Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

T1 status and plans INFN Genova November 2014 Collaboration Meeting.
M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu. Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Walls crates cables gas chambers electronics CERN adb.
Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
MUON piquet report 18/9 -24/ Nikolai Bondar.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Problems with Muon System N. Bondar O.Maev
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Muon Stations M2-M5 Hardware status Outline: Gas System status UF/PNPI HV-system status Remaining M2-M5 installation tasks – Air cooling system status.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
TC meeting P2 planning wks 3&4 A.Tauro
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Injectors BLM system: PS Ring installation at EYETS
Renovation of the 45-year old PS magnets
DT Infrastructure: LV, HV, Gas
EYETS septa status Septa activities TE/ABT Thierry Masson
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
CBM Project Walter F.J. Müller, FAIR, Darmstadt
Presentation transcript:

Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013

Present Status Maintenance and consolidation activities: – Grounding improvement done on: M2A-C front, M2A-back, M3A-Front, M3A back ongoing (2 chambers unmounted). Still 7 chambers to go. – PS and Turbines maintenance: PS DONE! Turbines on B1 (primary PS) and D3 (TELL1 crates) under maintenance HV doubling (PNPI): – Hardware of A-side is ready to be tested – Master modules for C-side ready, the HW installation will be completed by the end of Jan. Migration to WINCC completed apart a few HV projects. It was not possible to check if everything is still working due to the PS and cooling not available. We are turning on the system now. For more details please refer also to the e-log: 2

Proposed Plan for the next activities Detector Consolidation: By Jan 31-st: end of work on chambers (grounding improvement, ferrite filters, etc..) on A-side 3-4 weeks in Feb. for the commissioning of A-side: – Connectivity test – Threshold scan – Noise run – Fix possible problems Moving of nacelles to C-side (~1-1.5 weeks, end of Feb. beginning of march) Start work on C-side (~3 months, until end of May) Commissioning of C-side (June) ECS Check of projects migration as soon as the detector is ON (hopefully already in the next days, if water cooling is stable….) ECS meeting on Jan. 30 to organize the work toward ECS 2.0, Davide will send more infos asap 3

Proposed Plan for the next activities (II) HV-Doubling Hardware of A-side is ready to be connected and tested, C-side will be ready by end of Jan. We need 2 Credit Card PCs for the control system, control programs have to be installed on them (Mikhail) ECS-HVprojects should be updated asap (in Dec. it was not possible due to PCs off for cooling shutdown) Tests of the whole doubled system with HV cables unplugged from chambers Cables connections 4

Next Commissioning/Operation Weeks (not yet decided but very likely): Feb. 3-7 Mar May 5 – 12 June 30 – July 4 5 Proposed Plan for the next activities (III)