Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
LCWS 31/5/2007Erik Johnson STFC,RAL1 ILC Vertex Detector Mechanical Studies Erik Johnson On behalf of the LCFI collaboration STFC, Rutherford Appleton.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
CALICE: WP4 Thermal and Mechanical Roger Barlow Cambridge 10 September 2005.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
ATLAS: Setting the Scene Fred. ATLASHardware Ray Production Assembly Joe QA Data base Jo Reception Testing Trigger Thorsten L1/HLT Physics Sarah (Fred)
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
Dan Peterson, Cornell University Presented at the Workshop on Detector R&D Development of a Low-Material TPC Endplate for the ILD Experiment at.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
An alternative spectrograph mount Bruce C. Bigelow University of Michigan Department of Physics 5/14/04.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
ATLAS micromegas activities (MAMMA)
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/28/2012.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
Dec
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Overview of detector requirements Purpose: To put today’s session into context. Steve Watts and Krzysztof Piotrzkowski.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Roman Pots and Microstations based on talk by Jaak Lippmaa Helsinki CERN 2005.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
Two-beam module layout
Jaak Lippmaa HIP, Helsinki University
Oleg Vasylyev, GSI Helmholtz Center, Darmstadt, Germany
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
CALICE: Thermal, Mechanical and Assembly issues
Scott Wakely University of Vengeance
Simulated vertex precision
Vertex Detector Mechanical R&D Design Questions and Issues
Low Mass mechanical design
Hybrid Mechanical/Thermal Design ideas
SIT AND FTD DESIGN FOR ILD
L H C A T L A S International Collaboration on the LHC Project
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Presentation transcript:

Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin

Detector pockets Beam pipes Beam line Cryo interfaces mm

Manchester responsible for detector Hybrid precision assembly Materials Carbon –Carbon Silicon/Aluminium alloys Possible hybrid and Station Designs ~10 hybrid planes /station 3D silicon Detectors + bumped to Atlas Readout chip Detector positioning to few microns Use atlas SCT equipment Low mass in detector area -20 c Heat removal Controller Chip

Possible precision mounting of detector station assembly

Initial thermal measurements SMT resistors to simulate chips Water 15C 3D Survey using Smartscope Alignment Dowel Spring force Hardened Rod Touch Bearings for alignment Fiducial Dots

Future Further integration with electrical design. Thermal / stress finite element simulation – Mssl Jan N ext round of mechanical models - Silicon Resistors from Chris Kenny Aim for working prototype in test beam for August Longer Term Design Review Nov 07 Production 08 Assembly / Instalation winter 08/09