F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.

Slides:



Advertisements
Similar presentations
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Advertisements

EDIT-2012 Detector School at Fermilab First school at CERN was a response to a strong need, as shown in ICFA survey Big success, with 88 students participating.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
JINR plan for FCAL R&D JINR DLNP group status report and plans (Z. Krumstein, G. Shelkov)
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Muon g-2 Installation Schedule All Experimenters Meeting June 16, 2014 Aria Soha Muon g-2 I&I Manager.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Recent Activity at the Upgraded Test Beam Facility Erik Ramberg AEM 16 April, 2007 Open House and ILC Workshop New Test Beamline Layout and Performance.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting October 20, 2014.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 26, 2015.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
SAXS/WAXS Conversion for Beamline Engineering Review.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Progress report Collaboration meeting 23-SEP-2009
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Fermilab Test Beam Facility Aria Soha September 19, 2011.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
Fermilab Test Beam Facilities David Christian Fermilab Science and Technology Review November 5, 2013.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
LHC Science Goals & Objectives
The LHCb Installation Story
News and brief overview of Beamline plans for the next few months
LHCf – CSN1 Trieste O. Adriani
K. Kawagoe (Kobe-U) 30-Mar-2010 LCWS10 in Beijing
End Station Test Beam (ESTB) at SLAC
L H C A T L A S International Collaboration on the LHC Project
GEANT Simulations and Track Reconstruction
Presentation transcript:

F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014

Latest Experiments Jan 22 – Feb 4 –T-1042 (Muon g-2) –T-992 Rad-Hard Sensors for SLHC Feb 5 – 26 super PHENIX –T-1044 – 5 ton Hadron calorimeter –T-1048 – Time-of-flight system –T-1037 – (FLYSUB) GEM detectors –T-1054 – pre-shower calorimeter

Current Status sPHYNIX taking data Rotating table available! (and other small stages) MCenter Control Room: –Heat On! –Shielding blocks in place (to shield muon plume) –Moving Furniture (racks) in MCenter beamline: –MC2 Quad replacement (6 days to go) –Interlocks: Chipmunks & Key tree being placed Other LAriaT work: –Wire Chambers waiting on TDC’s, being assembled.

Up Coming Experiments Feb 26 – Mar 19 –T-1018 – Spacordian Tungsten Fiber Calorimeter (UCLA) (STAR) –T-1036 – CMS High Rate Pixel tracker (Make-up slot) Mar 19 - –T-1041 – CMS Forward Calorimeter

TSW’s In Progress T-1048, approved (taking data) T-1049, waiting on experimenter feedback T-1054, approved (taking data Weds) –extreme processing! T-1055, processing Technical Scope of Work

ADDITIONAL SLIDES

Facility Usage

Facility Weekly Usage

Experiments & TSWs

Beam Delivery