Outcome of HBW damper Review of 30.07.2013 W. Hofle LIU-SPS HBW damper review LIU SPS Coordination, 28.08.2013.

Slides:



Advertisements
Similar presentations
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Advertisements

SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
Information Systems Development Lecture 2: the idea of the Life Cycle.
Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement:
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.
Summary of visit to BNL and LARP workshop High Bandwidth Feedback perspective Preliminary Report by W. Hofle
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Transverse Feedbacks against ECE at SPS and LHC W.Hofle CERN BE-RF-FB on behalf of a multi-lab team CERN – SLAC – LBNL – LNF-INFN W. -
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
Rob Connatser NSS Instrument Work Packages and XLPM.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
LIU-PS Beam Dynamics Working Group Introduction and objectives
Plans towards CC in the LHC a US – centric perspective
Transverse Damping Requirements
People who attended the meeting:
Installation of an Instrument on a CERN machine
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Longitudinal impedance of the SPS
Proposals for 2015 impedance-related MD requests for PSB and SPS
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Upgrade Strategy for the Experimental Vacuum Systems
Beam Gas Ionization Monitor (BGI)
¼ meshed models for Omega3P calculations
Scrubbing progress - 10/12/2012
Limits on damping times
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Two beam coupling impedance simulations
Presentation transcript:

Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,

Objectives Review to cover: Motivation, specification, performance, technology (kicker choice), milestones, deliverables, project organization, responsibilities and schedule Aim is to agree baseline for upgrade path, and to highlight potential problem areas

Specific questions for reviewers 1.Are the beam and system specifications clearly defined? If not what studies are still needed? 2.Is the system concept feasible for the required applications? 3.Can the choice of kicker technology for the final system be made now? If not, what information is still needed? 4.Is the planned development, construction and installation schedule correct (i.e. complete with all activities and deadlines, realistic, conforming to CERN's needs and fitting with collaborators' constraints)? 5.Is the project structure clearly defined, including list of deliverables and responsibilities for deliverables and studies? 6.Are the responsibilities correctly assigned, or should some be re-discussed? 7.Are there deliverables or studies which need advancing in time, for example before the LARP construction decision? 8.Is the additional impedance of the system known, and acceptable for the SPS?

Organisation Reviewers: –Gianluigi Arduini, CERN –Mike Brennan, BNL –Fritz Caspers, CERN –Rhodri Jones, CERN (Chair) –Dmitry Teytelman, DIMTEL Inc. Report: 6 pages available

Timetable

General Findings Current focus: vertical ecloud instability in SPS, no need for TMCI test bed for LHC SPS scrubbing efficiency SPS relevance for LHC: prepare doublet scrubbing beam for LHC stay flexible enough to extend to H-plane if required Strong recommendation to move to multi-bunch beams a.s.a.p. Experimental verification with multi-bunch beams before full implementation decision in 2016  Wide band kicker is highest priority: post review decision: parallel paths: strip-lines (implementation for start-up after LS1), LBL proposal TEM slotline kicker (longer lead team), Faltin type both projects within RF-PM section (E. Montesinos), staffing !

Q1 Main items for specification are BW and kick strength Need for more experimental evidence to support requirement for BW Need for more simulations to demonstrate BW required for higher energy No need for 200 MHz bunched beam, only V-plane for 25 ns Strong request to treat scrubbing doublet beam Cross talk to H-plane needs attention Simulations mainly for Q26 optics, but issue with Q20 controller design Kick strength: need for full analysis of resolution including noise  Recommendation: Open loop simulations simulations vs. energy Use ideal kicker to understand phase margins, include chromaticity Adapt FB algorithm to achieve stability at Q20 Understand 2012 demonstrator “Are the beam and system specifications clearly defined? If not what studies are still needed ?”

Q2 Yes, if simulations show that there is no need for > 1 GHz If more BW is required, consider partitioning the system Pus, strip-lines and slotted PU look feasible, common mode suppression SW and HW equalizers need to be studied Scrubbing Beam: need for demonstration during splitting process, coexistence with existing damper Injection transients !  Recommendation: Full Noise Analysis Analysis of Injection transients “Is the system concept feasible for the required applications?”

Q3 Priority: Get a high bandwidth kicker installed a.s.a.p. Parallel approach recommended: strip-lines and Faltin type Heat loss study Field uniformity Required bandwidth and kick strength “Can the choice of kicker technology for the final system be made now? If not, what information is still needed?”

Q4 (8) Slotted kicker: Z/n|| =   negligible in SPS, 10  (but not LHC) Slotted kicker transverse impedance 100 k  /m, ok (cf. 7 M  /m) Strip-lines, some estimates were presented, but needs more work (short bunches) Heating by beam is significant and needs careful consideration “Is the additional impedance of the system known, and acceptable for the SPS?”

Q5 (4) Clear time line and plan presented : Multi-Bunch 1 GHz demonstrator HW Full Function system in 2019 Need system right after LS2, no room for delays Kicker a.s.a.p. Continued support from LARP and US a concern, alternative solutions for funding need to be studied “Is the planned development, construction and installation schedule correct (i.e. complete with all activities and deadlines, realistic, conforming to CERN's needs and fitting with collaborators' constraints)?”

Q6 (5) rather well defined Fully function system deliverables need definition Need for formal collaboration agreement “Is the project structure clearly defined, including list of deliverables and responsibilities for deliverables and studies?”

Q7 (6) High level of expertise, correct mix, continue collaborating More CERN involvement in electronics design, open hardware (?) CERN engineers to help in design to be identified “Are the responsibilities correctly assigned, or should some be re- discussed?”

Q8 (7) Multi bunch demonstrator a.s.a.p. even if not perfect invaluable experimental results expected, needed to continue Kick strength and bandwidth required remains a priority “Are there deliverables or studies which need advancing in time, for example before the LARP construction decision?”

Follow-up and Action By Working Group and Web Meetings E. Montesinos agreed to take on kicker work Kicker Design Report, Draft to Brennan this week, Simulations (Headtail) to resume in October Visit SLAC in October to discuss electronics development (D. Valuch) Instrumentation for Start-up (scrubbing), need support ABP for MDs