October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Oct 24, 2007 C.Spencer Magnet EDR Planning 1 GDE Generating Magnet Work Packages: Planning for the Engineering Design Phase Cherrill Spencer, SLAC with.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
Fermilab February 1, 2007 J. Tompkins -1- Comments on the EDR and Magnet Systems JCT for the Magnet Systems Group
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Review of e- source for the low power Option and status update Axel Brachmann, John Sheppard BAW2, SLAC 1/18/2011.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Axel Brachmann, John Sheppard, Vinod Bharadwaj SLAC Particle Sources Efforts Review/Status and Plans SLAC HEP Program Review June 13 th, 2007.
September 10-14, 2007 XIIth International Workshop on Polarized Sources, Targets & Polarimetry, Brookhaven National Laboratory (BNL) 1 Polarized Electron.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort Accelerator System Kick-off Meeting e- Summary Day 1 25 Sept 2007 SLAC Marc Ross.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
ILC Beam Instrumentation – Introduction Remarks –
Oct 22 Group Leaders Planning meeting
ILC RTML Meeting EDR Planning for Magnet Power Systems
Polarized e- Source Design and R&D 10/24/05
The ILC Control Work Packages
EDR HLRF Work Packages Draft Summary
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
SRF Gun at ELBE Work package 10, Task 7 Jochen Teichert
Electron Source Configuration
Summary for the Sources working group
ELIC Injector Working Group High-P, high-I source issues (DC)
Advanced Research Electron Accelerator Laboratory
MEIC Cost Estimate Overview
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Injector/Linac Design Status C. E
Presentation transcript:

October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann

October 25, 2007 A. Brachmann Slide 2 Agenda ‘Kick-off’ meeting Work Packages Expression of Interest Form EDR R&D

October 25, 2007 A. Brachmann Slide 3 EDR ‘Kick Off Meeting’ Review of RDR design Identify gaps and refinement possibilities crucial to cost optimization –Examples Magnet apertures CF&S cost breakdown Dump/ Dump service enclosures Do we need separate cryoplant ? Include groups into work planning on international level EDR Plans and Expectations –Development and implementation of policies and procedures –Responsibilities –Work Packages –Definition of high priority R&D needs

October 25, 2007 A. Brachmann Slide 4 GDE EDR Electron Source Work Packages Source Drive Laser SystemMagnet System Polarized DC GunPower Supplies Polarized Photo CathodesHLRF Bunching System and NC RF structures LLRF/Controls Dumps and CollimatorsInstrumentation Polarization issuesVacuum System Accelerator PhysicsCryogenics CF&S and InstallationCryomodules System Design – OptimizationAdvanced R&D High Level Work Packages

October 25, 2007 A. Brachmann Slide 5 EOI Solicitations Based on defined Work Packages. Some responses so far. –Resource availability only partially adequate Expect more responses after this meeting.

October 25, 2007 A. Brachmann Slide 6 Example of ‘Sub – Work Packages’ Button/Stripline BPM’s Wirescanners Laser Wires OTR’s DMC’s (LOLA) WMC’s Toroids Faraday cups Macine Protection devices Polarimetry Feedbacks Instrumentation

October 25, 2007 A. Brachmann Slide 7 Suggested e- or e+ WP Major Milestones (Magnet systems; preliminary version) 1. Magnet and PS requirements and specificationsFebruary 1, Conventional (room temp) magnets and DC PS conceptualOctober 1, 2008 designs 3. Superconducting solenoid conceptual design December 1, Magnets – PS- cables optimization October 1, All magnets’ integration details & beamline layout drawings February 1, Detailed costs of all magnet styles July 1, Overall fabrication, measurement, installation & repair plans February 1, Finish writing e- & e+ magnets and PS chapters of EDR May 1, 2010

October 25, 2007 A. Brachmann Slide 8 How to evolve a Magnet System Group : Spencer’s idea Institutions are proposing to do work on certain magnet & power supply tasks for particular areas They will have funds to do these work packages and so they’ll have paid-for magnet or PS experts Policy would be: if you are doing a magnet or PS work package you must provide a fraction (TBD) of your magnet expert’s time to work on magnet system group ILC-wide tasks I reckon we would have at least 8 people generated by such a policy; equivalent to at least 2 FTEs Group would also help review proposals for work packages and enforce design & material standards

October 25, 2007 A. Brachmann Slide 9 Technical Systems Work Package Description Excerpt from Magnet Power Systems Work Package Description: Work Package Details (Continued) Deliverables from Work Package 1.Magnet / power supply list 2.Power supply/controls designs, specifications 3.Power system layout drawings 4.Electrical interconnect (EI) diagrams 5.Reliability / FMEA analyses 6.Identification of industry partners 7.Acquisition, build plan and schedule 8.Input for EDR report Major Milestones (including key decision points) 1.Interfaces, relationships, collaborations established or strengthened 2.Power system design 3.Reliability / FEMA analyses 4.Equipment profiles, power system and raceway layouts 5.Equipment specifications 6.Cost estimate, acquisition plan, schedule and EDR input Resources required (eg expertise, facilities, leader, …) 1.Power Electronics Engineer, (Lead) 2.Pulsed Power Engineer 3.Controls Engineer 4.Electronic Designer/Coordinator 5.Raceway Designer/Coordinator

October 25, 2007 A. Brachmann Slide 10 R&D Work Packages during EDR Phase  High Priority  Support EDR Baseline Design Source Laser System DC Gun Photo Cathodes Integrated System

October 25, 2007 A. Brachmann Slide 11 Laser System Development of source laser system addresses two issues: –Laser Technology that needs to be developed for the ILC –Needed to understand performance of photo cathodes under ILC conditions Challenge: 16 W average power laser system with ILC bunch train format  Work in progress  Proof of principle system by 2010

October 25, 2007 A. Brachmann Slide 12 Photo Cathodes for the ILC Source Baseline: strained GaAs/GaAsP –Must deliver ~ 90 uA beam (SLC 2uA) Current PC’s are optimized for SLC conditions, not ILC. Issues are not primarily QE or polarization but: –Surface charge limit (SCL) under ILC conditions –Indication from cw machines indicate that SCL may play a role –We do not know impact of SCL on ms timescale Effect SCL can only be determined using appropriate laser system.

October 25, 2007 A. Brachmann Slide 13 DC Gun Development Program Baseline is 140 – 160 (200) kV DC gun Challenge is to minimize Ion back-bombardment of the Photocathode (destruction of NEA surface)  Optimize HV design Address space charge limit, minimize dark current, push breakdown limit  Vacuum system ( Torr) minimize destructive species near photocathodes Currently R&D program is taking place at Jlab and University of Nagoya We also anticipate further contributions from KEK and University of Hiroshima

October 25, 2007 A. Brachmann Slide 14 SBIR’s Support of R&D program through ‘non-ILC’ funding but very important contributions for source development Baseline design and advanced R&D towards future design options –Laser system development –Photocathode development –Advanced R&D such as RF guns for polarized electrons