management. SPAM Overview " Project Plans " Student functions " Administrator functions " Detailed Design " Technical Specifications.
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Function Points Synthetic measure of program size used to estimate size early in the project Easier (than lines of code) to calculate from requirements.
MSE Presentation 1 Lakshmikanth Ganti
Department of Computing and Information Sciences MSE Project Presentation 1 A Three-tier On-line Model For Transaction- based Applications Using VB.NET.
PRESENTATION SUPPLY CHAIN MANAGEMENT - SUPPLY CHAIN MANAGEMENT - June 2015.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
System Modules Overview
IS2210: Systems Analysis and Systems Design and Change Twitter:
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
Communication Model for Cooperative Robotics Simulator MSE Presentation 1 Acharaporn Pattaravanichanon.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Techniques for List Creation (2) Data formatting and control level processing Basics for Interactive Lists Detail lists The Program Interface Interactive.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
U.S. Department of Agriculture eGovernment Program eAuthentication Initiative eAuthentication Solution Screens Review Meeting October 7, 2003.
Architecture Review 10/11/2004
Bogor-Java Environment for Eclipse
Chapter 11 Designing Inputs, Outputs, and Controls.
District And Club database
Architecture Concept Documents
Product Development Scenario Overview
10 SYSTEMS DESIGN C H A P T E R Chapter 10 - Systems Design
Data Flow Diagram For Seed Management System
Jincheng Gao CIS895 – MSE Project
Team 21: Project Design Team Members: Nathan Staley Steven Murray
Presentation transcript:

Kansas State University Purchasing Contracts Management System (KSU – PCMS) Presentation 1 Date : 14 th October 2010 By Arthi Subramanian CIS 895 – MSE Project

Presentation Outline  Project Overview Motivation Goals System Overview Data Flow diagram  Project Modules Administrator Module User Module Use Case Diagrams  Project Schedule  Cost Estimation  Software Quality Assurance Plan  Prototype Demonstration  Questions/Comments

Project Overview Motivation Solution for helping departments at Kansas State University locate the most appropriate options for any given contract-based purchase. Goals Provide more secure and functional alternative to existing system. Ease of data entry and data retrieval. Make searchable Kansas state university contracts. Avoid human errors while entering contract details.

Project Overview System Overview

Dataflow Diagram

Project Modules Admin Module Definition: Administrator : Procurement Officer Interacts with the system through a webpage. Roles: Logs in to the system. Inserts contract details. Searches for contracts before performing edit. Edits existing contract details.

Project Modules End-user Module Definition: Users :  University officials and employees who purchase services, supplies or equipment.  Facilities, human resources, telecom department officials. Interacts with the system through a webpage Roles: UserRole University officials, employees Search for the contract details. Facilities, human resources, telecom department Search for contracts that requires the respective departments approval.

Use Case Diagram

Current System

End user Search page Expected Output

Application Requirements AR1 : User Interactive graphical user interface AR2 : Authenticate valid procurement officer AR3 : Search based on – Contract number, contract title, vendor, Procurement officer, keyword AR4 : Search by keyword must search across contract number, contract title, vendor, procurement officer, comments AR5 : Results must include details such as departments whose pre-approval is required. AR6 : Contract files (master contract document) must be made accessible through Kansas department of administration. AR7 : All contracts must be displayed when requested to do so. AR8 : For any unmatched search fields, a message with possible suggestions must be displayed. AR9 : If a contract with expiration date lesser than or equal to start date is entered by the procurement officer, a message must be displayed and further data entry must not be allowed until corrected. AR10 : Search results can be sorted in ascending/descending order.

Project Schedule Key Dates Presentation 1 Date : 14 th October 2010 End user search functionality. Presentation 2 Date : 3 rd week of November 2010 Administrator screens, user screens Presentation 3: Date : 3 rd week of December 2010 AJAX functionalities, set up on server

Project Schedule

Cost Estimation COCOMO II is used to estimate the duration and cost involved in development of a system. Considers factors such as reliability, software development complexity, memory Usage etc * EAF * (KSLOC) ^1.09 Time = 2.5 * (Effort) ^ 0.38 Effort = Number of person months (PM) Time = Duration time in months for project KSLOC = Estimated number of source lines of code for the project (in thousands) EAF = Effort Adjustment Factor Effort = 2.45*0.523*(1.8)^1.09 = 2.43 man-months Time = 2.5 * (2.43) ^ 0.38 = 3.5 months

Phase 2 deliverables  Vision Plan 2.0  Project Plan 2.0  Architectural Design Document  Software Test Plan 1.0  Technical Inspection List  Presentation 2  Prototype 2.0 Source Code Administrator module, interaction with the user module

Prototype Demonstration Questions Comments