LHC Electronics Workshop, Amsterdam, 20031 The MGPA ECAL readout chip for CMS Mark Raymond, Geoff Hall, Imperial College London, UK. Jamie Crooks, Marcus.

Slides:



Advertisements
Similar presentations
Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
Advertisements

SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
The NO A APD Readout Chip Tom Zimmerman Fermilab May 19, 2006.
January, 2003CMS Ecal MGPA Design Review1 MGPA design review architecture overview and specifications detailed architecture top level functional block.
18/05/2015 Calice meeting Prague Status Report on ADC LPC ILC Group.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
NA62 front end Layout in DM option Jan Kaplon/Pierre Jarron.
NA62 front end architecture and performance Jan Kaplon/Pierre Jarron.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Calorimeter upgrade meeting – CERN – October 5 th 2010 Analog FE ASIC: first prototype Upgrade of the front end electronics of the LHCb calorimeter E.
Analogue Electronics II EMT 212/4
14-5 January 2006 Luciano Musa / CERN – PH / ED General Purpose Charge Readout Chip Nikhef, 4-5 January 2006 Outline  Motivations and specifications 
0.25 mm CMOS electronics in CMS
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Mark Raymond /10/051 Trip-t testing brief status report test setup description - hardware and software some very early results.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. CMS Binary Chip (CBC) status 130nm CMOS chip for short strip readout at sLHC contents introduction.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
M. Raymond, Imperial College London IEEE NSS, Rome The MGPA ECAL readout chip for CMS Mark Raymond, Geoff Hall, Imperial College London, UK. Jamie.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
P. Baron CEA IRFU/SEDI/LDEFACTAR Meeting Santiago de Compostela March 11, A review of AFTER+ chip Its expected requirements At this time, AFTER+
July, 2002CMS Tracker Electronics1 APV25 wafer testing Outline Mark Raymond, Imperial College Wafer test procedure speed improvements.
October, 2001CMS Tracker Electronics1 Module studies at IC OUTLINE laboratory setup description, APV I2C settings pulse shape studies (dependence on ISHA,
9th July, 2003CMS Ecal MGPA test results1 MGPA test results first results presented 25 th June – repeat here + some new results testing begun 29 th May.
1 VFE/MGPA considerations for EE/VPT EB/EE electrical spec. differences: full-scale signal noise input capacitance dominated by: APD capacitance (x2) for.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
January, 2003CMS Ecal1 MGPA Specification Discussion – 9 th Jan. 03 OUTLINE 3 or 4 gain channels discussion technical background - why 3 gains could be.
Trip-t testing progress report
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
HEXITEC ASIC – A Pixellated Readout Chip for CZT Detectors Lawrence Jones ASIC Design Group Science and Technology Facilities Council Rutherford Appleton.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
M. Raymond, Imperial College London IEEE NSS, Rome The MGPA ECAL readout chip for CMS Mark Raymond, Geoff Hall, Imperial College London, UK. Jamie.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Fermilab Silicon Strip Readout Chip for BTEV
1 UA9 telescope first ideas Rome – 12/3/2010 Mark Raymond –
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 MGPA Linearity Mark Raymond (Dec.2004) Non-linearity measurements in the lab hardware description method results.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
December, 2002CMS Ecal1 MGPA status Design progress since October: main efforts on process spread simulations -> look for robustness to manufacturing tolerances.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
25 juin 2010DPallin sLHC_Tile meeting1 Tilecal VFE developments at Clermont-Ferrand June 2010 Status G Bohner, J Lecoq, X Soumpholphakdy F Vazeille, D.
M. Atef, Hong Chen, and H. Zimmermann Vienna University of Technology
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
A 12-bit low-power ADC for SKIROC
A General Purpose Charge Readout Chip for TPC Applications
MGPA version 2 submission status – Mark Raymond / Jamie Crooks (RAL)
CTA-LST meeting February 2015
Analogue Electronics Circuit II EKT 214/4
Resolution Studies of the CMS ECAL in the 2003 Test Beam
R&D activity dedicated to the VFE of the Si-W Ecal
APV25 Production Testing & Quality Assurance
CALICE COLLABORATION LPC Clermont LAL Orsay Samuel MANEN Julien FLEURY
LHCb calorimeter main features
MGPA status Mark Raymond (4/9/02)
X. Zhu1, 3, Z. Deng1, 3, A. Lan2, X. Sun2, Y. Liu1, 3, Y. Shao2
BESIII EMC electronics
Presentation transcript:

LHC Electronics Workshop, Amsterdam, The MGPA ECAL readout chip for CMS Mark Raymond, Geoff Hall, Imperial College London, UK. Jamie Crooks, Marcus French, Rutherford Appleton Laboratory, UK. OUTLINE Introduction Design Measured Performance Conclusions 9 th Workshop on Electronics for LHC Experiments, Amsterdam, 2003 Multi–Gain Pre-Amplifier  m CMOS chip for CMS ECAL

LHC Electronics Workshop, Amsterdam, New CMS VFE (Very Front End) architecture MGPA 12 bits 2 bits LOGIC Multi-channel ADC opto-electric barrel: APD endcap: VPT CMS ECAL Lead Tungstate crystal calorimeter with APD/VPT readout for barrel/endcap General approach use multiple gain ranges -> high resolution with only 12 bit ADC only transmit value for highest gain channel-in-range => have to take decision on front end Previous architecture range decision taken in preamplifier (complex chip), followed by single channel commercial ADC New architecture 3 parallel gain channels (MGPA), multi-channel ADC, range decision taken by logic in ADC chip use 0.25  m CMOS to take advantage of: radiation hardness system simplifications: single 2.5V supply, power savings short production turnaround, high yield, cheaper Short timescale for development design begun mid 2002, submission early 2003, die received May 2003, packaged die since August

LHC Electronics Workshop, Amsterdam, MGPA Target Specifications ParameterBarrelEnd-Cap fullscale signal60 pC16 pC noise level10,000e (1.6 fC)3,500e (0.56 fC) input capacitance~ 200 pF~ 50 pF output signals (to match ADC) differential 1.8 V, +/ V around Vcm = (Vdd-Vss)/2 = 1.25 V gain ranges1, 6, 12 gain tolerance (each range) +/- 10 % linearity (each range) +/- 0.1 % fullscale pulse shaping40 nsec CR-RC pulse shape matching (Vpk-25)/Vpk < 1 % within and across gain ranges Barrel/Endcap read out using APD/VPT different capacitance and photoelectric conversion factors spec. review -> 3 gain ranges sufficient to deliver required performance -> MGPA design easier Additional calibrate feature -> not precision but allows charge injection to each front end chip Vpk-25Vpk

LHC Electronics Workshop, Amsterdam, MGPA Architecture RFRF charge amp. R G1 diff. O/P stages CFCF V CM CICI RIRI gain stages RIRI DAC I 2 C and offset generator ext. trig. 1 st stage R F C F = 40 nsec. (avoids pile-up) choose R F C F for barrel/endcap external components => 1 chip suits both 3 gain channels 1:6:12 set by resistors (on-chip) for linearity differential current O/P stages external termination 2R I C I = 40 nsec. => low pass filtering on all noise sources within chip calibration facility prog. amplitude needs ext. trigger I 2 C interface to programme: output pedestal levels enable calibration feature cal DAC setting C CAL R G2 R G3 I/P V CM CICI RIRI RIRI CICI RIRI RIRI RFCFRFCF i i i

LHC Electronics Workshop, Amsterdam, Noise Sources C IN v FET 2 v Rpf 2 R pf charge amp. s.f. RGRG diff. O/P gain stage C pf V CM CICI RIRI transconductance gain stage i CGFET 2 i RG 2 1 st stage Rpf dominates: 4900 electrons (barrel: Cpf//Rpf = 33 pF//1k2), 2700 (endcap: Cpf//Rpf = 8p2//4k7) I/P FET: W/L = 30,000/0.36, gm ~ 0.3 A/V -> 1800 electrons (barrel, 200pF), 660 (endcap, 50pF) => no strong dependence of overall noise on CIN gain stages high and mid gain ranges, R G low (few 10’s  additional noise small low gain range, R G (240  and CG FET noise dominate and spec. exceeded (factor ~3) but lowest gain range used for biggest signals => electronic noise contribution to overall energy resolution very small (for this range)

LHC Electronics Workshop, Amsterdam, Chip Layout I2C 1 st stage high gain stage diff. O/P stage offset gen. layout issues gain channels segregated as much as poss. with separate power pads -> try to avoid inter-channel coupling lots of multiple power pads die size ~ 4mm x 4mm packaged in 100 pin TQFP (14mm x 14mm) mid gain stage low gain stage diff. O/P stage

LHC Electronics Workshop, Amsterdam, Test Setup Pulse Gen. MGPA test board Programmable Attenuator True rms milli-voltmeter Scope diff. probe early tests used bare die – packaged chips only available more recently priority given to measurements for barrel gain (60 pC fullscale)

LHC Electronics Workshop, Amsterdam, Pulse Shape Measurements Volts time [nsec] low gain rangemid gain rangehigh gain range O/P signals probed individually 0 – 60 pC, 40 steps saturation in mid and high gain ranges no clamping outside linear range

LHC Electronics Workshop, Amsterdam, Differential Pulse Shape Measurements Volts time [nsec] low gain rangemid gain rangehigh gain range differential O/P signals (diff. probe) 0 – 60 pC, 40 steps no obvious signs of distortion in lower gain ranges => effective gain channel segregation in layout gain ratios 1 : 5.6 : 11.3 (c.f. 1 : 6 : 12) linear range

LHC Electronics Workshop, Amsterdam, Linearity: High Gain Channel spec. linearity [% fullscale] Linearity [% fullscale] = peak pulse ht. – fit (to pk pulse ht) X100 fullscale signal relative signal size linearity within (or close to) spec for a range of gain stage bias currents => not v. sensitive to bias conditions 5.4 pC

LHC Electronics Workshop, Amsterdam, Linearity: Mid and Low gain channels spec. linearity [% fullscale] relative signal size midlow similar picture to high gain channel 11 pC60 pC

LHC Electronics Workshop, Amsterdam, Pulse Shape Matching normalise to max pulse ht. pulse shape matching important within and across gain ranges to quantify use pulse shape matching factor, PSMF = Vpk-25 Vpk Vpk-25 pulse shapes for all 3 gain ranges (11 steps / range) all 33 pulse shapes overlaid pulse height [Volts] time [nsec.]

LHC Electronics Workshop, Amsterdam, Pulse Shape Matching spec. Pulse shape matching [%] = (PSMF – Average PSMF) x 100 Average PSMF (Average PSMF = average over all pulse shapes and all 3 gain ranges) relative signal size [1=fullscale] pulse shape matching [%] pulse shape matching close to spec. (+/- 1%)

LHC Electronics Workshop, Amsterdam, Noise Barrel (33 pF // 1.2k) Cstray (~20 pF) Cstray pF simulation 200 pF high7,0007,8506,200 mid8,2509,1008,200 low~ 28,000 35,400 use wide bandwidth true rms meter (single ended I/P) => need diff. to singled ended buffer circuitry (adds some extra filtering) => extra buffer noise contribution to subtract weak dependence on input capacitance as expected estimated errors: ~ 10% high and mid-gain ranges, ~ 20% low gain range (buffer circuitry dominates here) Endcap (8.2 pF // 4k7) Cstray (~20 pF) Cstray + 56 pF simulation 50 pF 2,9003,0502,700 3,3003,4503,073 ~ 8,500 9,800 within spec. < 10,000 (barrel) < 3,500 (endcap) electronic noise not significant for low gain range

LHC Electronics Workshop, Amsterdam, Radiation Tests 10 keV X-rays (spectrum peak), dosimetry accurate to ~ 10%, doserate ~ 1 Mrad/hour, no anneal ~ 3% reduction in gain after 5 Mrads (2 x worst case) no measurable effect on noise lowmidhigh pre-rad 5 Mrads

LHC Electronics Workshop, Amsterdam, I 2 C Pedestal Adjust Volts nsec. I2C=0 I2C=50 I2C=100 VCM ADC I/P range High gain range, ~ fullscale signal. I2C pedestal adjust sets offset current to diff O/P stage (one for each gain range) I2C ~ 50 about right in this case

LHC Electronics Workshop, Amsterdam, On-chip Calibration ext. 10pF MGPA I/P Volts nsec. simple DAC allows programmable (I 2 C) amplitude charge injection -> range of signal sizes for each gain range external trigger required allows functional verification during chip screening and in-system I2C external edge trigger

LHC Electronics Workshop, Amsterdam, Power, Yield, Things to fix Power consumption bias currents to all stages set by external resistors 240 mA drawn from 2.5 V rail => 600 mW (1 st stage: 150, gain stages: 300, diff. stages: 150) Yield appears very high, e.g. only one faulty chip found in basic tests on ~ 50 chips Things to fix/change high frequency instability around first stage ext. feedback components + packaging/PCB layout capacitance + bond inductance -> LC resonance can be made stable insert small series damping resistors and reduce bandwidth better fix? – needs more study add on-chip reference for offset bias generator modify default I 2 C settings I/P Vs

LHC Electronics Workshop, Amsterdam, Conclusions First iteration of MGPA successful Analogue performance good gain linearity pulse shape matching noise rad-hard as expected What next? Verify performance can be maintained in system in conjunction with APD (& VPT), ADC, rest of FE components - work already underway at CERN timescale short - next submission (engineering run) soon within (or v. close to) spec.

LHC Electronics Workshop, Amsterdam,

LHC Electronics Workshop, Amsterdam,